The relationship between RZD and Ansaldo STS

Transkript

The relationship between RZD and Ansaldo STS
The relationship between RZD and Ansaldo STS
+
• Following the agreements signed by Finmeccanica and RZD in 2007, Ansaldo
p
for the development
p
of
STS and NIIAS ((subsidiaryy of RZD)) started to cooperate
an innovative signalling and safety ensuring system, called ITARUS-ATC
• In May 2007 the Parties signed a Concept for the development of such new
system
• In August and Nov. 2008 the Parties agreed to sign an ITARUS-ATC contract
• In April 2009 Ansaldo STS and NIIAS signed a contract for the development
and testing of the new ITARUS-ATC system on a Russian trial site, whose
value for Ansaldo STS is 7.4 M€
• In 2008 ZST (subsidiary of RZD) launched an international tender for the
realization of the signalling, automation, security, ticketing, telecommunication
and power supply systems on the Sirth-Benghazi railway line in Libya
• On August 2010 the Consortium between Ansaldo STS and Selex
Communications (another Finmeccanica company) signed with ZST a contract
for the Sirth-Benghazi line worth 246.8 M€. The portion of the Contract for
STS
S is 201.8
0 8 M€.
€
Ansaldo S
+
London 2nd December 2010
31
Russian Railway infrastructure development (i)
+
Strategy for Developing Rail Transport in the Russian Federation up to 2030
+
London 2nd December 2010
32
Russian Railway infrastructure development (ii)
+
Strategy for Developing Rail Transport in the Russian Federation up to 2030
Ratified by the Government in June 2008, the Strategy for Developing Rail Transport in the
Russian Federation up to 2030 envisages a significant expansion of Russia's rail network in two
stages:
• The first involves a period of modernization (2008-15) to ensure the necessary capacity on key routes,
a fundamental renewal and upgrading of existing infrastructure and the beginning of planning and
surveying work for expansion, as well as a start on the construction of some high-priority lines. This
construction program will cost 4.2 trillion rubles, with 58.6% coming from the Russian Federation, 11.9%
from administrative areas of the Russian Federation, 10.7% from Russian Railways and 18.8% from
private
i
iinvestors.
• Among the Company’s top priorities are the reconstruction of existing main lines and their technical
enhancement, along with the construction of new lines to remove infrastructural limitations to Russia's
economic
i growth.
th Th
The costt off upgrading
di existing
i ti railways
il
will
ill exceed
d3
3.2
2 ttrillion
illi rubles.
bl
• The development of high-speed lines in Russia will make rail travel more attractive and reduce journey
times, attracting passengers from air and road. This will make rail passenger services more profitable and
help to reduce the environmental impact resulting from the growing demand for travel.
travel
• The second stage from 2016 to 2030 involves large-scale expansion. This will create the infrastructure
needed to develop new areas of economic growth across Russia's vast territory, achieving a world-class
level of technology and improving the competitiveness of the country
country’s
s rail system on the global
market
The minimum version envisages
g the construction of 16017 km of new route by
y 2030,, while the
maximum scenario calls for 20730 km
+
London 2nd December 2010
33
ASTS is a value creating partner -a case history-
+
• RZD was looking for an international partner willing to design a new signalling
y
in compliance
p
with some specific
p
needs of Russian Railways
y
system
• Ansaldo STS established a joint working group with NIIAS (subsidiary of RZD)
• Ansaldo STS and NIIAS conceived an innovative version of the ERTMS Level
2 system, called ITARUS-ATC, based on satellite location and without the
use off any distributed
di t ib t d d
device
i (E
(Eurobalises),
b li
) iin order
d tto iimprove th
the efficiency
ffi i
and maintainability of the system, sensitive factors on a large territory such as
Russia
• Now the system is going to be tested on a trial site close to Sochi
• Following the results on the performances of the system, it is planned to apply
it on an extensive portion of Russian Railways
• The intention of the Parties - RZD, NIIAS and Ansaldo STS – is to propose the
same system also to other countries (Belarus, etc…)
+
London 2nd December 2010
34
The new MoU signed on
26th
November 2010
+
• On 26th November 2010 RZD, NIIAS, RZD High Sped Rail, Finmeccanica and
sa do S
STS
S ssigned
g ed a new
e Memorandum
e o a du o
of Understanding
U de sta d g ((MoU)
oU) to
o de
define
e
Ansaldo
their cooperation till 2020
• Ansaldo STS will establish a Joint Venture together with NIIAS and RZD HSR
• The JV will focus its business on safety and security systems
• The prospected business for the JV regards the equipment, with safety and
security systems,
systems of 100 stations
stations, 50 spans (open lines) and 100
locomotives till 2010
• Ansaldo STS will localize a part of its production in Russia
• By means of this MoU,
MoU Ansaldo STS will access new segments of the railway
market in Russia, such as security systems, computer-based interlockings and
traffic management centers
centers.
