Flood Management Planning in the context of EU Flood Directive in

Transkript

Flood Management Planning in the context of EU Flood Directive in
MINISTRY OF FORESTRY AND WATER AFFAIRS
General Directorate of Water Management
Flood Management Planning in the context of EU Flood
Directive in Turkey
Serdar ÖZCAN
Deputy Expert
Department of Flood and Drought Management
General Directorate of Water Management
09 October 2015 - İzmir
Content
Introduction
Completed Projects
Ongoing Projects
Other works
Objectives
Ankara - Eskişehir Road (2010)
Flood;
GENERAL INFORMANTION
•
•
•
In our country among natural disasters, floods are second only to earthquakes
in terms of economic losses.
In our country over the last 60 years (1955-2014) 2563 floods happened and
1496 people lost their lives.
According to existing data, economic loss caused by floods is approximately
100 million $ each year.
CAPACITY BUILDING TO IMPLEMENT FLOOD
DIRECTIVE
•
•
•
Project Start Date: 01.08.2012
Project End Date: 31.12.2014
Project Budget: 1.800.000 €
Institutions worked on project
Project Components
Basins that are being worked on
Legal, technical and institutional capacity
was built.
1
2
3
Pilot implementation of the principles of
the directive for Western Black Sea
Basin
National implementation plan has been
prepared
PROJECT OUTPUTS
Flood Risk
Management
Plan
Preliminary
Flood Risk
Assessment
Areas under
flood risk were
identified.
Flood areas for
different return
periods were
found and
shown on map.
August 2012
Flood risk was
classified and
shown on flood
hazard maps.
Flood Risk
Management Plan
includes flood
hazard maps and
flood risk maps.
Objectives and
measures needed
in order to
decrease flood risk
were defined.
National
Implementation
Plan
By using data
gathered from
Western Blacksea
Basin and three
quick scan basins,
National
Implementation
Plan was prepared
in order to
implement Flood
Directive in all
basins of our
country.
Guidebook for
Preparation of
Flood
Management
Plan
A guidebook
that describes
preparation
steps of Flood
Management
Plan was
prepared.
December 2014
7
PROJECT WORKS
PREPARATION OF FLOOD MANAGEMENT PLANS
YEŞİLIRMAK BASIN
•
Project
started
at
07.10.2013 and will be
completed at December
2015.
ANTALYA BASIN
•
27.01.2014
tarihinde
işe
başlanmış olup 2016 yılı
Haziran
ayında
tamamlanacaktır.
Project
started at 27.01.2014 and will
be completed at June 2016.
PROJECT WORKS
FLOOD
MANAGEMENT
PLAN
PRELIMINARY
FLOOD RISK
ASSESSMENT
Probable flood areas
were assessed.
Areas that flooding
occurs for different
return periods were
shown on map.
Flood
risk
was
classified and shown
on flood hazard
maps.
Flood Management Plan
that
defines
the
objectives and measures
before, during and after
the flood was prepared.
11
PRELIMINARY FLOOD RISK ASSESSMENT
Areas that were found as risky in Yeşilırmak Basin
As the result of Preliminary Flood Risk Assessment carried out over 537
settlements, by using historical flood data, flood control structure data
and modelling studies, a total of 13 settlements has been determined as
risky.
FLOOD HAZARD MAPS
Barajlar
_Hecras
İlçeler
PREPARATION OF FLOOD HAZARD MAPS
PREPARATION OF FLOOD RISK MAPS
Population Affected From Flood (Q500)
PREPARATION OF FLOOD RISK MAPS
Economic Damage (Q500)
PREPARATION OF FLOOD RISK MAPS
Risk Maps (Q500)
Risk maps were created by using
data of population affected by
flood and economic damage.
FLOOD MANAGEMENT PLANS
With Flood Management Plan objectives and
measures before the flood, during the flood and
after the flood are determined. The content of the
plan is as follows:
Executive Summary
Preliminary Flood Risk Assessment
Flood Hazard Maps and Flood Risk Maps
Objectives and Measures
• Objectives of Flood Risk Management
• Determined measures
Inclusion of interested parties and
informing the public
TABLE OF MEASURES
(EU PROJECT)
Name of the
under objective
Name of the
measure
Type of
measure
1
Ensure the
adapted
protection against
flood in sensitive
areas
Kirazlıköprü
dam
Structural
2
Yüzey akışının
Yüzey akışını
havza bazında
azaltmak için
yönetilmesi- uygun
iyi tarım
Non-structural
tarımsal
uygulamalarını
uygulamalar ve
n geliştirilmesi
orman yönetimi
3
4
5
Bazı alanların
Doğal işlevlerden
taşkın ovası ve
ve yeşil
ötelemesi
altyapılardan
amaçlı
faydalanılması
kullanımı
Structural
Location
Geographic
coverage of
expected
effect of the
measures
Gökırmak
Gökırmak river nehri/bartınalt havza
Agricultural
Areas
(Selected)
Selected Areas
Orman
yönetimi ve
Doğal işlevlerden yukarı havza
All of the
ve yeşil
ıslahı.Forest
Structural
forest land in
altyapılardan
Management
the basin
faydalanılması
and upper
basin
management
İmar
Taşkına meyilli
planlarının
alanlarda arazi taşkın tehlike
Settlements
kullanımı ve
ve risk
Non-structural
under risk
yapılaşmanın
haritalarına
düzenlenmesi
uyumlu hale
getirilmesi
Other National
Prioritisation
Act under which
Time of
Cost and
Authorities
for
Status of the
the measure has implementation
benefits of the
responsible implementatio measure
been
Before, During,
measure
n
implemented
After event
(where relevant)
Maliyet=
46331000 tl law on the
yıkılma riski DSİ
Very High
Ongoing
establishment of
Before flood
bakım maliyeti
DSI no: 6200
de önemli
olabilir
Downstream Gıda, Tarım ve
of agricultural Hayvancılık
areas
Bakanlığı
Downstream
of selected
areas
Valilik
All basin
OGM
Settlements
under risk
ÇŞB
Moderate
Moderate
Moderate
Critic
Not started
+++
(Tarım bakanlığı
ilgili kanun)
Before flood
Not started
++++
None
During flood
Ongoing
++++
Legislation
related to OGM
Before flood
Ongoing
+++++
Law no:
648,2872,3194
Before flood
WEB PAGE
taskinyonetimi.ormansu.gov.tr
WEB APPLICATION
LEGISLATION AND POLICY DEVELOPMENT
OBJECTIVES
OBJECTIVES
SHORT TERM
OBJECTIVES (20152016)
MIDTERM
OBJECTIVES (20172019)
LONG TERM
OBJECTIVES (20202023)
FLOOD
MANAGEMENT
PLAN
FLOOD
MANAGEMENT
PLAN
FLOOD
MANAGEMENT
PLAN
(2 basins)
(15 basins)
(8 basins)
MINISTRY OF FORESTRY AND WATER AFFAIRS
General Directorate of Water Management
Thank you for your attention
[email protected]