ANNOUNCEMENT FOR THE MEETING
A meeting is planned to be held in Ayanclk Public Training Center between the hours 10:0014:00 on 14.10.2009. with the attendance of iLK ELEKTRiK ENERJi (iLK POWER
ENERGY) in order for the exchange of ideas and views concerning the potential effects of the
Ayancik HES (Hydroelectric Power Plant) power capacity of which is 15,6 MW
All people living in the region are invited to the meeting.
We hope that maximum attention will be paid concerning the attendance for the meeting and
announce this meeting with all due respect.
Public Disclosure Authorized
Public Disclosure Authorized
Public Disclosure Authorized
Public Disclosure Authorized
E2065 V6
Muhammet Sen
Headman ofBaba~ay ViI.
Signed and sealed
Ya~ar Demirel
Headman of Golkoy ViI.
Signed and sealed
Sadlk SEN
Headman ofHacioglu ViI.
Signed and Sealed
----------"".-
-::i,ll
\/e;minli
....
-_.. - ..
"
..,
i
tercumanlnl"
A~().~w..(\,:\ .. .c.Q..uW:.aflnd
, ':ni
...
~
1 '
................... aslmdan .................. .":'·
c':\',!I:", OU\.',=i'mu ve asilna uY',
,:U onay!anm.
,
Ii
"-'' ' ' '_"_,,_,_,, "______ ",,"" _______.J
, ....
"""": It 1 ,
WWw.karanfi""1tr::.f·l"ume
'.com
REPORT
The introduction and public availability meeting concerning the Ayanclk HES ( Hydroelectric
power plant) Project which is carried out under our commitment was held by iLK
ELEKTRiK ENERJi URETiM SAN. Tic. A.S. ( iLK POWER ENERGY GENERATION
IND. TRA. INC. CO.) in Ayanclk Public Training Center between the hours 10:00 - 14:00 on
14.10.2009. The first stage of the meeting was started with informing the public on the
project and the meeting was continued with question-answer sessions and at the last stage of
the meeting was ended with the complaints of the attendants and the resolutions to be
provided for these complaints. The signature list of the people who attended the meeting is
enclosed.
iLK ELEKTRiK ENERJi ORETiM SAN. TiC AS
ILK ELEKTRIK ENERJI ORETiM SAN. Tic AS
( iLK PWR. EN. GEN.INO. TRA INC CO)
( iLK PWR. EN. GEN. IND. TRA. INC CO)
Oguzlar Mah. 45. sok. No: 3/5 Balgat ANK
Oguzlar Mah. 45. sok. No: 3/5 Balgat ANK
Tel 0312 287 0459 fax: 0312 287 06 59
Tel 0312 2870459 fax: 0312 287 06 59
Ba~kent
Tax Oep. - BA YRAM GOK<;E
Ba~kent
Tax Oep
Signed
Signed
Sadlk Sen
Headman of HacIOglu ViI.
Signed
ibrahim Atay
Cons. Eng.
Cham. Reg: 69036
Dip.No: 998-41210
Mehmet Can
Headman ofCevizli ViI.
Signed and Sealed
Muzaffer Akm
Headman ofTevfikiye ViI.
Signed and Sealed
KlRANFIL TRANSLA ON SERVf(ES
Uslu Ha
ieJ~~()I'
F.un
.~
'd. ~","(II Sokak
iSS Kmlay Ankara
T
,_
!
t~\,(
Muhammet Sen
Headman of Baba.;:ay ViI.
Signed and Sealed
Cemil BASAR
Headman ofYenikonak ViI.
Signed and Sealed
Mehmet Ozcan
Headman ofPazarcik ViI.
Signed and Sealed
Me),u!lye!
Hiiseyin C;elikkaya
Headman ofC;amyayla ViI.
Signed and Sealed
) 41 a7S37
41fJ7431
To the best of my knowledge and ability,
I attest this to be a true and complete
translation of attached text.
Certified Translator
~~rol.'.
MEETING REPORT
Mr. Ersin Taranoglu has acknowledged all attendants of the introduction meeting of the
Ayanclk HES ( Hydroelectric power plant) Project which was held between the hours 10:00 14:00 on 14.10.2009 and has individually introduced his colleagues working for this project
and after the introduction he has underlined the importance and significance of this type of
projects and also the advantegous contributions of these projects to the Turkish Economy and
he has put forward that: It is possible to observe from the reports of the related departments
of the Turkish republic such as Dsi (Public Waterworks Administration) and other
institutions that million metercubes of water flowing from the rivers and streams of our
country is directly flowing down to the seas without being utilized. As a matter of fact, a part
of this water is used as fresh water or used for irrigation however this amount is not higher
than the 10-15% of our running waters. However, if regulators can be provided on these rivers
which can regulate the flood flows of the rivers for a period of 50 or 100 years, the water at
definite flow rates can be taken and utilized for the energy production and the devastation
caused by water can be prevented.