+
London 2nd December 2010
35
Ansaldo STS
Investor Meeting
g 2010
Markets, focus on Turkey
y
Turkey State Railways (TCDD ),
Head of Department
Mehmet Turşak
TARGET 2023
RESTRUCTURING
MoT
NEW TURKISH RAILWAY SECTOR
NEW TURKISH RAILWAY SECTOR
THE MINISTRY OF TRANSPORT
THE DIRECTORATE THE RAILWAY ACCIDENT THE DIRECTORATE TURKISH GENERAL OF INVESTIGATING GENERAL OF RAILWAY TRANSPORT
RAILWAY TRANSPORT
BOARD TURKISH STATE RAILWAYS
J.S.C.
DUGEM
DEKAK
TCDD
DETAŞ
London 2nd December 2010
37
PRESENT SITUATION
Passenger and Freight Transport
g
g
p
MoT
FREIGHT TRANSPORT (2009)
PASSENGER TRANSPORT (2009)
Volume : 22 million tons
((10,3
, billion tons-km))
Volume
: 80 million pax
((5,4
, billion pax-km)
p
)
Share
Share
: 2%
: 5%
Line Length (km)
Conventional Lines
Conventional Lines
11.008
High Speed (HS) Lines
397
Total Lines
11.405
• Since 13th of March, 2009, high speed (HS) trains are in operation on Ankara – Eskişehir
Line.
• Since
Si
1st off July,
J l 2010,
2010 HS trains
t i have
h
b
been
operating
ti
every hour
h
with
ith 22 trips
t i a day,
d
carrying daily 6000 pax at weekdays & 7000 pax at weekends.
• A total of 2.2 million passengers have been carried between March 2009 and September
2010
London 2nd December 2010
38
RAILWAY CORRIDORS IN OUR REGION
MoT
There is a 75 billion USD transpot potential between Europe and Asia.
•Istanbul-Kars-Tbilisi-Baku,
•Kurtalan-Nusaybin-Iraq,
K t l N
bi I
•Kars-Nahcevan-Iran,
•Kavqaz-Samsun-Basra,
Far East Asia
•Istanbul Aleppo Makkah and
•Istanbul-Aleppo-Makkah
•Istanbul-Aleppo-North Africa
transport corridors are being developed.
The Central and North Asia
Samsun-Kavqaz
Kars-Tbilisi-Baku
Marmaray
y
Lake Van Crossing
Tekirdağ-Muratlı
Kurtalan- Nusaybin
Kurtalan
Nusaybin- Iraq
Kars-Nahcevan-Iran
South East Asia
North Africa
The Middle East
39
3
3.107
BUDGET ALLOCATED TO RAILWAYS HAS RISEN
3.500
TLMilyon TL
TL Million
Million
Mil
TL
3.000
235
2003
103
2001
202
75
2000
500
2002
76
67
1.000
820
1.500
1 .483
1.122
2.000
1.531
1
1.662
2.500
2010
2009
2008
2007
2006
2005
2004
0
Years
Yıllar
While the allocation to railways were 75 Million TL in 2000, 3,11 Billion TL has been allocated in 2010 .
y allocation to railways
y has risen 41 times in ten y
years.