He also added that; the employees of the "iLK ENERJi" are the most accurate source of
information for the people and they are always ready for informing all our citizens. It has been
rumoured that this HES ( Hydroelectric power plant) Project does not even have a project
draft due to the misleadings coming from wrong sources of information. In this respect he has
defined that he had brought the employees who have carried out the drilling works of the
projects and the other project based works in order to prevent this misleading.
Pursuant to this speech the attendants have individually took the floor and explained their
demands related with the project.
Sadlk Sen
Headman of Hacloglu ViI.
Signed
ibrahim Atay
Cons. Eng.
Cham. Reg: 69036
Dip.No: 998-412\0
Mehmet Can
Headman ofCcvizli ViI.
Signed and Sealed
Muzaffer Akm
Headman ofTevfikiye ViI.
Signed and Sealed
Mehmet Ozcan
Headman ofPazarcik ViI.
.rAined ~d Sealed
+
Cemil BASAR
Headman ofYenikonak ViI.
Signed and Sealed
ANFIL TRANSLATI N SERVrcts
~,~;:~t!~"
K... rnll Sok.k
Te't'ion
5 K'Z:llay Ank,lrd
f.k,
+ 9
III 4187537
10"'", ka
0 31
4187437
ft*.~_ 'I"'~YI
m •. (om
.
'4O~
"'
20'2Pl~
HUseyin <;elikkaya
Headman of <;amyayla ViI.
Signed and Sealed
Muhammet Sen
Headman of Baba.,:ay ViI.
Signed and Sealed
.'
The attendans have generally asked the reason why the materials flowing from the
slopes causing landslips are pouring to these locations and defined that these lansslips
have not been prevented by taking the necessary precautions and added that if
transportation had been done these landslips would not have occured and the owned
(with title deed) lands would not have been left underwater and they asked what
precuations can be taken. These demands have been claimed by:
Mehmet Can, Headman of the Cevizli Village
Murat Atay has defined that no route to the channel fields has been left during the
establishment of trapeze channel and demanded a new route.
Dogan Erdal has asked why the power plant has been constructed here and added that
couldn't it be constructed in a front location.
Mukaddes Aksoy, has wondered whether this project really had a <;ED (environmental
impact assessment report) and defined that 500.000 m3 material has been
unnecessarily poured into the environment and also wondered if the life line support is
provided for the rivers.
Alaattin Sansoy has claimed that the materials poured to the stream beds are
covering the beds and this problem must be solved as soon as possible.
ibrahim Atay
Cons. Eng.
Cham. Reg: 69036
Dip.No: 998-41210
Muzaffer Akm
Headman ofTevfikiye ViI.
Signed and Sealed
Sadlk Sen
Headman of HaclOglu ViI.
Signed
Mehmet Can
Headman ofCevizli ViI.
Signed and Sealed
Cemil BASAR
Headman ofYenikonak ViI.
Signed and Sealed
HUseyin <;:elikkaya
Headman of <;:amyayla ViI.
Signed and Sealed
Muhammet Sen
lIeadman of Baba-ray ViI.
Signed and Sealed
Mr. Ersin Taranoglu has answered all these questions as followed:
The mentioned
hydroelectric power plant will operate in winter months and a trapeze channel of 5.5 kms will
be constructed in order for uniform operation of the plant and the water needed for uniform
operation of the 3 tribunes will be stored in this channel and the soil left after digging will be
used for constructing a new service road to the trapeze channel and explained that
transporation is a cheaper process when compared to the expropriation. On the other hand he
told that the damages given would be covered as soon as possible and every precaustion
would be taken immediately.
Mr.
Ya~ar
Aydm, Mr. Vedat Ta~C;l and the headman of the Tevfikiye Villlage have underlined
that the village roads were deteriorated during the trasnsportation and this problem must be
solved immediately.
Upon these speeches, Mr. Ersin Taranoglu has answered the questions again and explained
that he would also answer all petitions submitted.
Lastly, Mr. Ersin Taranoglu has acknowledged all attendants of the meeting and announced
that the meeting is over.
Y a~ar demirel
Headman of Go I ViI.
Signed and sealed
Muzaffer AkIn
Headman ofTevfikiye ViI.
Signed and Sealed
Cemil BASAR
Headman ofYenikonak ViI.
Signed and Sealed
Sadlk Sen
Headman of HaclOglu ViI.
Signed and sealed
Mehmet Can
Headman ofCevizli ViI.
Signed and Sealed
Hliseyin <;elikkaya
Headman of<;amyayla ViI.
Signed and Sealed
Muhammet Sen
Headman of Baba"ay ViI.
Signed and Sealed
THE LIST OF THE PEOPLE ATTENDING THE THE INTRODUCTION AND PUBLIC A V AILABILITY MEETING
HELD BY iLK ELEKTRiK ENERJi ORETiM SAN. Tic. A.~. ( iLK POWER ENERGY GENERATION IND. TRA. INC.
CO.) IN AYANCIK PUBLIC TRAINING CENTER BETWEEN TilE HOURS 10:00 - 14:00 ON 14.10.2009.
NAME- SURNAME
PHONENR.
SIGNATURE
YASAR DEMiREL
05382813389
SIGNED
MUZAFFER AKIN
05332243949
SIGNED
RAMAZAN AT A Y
05542315129
SIGNED
FiKRi ERDAL
03686132560
SIGNED
NiHAT SARISOY
05554591434
SIGNED
MEHMETCAN
05327977496
SIGNED
METiN SARISOY
05444993466
SIGNED
MEHMET SARISOY
05054761945
SIGNED
YASARAYDIN
05324233260
SIGNED
SELAHA TTiN DEMiRKAN
05379836536
SIGNED
VEYSEL DEMiRKAN
03686216254
SIGNED
HASAN DEMiRKIRAN
03686216191
SIGNED
SEVKi KOROGLU
03686131645
SIGNED
OZCANUNLU
05446181218
SIGNED
DOGANERDAL
03686134201
SIGNED
Y. KEMAL T ASC;I
05336152285
SIGNED
CAFER TA YY AR
03686132860
SIGNED
03686132561
SIGNED
SARISOY
VEDA T TASC;I
NiGAR UNLU
SIGNED
NURDAN SARISOY
SIGNED
ERKAN AVCI
05066001040
SIGNED
MEHMETOZER
05053832440
SIGNED
SIGNED
MURAT AKYOL
HUSEYiN SARISOY
03686132348
SIGNED
TAHSiN SARISOY
03686135452
SIGNED
HAMDi C;ILGIN
03686132765
SIGNED
SABRi C;ILGIN
03686133737
SIGNED
ARA~FIL TRt~~~.~~n~' K~~~'~~~!
J
.......~"
""" ";~ ""'" '"""
rt'iefon
Faks.
wWYr.k.
~''''''Y
r~
(~1 ~J .107537
131
41874H
ere me.com
D"04' 0929'4
MURATATAY
03686133731
SIGNED
M. YILMAZ SARISOY
03686133336
SIGNED
A. METiN SARISOY
05369854135
SIGNED
MUKADDER AKSOY
05362508541
SIGNED
05367263734
SIGNED
AYHANERDAL
03686132299
SIGNED
MEHMETESiN
03686133644
SIGNED
05325721036
SIGNED
RIF AT SARISOY
03686134128
SIGNED
NiHAT TA~<::I
03686132607
SIGNED
MUSA <::ELEN
05427557500
SIGNED
CEMiL YILMAZ
05426412170
SIGNED
ERHAN YILDIRIM
03686132901
SIGNED
<::ETiN KAMP
6132502
SIGNED
SADIK YILMAZ
05432809008
SIGNED
HUSEYiN 6ZTURK
03686133694
SIGNED
CEMALETTiN UNLU
05426311228
SIGNED
MUSTAFA DEMiRTA~
05462035350
SIGNED
PERViN ACAR
03686132824
SIGNED
FATMANUR MiHENKTA~
03686132930
SIGNED
SEYHAN SABRi SARISOY
05334476128
SIGNED
MUSTAFA UNLU
05468420015
SIGNED
BA YRAM DiN<::ER
05382635327
SIGNED
BURHAN KESKiNSOY
05427705678
SIGNED
KEMAL
SADIK
TA~<::I
~EN
KARANFll TRANSLATION ERVlaS
~
("~1
M(lo}:'t/tivC'1
tt:.hJ
t;rlfl
f
MJ:rJ.iiI
Sokak
IZI!(l~j An-kard
Telefoll'
'312) 4167537
F.k,.
(
) 4187437
www.ltarnterme.com
~.. tllthy.
40 209291"
PROJECT INTRODUCTION PUBLISHING REPORT
The project introduction prepared for Ayancik HES (Hydroelectric Power Plant) power
capacity of which is 15,6 MW constructed by iLK ELEKTRiK ENERJi URETiM SAN. Tic.