Yearly
40
IMPORTANT PROJECTS
HEDEF 2023
HEDEF 2023
Construction of Ankara-İstanbul, Ankara-Konya, Ankara-Sivas and
Ankara-Bursa High Speed Lines, Ankara set as the center, started
Tiflis
K A R A D E N İ Z
Kapıkule
Kırklareli
Pityon
Samsun
Karabük
İzmit
Adapazarı
Çankırı
Kars
Amasya
BİLECİK
Bandırma
BURSA
ESKİŞEHİR
Erzurum
ANKARA
Yerköy
Balıkesir
Alayunt
Er incan
Erzincan
Irmak
SİVAS
Yozgat
Polatlı
Divriği
E G E D E N İ Z İİ
Aliağa
Manisa
AFYON
Uşak
İZMİR
Muş
Tatvan
MALATYA
Kapıköy
Van
Batman
KONYA
Aydın
High Speed Lines
Length
Ankara - İstanbul
533 km
Ankara - Konya
212 km
Ankara - Sivas
460 km
Bursa - Bilecik
106 km
ADANA
Karaman
Kurtalan
Diyarbakır
Kahramanmaraş
Denizli
ANTALYA
TOTAL
Van Gölü Elazığ
KAYSERİ
Narlı
Gaziantep
Mardin
Nusaybin
Mersin
İskenderun
Musul
Halep
Kerkük
HS LINES UNDER THE COSTRUCTION
HS LINES UNDER THE OPERATION
1.311 km
Bağdad
41
41 /53
41
IMPORTANT PROJECTS
ANKARA‐ISTANBUL HIGH SPEED TRAIN PROJECT
MoT
İSTANBUL
533 km
ANKARA
ESKİŞEHİR
ƒ Ankara-Eskisehir Section was completed and high
speed train operation started on 13th March, 2009.
ƒ Construction works on Eskisehir-Istanbul Section
are going on and 50 % physical progress will be
realised by the end of 2010.
PROJECT FEATURES
Length
:
533 km
O
Operating
ti
S
Speed
d :
250 kph
k h
Journey Times
Ankara-Eskisehir
1 h 30 min
Ankara-Istanbul
3h
:
42
IMPORTANT PROJECTS
ANKARA‐KONYA HIGH SPEED TRAIN PROJECT
MoT
ANKARA
POLATLI
212 Km
KONYA
PROJECT FEATURES
Length
2010 : Project will be completed.
2010 : Project will be completed. :
212 km
Operating Speed :
250 kph
y Times
Journey
Ankara - Konya
y
1 h 15 min.
Istanbul - Konya
3 h 30 min.
Project Cost
:
:
1 billion 128 million TL (including 6 sets)
43
IMPORTANT PROJECTS
ANKARA‐SIVAS HIGH SPEED TRAIN PROJECT
MoT
ANKARA
YOZGAT
KIRIKKALE
SİVAS
466 Km
PROJECT FEATURES
2009 : Works started on 13th March, 2009.
2010 : Construction works are going on Y k Si
Yerkoy‐Sivas section (292 km).
ti (292 k )
Length
g
:
466 km
Operating Speed :
250 kph
Journey Time
:
Ankara - Sivas
Project Cost
:
2 billion 91 million TL
44
approx. 2,5 h
IMPORTANT PROJECTS
ANKARA‐BURSA HIGH SPEED TRAIN PROJECT
BURSA
BİLECİK
455 Km
ESKİŞEHİR
ANKARA
PROJECT FEATURES
Length
2010 : Tender process is going on.
:
124 km (Bursa-Bilecik)
Operating Speed :
250 km/saat
Journey Time
:
Ankara - Bursa
Project Cost
:
851 million TL
45
approx. 2 h
MoT
IMPORTANT
PROJECTS
SUNUM İÇERİĞİ
HIGH SPEED TRAIN STATIONS
MoT
EDİRNE
TRABZON
İSTANBUL
KARS
ERZURUM
ANKARA
BURSA
YOZGAT
ESKİŞEHİR
SİVAS
ERZİNCAN
POLATLI
AFYON
İZMİR
KAYSERİ
KONYA
ADANA
GAZİANTEP
MERSİN
COMPLETED HIGH SPEED LINES
HIGH SPEED LINES UNDER CONSTRUCTION
PLANNED HIGH SPEED LINES
HIGH SPEED TRAIN STATIONS
46
EXISTING LINE
New HIGH SPEED STATION
High Standard Commuter Train Operations will start in the Capital , ANKARA.