A.S. ( iLK POWER ENERGY GENERA nON IND. TRA. INC. CO.) is published on the
billboard of the municipality of Ayanclk and the billboard settled in the construction site of
iLK ELEKTRiK ENERJi (iLK POWER ENERGY) to be kept until the project is ended; in
order to inform people living in the region.
This report hereby has been arranged in order to detect that the Project Introduction Report
has been published.
8ayram
Gok~e
Selahattin Ozcan
Project Manager
Sci.Aff. Manager
Signed
Signed
Alaatin TOKER
Adm. & Fin. Aff. Manager
iLK POWER ENERGY GENERATION
IND. TRA. INC. CO
Oguzlar Mah. 45 sok. No: 3/5 Balgat ANK
Tel: 0312 287 0459 fax: 0312 287 06 59
Ba~kent
Tax Dep.
Signed
KARANFIL TRANSlATI N SERVICES
M('~nJt\v'
c{f
yr, ••• ,.- \....
( d
~ \.!';itu t1:;~
,..0'"
fa"
WWW.
1';'f<lMj\
SoK.ak
};)J Ktld(!)-' Al1k.ua
(, ' l}) 4l~7537
(31 I 4187437
Teledon
um •. com
. . filter
40 ·32092914
fai
PROJECT INTRODUCTION PUBLISHING REPORT
The project introduction prepared for Ayancik HES (Hydroelectric Power Plant) power
capacity of which is 15,6 MW constructed by iLK ELEKTRiK ENERJi URETiM SAN. Tic.
A.S. ( iLK POWER ENERGY GENERATION IND. TRA. INC. CO.) is published on the
billboard of the municipality of Ayanclk, on the billboard of ....... Sofu Village ........ and the
billboard settled in the construction site of ILK ELEKTRiK ENERJi (iLK POWER
ENERGY) to be kept until the project is ended; in order to inform people living in the region.
This report hereby has been arranged in order to detect that the Project Introduction Report
has been published.
Ya~ar
AYDIN
Headman of Sofu ViI.
Signed and Sealed
Bayram Gokc;e
Project Manager
Signed
Alaatin TOKER
Adm. & Fin. Aff. Manager
iLK POWER ENERGY GENERA nON
IND. TRA. INC. CO
O~uzlar
Mah. 45. sok. No 3/5 Balgat ANK
Tel 0312 287 0459 fax: 0312 287 06 59
Ba~kent
Signed
Tax Dep. -
Tahsin Ar;lkgoz
Mehmet AC;lkgoz
Signed
Signed
PROJECT INTRODUCTION PUBLISHING REPORT
The project introduction prepared for Ayancik HES (Hydroelectric Power Plant) power
capacity of which is 15,6 MW constructed by iLK ELEKTRiK ENERJi URETiM SAN. Tic.
A.~. ( iLK POWER ENERGY GENERATION IND. TRA. INC. CO.) is published on the
billboard of the municipality of Ayanclk, on the billboard of ....... Mestan Village ........ and the
billboard settled in the construction site of iLK ELEKTRiK ENERJi (iLK POWER
ENERGY) to be kept until the project is ended; in order to inform people living in the region.
This report hereby has been arranged in order to detect that the Project Introduction Report
has been published.
iLK POWER ENERGY GENERATION
IND. TRA. INC. CO
Oguzlar Mah. 45. sok. No: 3/5 Balgat ANK
Tel: 0312 287 0459 fax: 0312 287 06 59
Ba~kent
Tax Dep. -
Signed
Member
Celal SONMEZ
Sadettin Aydm
Headman of Mestan ViI.
Signed
Signed and Sealed
Alaatin TOKER
Adm. & Fin. Aff. Manager
iLK POWER ENERGY GENERA nON
IND. TRA. INC. CO
Oguzlar Mah. 45. sok. No 3/5 Balgat ANK
Tel: 0312 287 0459 fax 03122870659
Ba~kent
Signed
Tax Dep -
PROJECT INTRODUCTION PUBLISHING REPORT
The project introduction prepared for Ayancik HES (Hydroelectric Power Plant) power
capacity of which is 15,6 MW constructed by iLK ELEKTRiK ENERJi URETiM SAN. Tic.
A.S. (iLK POWER ENERGY GENERATION IND. TRA. INC. CO.) is published on the
billboard of the municipality of Ayanclk, on the billboard of ....... Cevizli Village ........ and the
billboard settled in the construction site of iLK ELEKTRiK ENERJi (iLK POWER
ENERGY) to be kept until the project is ended; in order to inform people living in the region.
This report hereby has been arranged in order to detect that the Project Introduction Report
has been published.
Mehmet Can
Member
Headman ofCevizli ViI.
Erdal Y IIdmm
Mehmet Sedef
Signed and Sealed
Signed
Signed
Alaatin TOKER
Adm. & Fin. Aff. Manager
iLK POWER ENERGY GENERATION
IND. TRA. INC. CO
Oguzlar Mah. 45. sok. No: 3/5 Balgat ANK
Tel 03122870459 fax: 0312 287 06 59
Ba~kent
Tax Dep. -
SIgned
KARANFIL TRANSLA ON SiERVI{'ES
M~sru
U~,j1J
(ad. KM~nfil Sokak
t..()
Tehd n
F;,~
16/~;~ X.I!,!;:')'
-I.
An.an
~'O r.~1~) 4187531
)1)) <\;87437
fitl te-rcume.(om
o
40432092914
Member
PROJECT INTRODUCTION PUBLISHING REPORT
The project introduction prepared for Ayancik HES (Hydroelectric Power Plant) power
capacity of which is 15,6 MW constructed by iLK ELEKTRiK ENERJi URETiM SAN. Tic.
A.S. (iLK POWER ENERGY GENERATION IND. TRA. INC. CO.) is published on the
billboard of the municipality of Ayanclk, on the billboard of the construction building of the
company and the billboard settled in the construction site of iLK ELEKTRiK ENERJi (iLK
POWER ENERGY) to be kept until the project is ended; in order to inform people living in
the region.
This report hereby has been arranged in order to detect that the Project Introduction Report
has been published.
iLK POWER ENERGY GENERATION
IND. TRA. INC. CO
Oguzlar Mah. 45. sok. No: 3/5 Balgat ANK
Tel 0312 287 0459 fax: 0312 287 06 59
Ba~kent
Tax Oep. -
Signed
Bayram Gokye
Project Manager
Signed
ibrahim ATAY
Atilla YILDIZ
Signed
Signed
Alaatin TOKER
Adm. & Fin. Aff. Manager
iLK POWER ENERGY GENERA nON
IND. TRA. INC. CO
Oguzlar Mah. 45. sok. No: 3/5 Balgat ANK
Tel 0312 287 0459 fax: 0312 287 06 59
Ba~kent
Tax Oep. -
Signed
IARANFfL TRANSLAI
~
.~.
TRAN
N SERV'CES
Me,ruti. t 'd. !<".rantl! Sokak
f)j!u. t;.
IS5 K!zsl?y Ankara
Teh!I.)fl -t'-' '" 1 i 4' 81537
Faiu
... (; n~ .I <~j87437
\"JW\%
al
SLA"on ~.ni<.
Jltt!' (iJrn~ com
43J091914
PROJECT INTRODUCTION PUBLISHING REPORT
The project introduction prepared for Ayancik HES (Hydroelectric Power Plant) power
capacity of which is 15,6 MW constructed by iLK ELEKTRiK ENERJi URETiM SAN. Tic.
A.S. (iLK POWER ENERGY GENERATION IND. TRA. INC. CO.) is published on the
billboard of the municipality of Ayanclk, on the billboard of ....... Pazarcik Village ........ and
the billboard settled in the construction site of iLK ELEKTRiK ENERJi (iLK POWER
ENERGY) to be kept until the project is ended; in order to inform people living in the region.
This report hereby has been arranged in order to detect that the Project Introduction Report
has been published.
iLK POWER ENERGY GENERATION
IND. TRA. INC. CO
Oguzlar Mah. 45. sok. No: 3/5 !3algat ANK
Tel: 0312 287 0459 fax: 0312 287 06 59
Ba~kent Tax Dep. - BA YRAM
OOK<;:E
Signed
Bayram Gokge
Mehmet OZCAN
Project Manager
Headman ofPazarclk ViI.
Signed and Sealed
Signed
Member
Village Resident
Rlfat T A$KlRAN
AhmetORNEK
Signed
Signed
Alaatin TOKER
Adm. & Fin. Aff. Manager
iLK POWER ENERGY GENERATION
IND. TRA. INC. CO
Oguzlar Mah. 45. sok. No 3/5 Balgat ANK
Tel: 0312 287 0459 fax 03122870659
Ba~kent
Signed
Tax Dep. -
PROJECT INTRODUCTION PUBLISHING REPORT
The project introduction prepared for Ayancik HES (Hydroelectric Power Plant) power
capacity of which is 15,6 MW constructed by iLK ELEKTRiK ENERJi URETiM SAN. Tic.