g
p
p ,
47
Kayaş caddesi üstgeçidi
19 Mayıs Bulvarı kkarayolu üstgeçidi
Abdülhaak Hamit Altgeçidi
Arif Yıldız Caddesi Altgeçidi Talatpaşa Bulvarı K
Karayolu Üstgeçidi
Ankara sokak vasıta Üstgeçidi
IMPORTANT PROJECTS
BAŞKENTRAY ( THE CAPITAL COMMUTER RAIL)
KAYAS
Köstence
Topkaya
Üreğil
Bağderesi
Mamak
Saimekadın
Demirlibahçe
Cebeci
: 25
Kurtuluş
ƒ Number of Stations
Dumlupınarr caddesi Altgeçidi
: 36 km
: 36 km
Yenişehir
Total Length
ƒ Total Length
Adnan Saygun caddesi Altgeçidi
: 12 km
Altınsoy Altgeçiti
Atatürrk Bulvarı Altgeçiti ƒ Ankara‐Kayas
Bellediye tarafından yapılan Karayolu Altgeçidi
: 24 km
Hipodrom
Gazi Mahallesi
Gazi Marşandiz
BEHİÇBEY
ƒ Ankara‐Sincan
Hipodrom Mevcut K
Karayolu Üstgeçidi
AOÇ kkarayolu üstgeçidi
Anadolu Bulvarı karayolu üstgeçidi
Yıldırım
Hava Durağı
ETİMESGUT
Güneşevler
Emirler
Elvankent
Lale BEHİÇBEY FACILITIES
Yaya Altgeçidi
Ray Kaaynak Fb. Altgeçidi
Şaşmaz kkarayolu Üstgeçidi
Hava Kuvvetleri kkarayolu Altgeçidi
Mevcut Tu
urgut Özal Köprüsü
Mevcut Ç
Çevre Yolu köprüsü
Lale Karayolu Altgeçidi
SİNCAN
YENİKENT LINE
Lale K
Karayolu Altgeçidi
Sincan Karayolu Altgeçidi
ANKARA‐İSTANBUL HIZLI TREN PROJESİ
MoT
1. BAŞKENTRAY (Kayas‐Ankara‐Sincan)
ƒ Passengers without the Project
: 15 million per annum
ƒ Passengers with the Project
: 60 million per annumm
ƒ Project Cost
: 495 million TL.
Project works are going on.
The Present ANKARA STATION
High Speed Lines
Commuter Rail Lines
Conventional Lines
Platforms
Road Underpasses
Road Overpasses
TARGET 2023
HEDEF 2023
To renew the existing lines in order to increase the share
of rail sector
Tiflis
Kırklareli
Batum
SİRKECİ
Uzunköprü
H.PAŞA
Arifiye
Samsun
Karabük
Ü
Ülkü
İ
İzmit
Adapazarı
Çarşamba
Çankırı
ANKARA
ESKİŞEHİR
BALIKESİR
Tunçbilek
Dumlupınar
Uşak
Manisa
Horasan
Irmak
Erzincan
Kalın
Polatlı
Hanlı
Bostankaya
Divriği
Çetinkaya
AFYON
Hekimhan
Boğaz köprü
Van Gölü Elazığ
Muş
KAYSERİ
Menemen
Ödemişş
Goncalı
Aydın Nazilli
Tatvan
MALATYA
Çivril
Tire
Söke
SİVAS
Yerköy
Alayunt
Soma
Çatal
ERZURUM
Turhal
Bandırma
İZMİR
Kars
Amasya
Konya
ADANA
Karaman
Yenice
Mersin
Kurtalan
Diyarbakır
Kahramanmaraş
Ulukışla
Denizli
Narlı
Gaziantep
Karkamış
Van
Batman
Yolçatı
Eğirdir
Kapıköy
Mardin
Nusaybin
Şenyurt
Musul
Kerkük
Halep
Lines being renewed
Renewed Lines : 4.599 km % 53
Lines to be renewed : 4.098 km % 47
Renewed Lines
Lines to be renewed
48
TARGET 2023
HEDEF 2023
HEDEF 2023
To install signalling systems on the existing 7.893 km
long non-signalled railway lines
100 % Line Capoacity İncrease (On a Single Track)Tiflis
Kapıkule
Kırklareli
Pityon
Samsun
Karabük
Ülkü
İzmit
Arifiye
Adapazarı
Çarşamba
Çankırı
Turhal
Bandırma
andırma
Tunçbilek
Balıkesir
Aliağa
Manisa
Menemen
Torbalı
Ortaklar
Çatal
ANKARA
Eskişehir