A.S. ( iLK POWER ENERGY GENERATION IND. TRA. INC. CO.) is published on the
billboard of the municipality of Ayanclk, on the billboard of ....... Golkoy Village ........ and the
billboard settled in the construction site of iLK ELEKTRiK ENERJi (iLK POWER
ENERGY) to be kept until the project is ended; in order to inform people living in the region.
This report hereby has been arranged in order to detect that the Project Introduction Report
has been published.
iLK POWER ENERGY GENERATION
IND. TRA. INC. CO
Oguzlar Mah. 45. sok. No: 3/5 Balgat ANK
Tel: 0312 287 0459 fax: 0312 287 06 59
Ba~kent
Tax Dep. -
Signed
Ya~ar DEMiREL
Bayram G5kge
Headman ofGolkoy ViI.
Project Manager
Signed and Sealed
Signed
Member
Village Resident
Cemal YI LOIZ
Zihni DEMiREL
Signed
Signed
Alaatin TOKER
Adm. & Fin. Aff. Manager
iLK POWER ENERGY GENERATION
IND. TRA. INC. CO
Oguzlar Mah. 45. sok. No: 3/5 Balgat ANK
Tel: 0312 287 0459 fax 03122870659
Ba~kent Tax Dep. - BA YRAM OOK<;:E
Signed
KARANflL TRANSLATION 51: \fleES
j·.h?~r~H!yel ('~d 1<,]r·
fiI ~ol(ak
Y Ankota
reMon + 9l'
i 4161537
Fak,
• 90 ·P.? -1187437
wWW.k"';lnf"
me-.com
li~lu HdO 16/S:'
TItAN.LATOR
C;."'.ya
V
~o 3~
291~
PROJECT INTRODUCTION PUBLISHING REPORT
The project introduction prepared for Ayancik HES (Hydroelectric Power Plant) power
capacity of which is 15,6 MW constructed by iLK ELEKTRiK ENERJi ORETiM SAN. Tic.
A.~. (
iLK POWER ENERGY GENERA nON IND. TRA. INC. CO.) is published on the
billboard of the municipality of Ayanclk, on the billboard of ....... Akc;akese Village ........ and
the billboard settled in the construction site of iLK ELEKTRiK ENERJi (iLK POWER
ENERGY) to be kept until the project is ended; in order to inform people living in the region.
This report hereby has been arranged in order to detect that the Project Introduction Report
has been published.
iLK POWER ENERGY GENERATION
IND. TRA. INC. CO
Oguzlar Mah. 45. sok. No: 3/5 Balgat ANK
Tel 0312 287 0459 fax: 0312 287 06 59
Ba~kent
Tax Dep. -
Signed
Bayram Gokge
Burhan KESKiNSOY
Headman of Ak~akese Vi\.
Project Manager
Signed and Sealed
Signed
Village Resident
Village Resident
Salim KESKiNSOY
Haydar ERCAN
Signed
Signed
Alaatin TOKER
Adm. & Fin. Aff. Manager
iLK POWER ENERGY GENERATION
IND. TRA. INC. CO
Oguzlar Mah. 45. sok. No: 3/5 Balgat ANK
Tel 0312 287 0459 fax: 0312 287 06 59
Ba~kent Tax Dep. - BA YRAM GOK<;:E
Signed
PROJECT INTRODUCTION PUBLISHING REPORT
The project introduction prepared for Ayancik HES (Hydroelectric Power Plant) power
capacity of which is 15,6 MW constructed by iLK ELEKTRiK ENERJi URETiM SAN. TiC.
A.S. (iLK POWER ENERGY GENERATION IND. TRA. INC. CO.) is published on the
billboard of the municipality of Ayanclk, on the billboard of ....... <;amyayla Village ........ and
the billboard settled in the construction site of iLK ELEKTRiK ENERJi (iLK POWER
ENERGY) to be kept until the project is ended; in order to inform people living in the region.
This report hereby has been arranged in order to detect that the Project Introduction Report
has been published.
iLK POWER ENERGY GENERATION
IND. TRA. INC. CO
Oguzlar Mah. 45. sok. No: 3/5 Balgat ANK
Tel: 03122870459 fax 0312287 06 59
Ba~kent
Tax Oep. -
Signed
Hiiseyin C;ELiKKA YA
Bayram GoklYe
Project Manager
Headman of <;:amyayla ViI.
Signed
Signed and Sealed
Seraffettin <;:ELiKKA YA
Aziz <;:ELiKKA YA
Signed
Signed
$evket C;ETiN
Signed
Alaatin TOKER
Adm. & Fin. Aff. Manager
iLK POWER ENERGY GENERA nON
IND. TRA. INC. CO
Oguzlar Mah. 45. sok. No: 3/5 Balgat ANK
Tel 0312 287 0459 fax: 0312 287 06 59
Ba~kent Tax Oep. - BA YRAM GOKt;:E
Signed
KARANFll TRANSLATION ERVIC£S
~
M.\rlltly~\
'-,n '''.:>/:'\ Sok.k
lhlu Hall
I
ILllity AnMla
To\eton • 0 (311\ 4187S37
F~k'
4187437
WW'If.
Iltu( me.com
T .....II&.ATO"" ~.nk a V
~04 2097914
,n
PROJECT INTRODUCTION PUBLISHING REPORT
The project introduction prepared for Ayancik HES (Hydroelectric Power Plant) power
capacity of which is 15,6 MW constructed by iLK ELEKTRiK ENERJi URETiM SAN. Tic.
A.~. ( iLK POWER ENERGY GENERATION IND. TRA. INC. CO.) is published on the
billboard of the municipality of Ayanclk, on the billboard of ....... Mustafa Kemal
Pa~a
Village ........ and the billboard settled in the construction site of iLK ELEKTRiK ENERJi
(iLK POWER ENERGY) to be kept until the project is ended; in order to inform people
living in the region.
This report hereby has been arranged in order to detect that the Project Introduction Report
has been published.
iLK POWER ENERGY GENERATION
IND. TRA. INC. CO
Oguzlar Mah. 45. sok. No 3/5 Balgat ANK
Tel 0312 287 0459 fax: 0312 287 06 59
Ba~kent
Tax Dep. -
Signed
Bayram Gokrye
Burhan KESKiNSOY
Project Manager
Headman of Mustafa Kemal
Signed and Sealed
Signed
Member
Village Resident
Murat YUKSEL
Mehmet UNAL
Signed
Signed
Alaatin TOKER
Adm. & Fin. Aft: Manager
iLK POWER ENERGY GENERATION
IND. TRA. INC. CO
Oguzlar Mah. 45. sok. No: 3/5 Balgat ANK
Tel: 0312 287 0459 fax 0312287 0659
Ba~kent Tax Dep - BA YRAM GOK<;:E
Signed
KARANFIL TRANSLATION S RVlcts
+
M'$rl/t!yet Cod. K .r.fll Sokak
U~'u Han 16/
l.flay Anl,.ua
T~h;"fon
i:,l
I 12) 4187537
F~lks
.. \.
"I
~HL?4~n
"'w~>i..:11
_ 0 " { ...... y. V
,I
..-reu
4('4·J
t".'orn
~2914
Pa~a
ViI.
PROJECT INTRODUCTION PUBLISHING REPORT
The project introduction prepared for Ayancik HES (Hydroelectric Power Plant) power
capacity of which is 15,6 MW constructed by iLK ELEKTRiK ENERJi URETiM SAN. Tic.
A.S. ( iLK POWER ENERGY GENERATION IND. TRA. INC. CO.) is published on the
billboard of the municipality of Ayanclk, on the billboard of ....... Otmanh Village ........ and the
billboard settled in the construction site of iLK ELEKTRiK ENERJi (iLK POWER
ENERGY) to be kept until the project is ended; in order to inform people living in the region.
This report hereby has been arranged in order to detect that the Project Introduction Report
has been published.
iLK POWER ENERGY GENERATION
IND. TRA. INC. CO
Oguzlar Mah. 45. sok. No: 3/5 Balgat ANK
Tel: 0312 287 0459 fax: 0312 287 0659
Ba~kent
Tax Dep. -
Signed
Bayram Goklfe
Cemil BASAR
Project Manager
Headman ofOtmanii Vi\.
Signed and Sealed
Signed
Village Resident
Village Resident
Cemil YAMAN
YusufBA~AR
Signed
Signed
Alaatin TOKER
Adm. & Fin. Aff. Manager
iLK POWER ENERGY GENERATION
IND. TRA. INC. CO
Oguzlar Mah. 45. sok. No: 3/5 Balgat ANK
Tel 03 I 2 287 0459 fax: 03 I 2 287 06 59
Ba~kent
Signed
Tax Dep. - BA YRAM GOK<;:E
PROJECT INTRODUCTION PUBLISHING REPORT
The project introduction prepared for Ayancik HES (Hydroelectric Power Plant) power
capacity of which is 15,6 MW constructed by iLK ELEKTRiK ENERJi URETiM SAN. Tic.
A.S. (iLK POWER ENERGY GENERATION IND. TRA. INC. CO.) is published on the
billboard of the municipality of Ayanclk, on the billboard of ....... HaclOgiu Village ........ and
the billboard settled in the construction site of iLK ELEKTRiK ENERJi (iLK POWER
ENERGY) to be kept until the project is ended; in order to inform people living in the region.