Dumlupınar
Uşak
Irmak
Yerköy
Kalın
Hanlı
Tire
Goncalı
Bostankaya
Divriği
Çetinkaya
Elazığ
Hekimhan
Boğazköprü
Çivril
Aydın Nazilli
Söke
Denizli
Horasan
SİVAS
AFYON
Kayseri
Ödemiş
E
Erzurum
Erzincan
Polatlı
Alayunt
Soma
İZMİR
Kars
Amasya
Van Gölü Muş
Tatvan
MALATYA
Batman
Yolçatı
Eğirdir
Konya
Ulukışla
Karaman
Yenice
Mersin
ADANA
Kurtalan
Diyarbakır
Kahramanmaraş
Narlı
Gaziantep
Karkamış
Kapıköy
Van
Mardin
Nusaybin
Şenyurt
Musul
Kerkük
İskenderun
Halep
Signaled Lines : 3.098 km
Non‐signaled Lİnes : İ
7.893 km % 28
% 72
Bağdad
49
49 /53
TARGET 2023
MoT
To have a 25.539 km long railway network
by constructing new 14.531km
14 531km long rail lines until 2023
BLACK SEA
BULGARİSTAN
Kapıkule
Bartın
Kırklareli
İSTANBUL
YUNANİSTAN
Batum
Zonguldak
Ereğli
Karasu
Çıldır
İzmit
Trabzon H.Paşa
Rota
Çarşamba
Havza
Çankırı
Adapazarı
Arifiye
Kars
Amasya
ERMENİSTAN
Gümüşhane
Bandırma
Bursa
Turhal
Bilecik
ANKARA
Eskişehir
Balıkesir
THE AGEAN
N SEA
GÜRCİSTAN
Irmak
Yerköy
Çandarlı
Erzurum
Hanlı
NAHÇİVAN
Aralık
SİVAS
Yozgat
Polatlı
Alayunt
Horasan
Erzincan
Yıldızeli
Sincan
Bostan kaya
Divriği
Çetinkaya
Ç
i k
AFYON
Manisa
İZMİR
Kayseri
Uşak
Menemen
MALATYA
Ödemiş
Torbalı
Ortaklar
Eğirdir
Tire
Aydın
Söke
Van Gölü ELAZIĞ
Palu
Niğde
İRAN
Diyarbakır
K.maraş
Ulukışla
Cizre
Mardin
Narlı
Güllük
Karaman
ADANA
Antalya
Mersin
Nusaybin
Gaziantep
Karkamış
Yenice
İskenderun
Musul
Çobanbe
Çobanbey
IRAK
SURİYE
THE MEDITERRANEAN
Existing Conventional Lines
Hi h S
High Speed Lines d Li
Conventional Lines
TOTAL
Kapıköy
Van
Kurtalan
Denizli
Alanya Tatvan
Yolçatı
Konya
Manavgat
Muş
Bingöl
Kerkük
Halep
: 11.008 km
: 10.546 km
10 546 k
: 3.985 km
: 25.539 km
: EXISTING CONVENTIONAL LINES
: NEW CONVENTIONAL LINEES
: HIGH
:
SPEED LINES
50
PORTS
50
THANK YOU FOR YOUR ATTENTION
51
Q & A Session
th 2008
London,
October 162010
London
2nd December
Ansaldo STS
Investor Meeting
g 2010
Excellence in Execution
Ansaldo STS, Chief Executive Officer
Sergio De Luca
Extremely thoughtful about long-term shareholder value:
our challenge is not growing, but protect profitability
•Market will still continue to grow healthily at 4.3% CAGR, but with higher volatility
– Growth to continue through
g this downturn: strong
gp
pipeline
p
of upcoming
p
g orders due to European
p
standard
adoption worldwide
– Even if China, Russia, India are committed to building trains domestically, they are likely to use outside
suppliers for signalling/ transportation systems
– Volatility in new orders acquisition likely to be higher due to evolving geographical scope, increased projects
amounts, longer acquisition process, possible involvement in infrastructure operations
•Despite competitive landscape becoming increasingly fragmented and complex...