This report hereby has been arranged in order to detect that the Project Introduction Report
has been published.
iLK POWER ENERGY GENERATION
IND. TRA. INC. CO
Oguzlar Mah. 45. sok. No: 3/5 Balgat ANK
Tel: 0312 287 0459 fax: 0312 287 0659
Ba~kent
Tax Oep. -
Signed
Bayram
Gok~e
Sadlk Sen
Project Manager
Headman of HaclOglu ViI.
Signed
Signed and Sealed
Hakkl YAMAN
Signed
Yilmaz OZKAN
Signed
Alaatin TOKER
Adm. & Fin. Aff. Manager
iLK POWER ENERGY GENERATION
IND. TRA. INC. CO
Oguzlar Mah. 45. sok. No: 3/5 Balgat ANK
Tel: 03122870459 fax: 0312 287 06 59
Ba~kent
Signed
Tax Oep - BA YRAM GOK<;:E
.
--•
...
•
PROJECT INTRODUCTION PUBLISHING REPORT
The project introduction prepared for Ayancik HES (Hydroelectric Power Plant) power
capacity of which is 15,6 MW constructed by iLK ELEKTRiK ENERJi URETiM SAN. Tic.
A.S. (iLK POWER ENERGY GENERATION IND. TRA. INC. CO.) is published on the
billboard of the municipality of Ayanclk, on the billboard of ....... Tevfikiye Village ........ and
the billboard settled in the construction site of iLK ELEKTRiK ENERJi (iLK POWER
ENERGY) to be kept until the project is ended; in order to inform people living in the region.
This report hereby has been arranged in order to detect that the Project Introduction Report
has been published.
iLK POWER ENERGY GENERATION
IND. TRA. INC. CO
Oguzlar Mah. 45. sok. No 3/5 Balgat ANK
Tel: 0312 287 0459 fax: 0312 287 06 59
Ba~kent
Tax Oep. -
Signed
Bayram G5kr;:e
Project Manager
Signed
Muzaffer AKIN
Headman ofTevfikiye ViI.
Signed and Sealed
Village Resident
Member
Selahattin DEMiRKIRAN
Hasan DEMiRKIRAN
Signed
Signed
Alaatin TOKER
Adm. & Fin. Aff. Manager
iLK POWER ENERGY GENERATION
IND. TRA. INC. CO
Oguzlar Mah. 45. sok. No: 3/5 Balgat ANK
Tel: 0312 287 0459 fax: 0312 287 06 59
Ba~kent Tax Oep. - BA YRAM aOKeE
Signed
·
,..
PROJECT INTRODUCTION PUBLISHING REPORT
The project introduction prepared for Ayancik HES (Hydroelectric Power Plant) power
capacity of which is 15,6 MW constructed by iLK ELEKTRiK ENERJi URETiM SAN. Tic.
A.S. (iLK POWER ENERGY GENERATION IND. TRA. INC. CO.) is published on the
billboard of the municipality of Ayanclk, on the billboard of ....... Baba9ay Village ........ and
the billboard settled in the construction site of iLK ELEKTRiK ENERJi (iLK POWER
ENERGY) to be kept until the project is ended; in order to inform people living in the region.
This report hereby has been arranged in order to detect that the Project Introduction Report
has been published.
iLK POWER ENERGY GENERATION
IND. TRA. INC. CO
Oguzlar Mah. 45. sok. No: 3/5 Balgat ANK
Tel: 0312 287 0459 fax 03122870659
Ba~kent
Tax Dep. -
Signed
Bayram Gokr;e
Muhammet
Project Manager
Headman of Baba~ayVil.
Signed and Sealed
Signed
Village Resident
Village Resident
Muhammet AKIN
Retik Qztlirk
Signed
Signed
Alaatin TOKER
Adm. & Fin. Aff. Manager
iLK POWER ENERGY GENERA nON
IND. TRA. INC. CO
Oguzlar Mah. 45. sok. No: 3/5 Balgat ANK
Tel: 0312 287 0459 fax 03122870659
Ba~kent Tax Dep. - BA YRAM GOK<;E
Signed
cf>
....... N .........TOR
~EN
Mel'"liyet C,
Usl .. Han 16 i
111l..),
AnkM3
Telpfon
Fak,
l'
. I
I U7531
874,7
t· (
~
9
"IIwt,\,fl.ar.1
fl'
\..1rll... )," V )
(Mfil So ....
"
-'r, '.I! ;>.(On\

Benzer belgeler