– All players moving from core/protected national markets into emerging markets to fiercely capture growth
opportunities
– Increased project size and progressive enlargement of scope of work (to include, financing, service,
operations & maintenance, training, operations) increasing operational risk
•... growth is not our challenge: unique ASTS business model allows for 8% CAGR
superior growth and a sustainable book to bill greater than 1.3
– Our business model is client centric and allows us to establish long lasting profitable relationships with our
clients globally
ASTS next challenge: enforce execution
excellence to protect profitability by enhancing
the efficiency of current and future operations
London 2nd December 2010
Master 27 11 -v27+TS.ppt
54
Efficiency enhancement requires excellence in execution
achievable leveraging new organization driven by business
Clear value proposition for Centres of Excellence, Shared Services, Planning groups
Superior value proposition to serve clients globally
Flexible Delivery
Streamlined
Support Functions
Maximize site activities,
achieve global scale, scope
g advantage
g
and knowledge
Geographically flexible and adaptive
structures linked to project
execution steered centrally
y with tight
g
risk management
Focus on value added activities
and centralize support activities
to improve
p
service, quality
q
y and
cost
Impact bottom-line by
standardizing platforms
and
d optimizing
ti i i
product
d t
families
Impact bottom-line by flexibly
planning, managing and agilely
orchestrating
h t ti
activities
ti iti globally
l b ll
according to portfolio and specific
project requirements
Impact bottom-line by unlocking
hidden potential extracting
synergies
i benefits
b
fit off global
l b l scale
l
and revised processes
Global
Development Centres
Global Supply chain
Lean Manufacturing
Impact bottom-line by optimizing external cost management (bundling, best cost country sourcing, design
to cost)) along
g an integrated
g
lean manufacturing
g structure tight
g to current and expected
p
customer needs
London 2nd December 2010
Master 27 11 -v27+TS.ppt
55
Ansaldo STS
Investor Meeting
g 2010
Road to 150
Ansaldo STS, VP Supply Chain
Eric Morand
Excellence in Supply chain: the Road to 150
3 years cross functional project to enhance ASTS business model
Supply chain excellence a key pillar to
sustain ASTS business model
Supply chain Excellence
along 6 main levers
Value proposition
Product/
service offering
Target
segment(s)
Revenue
model
ASTS Business model
Cost structure
Organizational
Model
Operating model
Value chain
Design to Cost
and
Standardization
Supplier
Bundling
Price
Optimization
p
Supply Chain
Optimization/
E Procurement
E-Procurement
Hebel
Global/LCC
Gl
b l/LCC
Sourcing
Partnering
P
t
i
Make or Buy
Short term results will be delivered by ASTS suppliers, while medium and long term
results requiring ASTS to evolve transform its supply chain model
London 2nd December 2010
57
The p
pragmatic
g
approach
pp
in a snapshot
p
I
Spend analysis and prioritization of category optimization
II
Definition of procurement strategy and target by category
• Category standardization
• Spend and supplier analysis and potential synergies definition
• C
Category
t
workshops
k h
tto validate
lid t optimization
ti i ti h
hypotheses,
th
fformalize
li ttargett and
d evaluate
l t ease off
implementation and gather commitment as well as form the responsible teams
• Strategy recommendations, target setting and quick-wins to achieve savings immediately
III
Definition of the implementation plan and responsibilities
• Detailed planning of the master plan and of its implementation waves streams
• Definition of key milestones and check points for implementation
• Clear assignment of the responsibilities
IV
Definition and structuring
g of the key
y elements to support
pp
the implementation
p
• Launch the procurement optimization initiatives
• Definition of procurement performance metrics (KPI) to track and monitor savings
• Creation of cross-functional and cross-company teams
V
Improvement of purchasing maturity: resources, process and practices
• Assessment of current level of maturity and plan for the improvement
• Detailed
D t il d ttraining
i i b
both
th iin class
l
and
d on th
the jjob
b
London 2nd December 2010
Master 27 11 -v27+TS.ppt
58
Achieve 150M€ cumulate results on ~1B€ external spending:
protect margins and support commercial effectiveness
Saving target on
spend base
What
~15%
~20%
2012
2010
Direct Material – i.e. Cables, electronics, components
15%
10%
B i
Business
Services
S
i
– i.e.
i SW d
developments,
l
t E
Engineering
i
i services
i
10%
8%
Indirect Services – i.e. Facility mgmt, IT, Communication, Travel,
20%
20%
Packages& Subcontracting – Telecom,
Telecom Power supply....
supply
15%
10%
~35%
~30%
Scope
External
Spend
15%
Sustainable results protecting current margins,
hitting the bottom line and allowing for new
markets penetration & consolidation
London 2nd December 2010
Master 27 11 -v27+TS.ppt
59
12%
While achieving results, we are driving supply chain
+
pp
group
g
p value creation strategy
gy
model evolution to support
Workstreams
Main high priority initiatives
Boards and components
Global tender and standardization
Cables
Standardization and global tender
Racks & cabinets
Standardization
Electric components
Best Cost Country Sourcing (BCCS)
Mechanical & plastic parts
Best Cost Country Sourcing (BCCS)
Design and engineering
Make or buy strategy
Apparatus and equipment for PSS
Standardization and global tender
y
Telecommunication subsystem
Standardization and g
global tender
Station Auxiliary subsystem
Standardization and global tender
Global supply chain orchestration
London 2nd December 2010