CAMLICA ELEKTRIK URETIM A.S.
CAMLICA HEPP LAND ACQUITISION
REPORT
ZAMANTI RIVER IN KAYSERI PROVINCE
Reporting Form for Land Acquisition / Social Impacts of Portfolio Projects.
Name & Location of Sub-project: Çamlıca HEPP, Zamantı River in Kayseri Province.
Project Sponsor: Çamlıca Elektrik Üretim A.Ş. is the owner of the Çamlıca III HEPP project. Çamlıca Elektrik
Üretim A.Ş., established in 2003, joined Akfen Group in 2007. The company is established to generate electricity
with hydroelectric power plants and carrying out Çamlıca HEPP investment in Kayseri, Saraçbendi HEPP
investment in Sivas .
Project cost: The investment cost of Çamlıca III HEPP is 34.248.240 € (VAT and interest cost are not included)
Installed generation capacity (No. units X MW/unit): Çamlıca III is a medium head power plant consisting of a 50
m high concrete (hardfill) dam with spillway, sluiceway and power intake, a transfer tunnel of 4,7 m diameter and
about 3.169 m length, a surge tank of 18 m diameter and 37,40 m height, an open penstock of about 78 m length and
a trifurcation leading to the powerhouse. The powerhouse is a free standing type building in a rock cut and houses 3
units Francis turbines with vertical shaft and about 8,6 MW each, i.e. 25,81 MW installed capacity and will produce
approximately 75.9 GWh of power annually.
Key Dates of implementation : The Public Benefit Decision has been given on April 10th, 2008 by EMRA (EPDK).
General Info : Çamlıca A.Ş. initial approach for every project is to avoid social impacts, at any possible extent ,
particularly physical or economic displacement. The construction of project which is being supported by TSKB is
currently underway and the land acquisition process has already finished.
For Çamlıca III, 132.811 m2 of land will be affected, of which 13.029 m2 belongs to the Forestry Department and
119.782 m2 is privately owned. The total number of people (number of share holders of real estates) affected from
expropriation is 65 and 51 of them are male, 14 of them is female. According to the land list, there were not any
houses which will be affected from expropriation.
The bulk of affected private land is currently used for agriculture or other productive purposes. However the
amount of land planned to be expropriated (119.782 m2 for Çamlıca III HEPP) is not so much when we compare
with the surrounding agricultural land. In the majority of cases, households whose land is being acquired have land
elsewhere and will also be able to replace the acquired land elsewhere in the immediate area if so desired. Thus the
economic impacts of land acquisition are deemed to be limited.
For the expropriation of the immovable properties needed for the implementation of the project; an expropriation
decision has been taken by the Energy Market Regulatory Board, pursuant to Article 15/c of the Electricity Market
Law No. 4628 and Article 7 of the Expropriation Law No. 2942.
Because the expropriation decision has enabled the enforcement of the “Council of Ministers Decree on
the Application of Article 27 of Expropriation Law No. 2942 in the Expropriations to be Carried Out by the Energy
Market Regulatory Authority” , published in the Official Gazette no. 25599 dated 30 September 2004, the Energy
Market Regulatory Authority will file urgent expropriation lawsuits with the local Court of First Instance, with a
request for the seizure of the immovable properties listed in the annexed list and the determination of expropriation
fees.
The estimated expropriation fees to be determined as a result of the on-site examination to be performed by the court
expert witnesses as a result of these lawsuits will be listed by indicating the owners and shareholders of the
immovable properties to be expropriated, and they will be deposited with the bank as ready for payment. The related
persons may withdraw the expropriation fees from the mentioned bank branches, by presenting the ID cards,
certificate of inheritance or power of attorney.
For the finalization of these expropriation fees, the Energy Market Regulatory Authority Valuation Commission will
also conduct a valuation work and conciliation meetings will be held on site through notices to be sent to the owners
of properties.
In order to judge the impacts of land acquisition the following points are considered; compliance with legal
legislation (official document listing existing water usage rights in that region, public benefit decision for
expropriation- appropriation), any evidence related to the public opposition, amount of expropriation area, land
usage type (agricultural, pasture, forestry, arid), number of affected persons, and investing company’s intention for
voluntary sale. Furthermore progress report of the project owner is followed, which informs the actual expropriation
state.
Inventory of Land & Assets Acquired from Private Owners : The table is given in attached excel file, because the
table has too many columns so that, it doesn’t fit into word format.
Inventory of Public, Community, or State Land Acquired : The table is given in attached excel file, because the
table has too many columns so that, it doesn’t fit into word format.
Public Awareness, Consultations, and Communication :
In accordance with the EIA requirements in Turkey, Çamlıca Elektrik ÜretimA.Ş. has held public hearing sessions
for affected communities at its hydropower project sites. A Public Participation Meeting was held on April 28, 2010
in Çavdaruşağı Village of Yahyalı Town. Invitations were announced in local and regional newspapers in advance.
At the public opinion hearing sessions, available information about the project including the social and economic
impact of the project were provided to the public. Environmental concerns and mitigation measures, technology
proposed and detailed explanation of the applicable regulations was provided.. The meetings were followed by a site
visit. Key issues raised by stakeholders at these meetings included requests for maximizing local employment,
requests for further information regarding the land acquisition procedure and whether water from the impoundments
might be used for irrigation purposes. In response to these questions, the company has hired local people wherever
possible (roughly half the construction labour force comes from surrounding villages), has provided additional
information on the land acquisition process and has indicated that it will discuss with Government the possibility of
providing additional access across the Zamantı River and whether water could in future be used for irrigation
purposes. The construction of plant will have limited effects on the demographic conditions since the number of
workers in the construction phase will be 250 people. A total of 15 people will be employed during the operation
phase of the project.
The personnel to be employed during the construction and operation phase will create employment for people in the
project region which will contribute to income and livelihood of the local population.
The Project activities will not be causing any physical damages such as destroying of land of economical value
(agricultural land, fruit gardens, shopping area) and/or public land such as forest area , land of cultural value or land
housing infrastructure that would negatively affect the socio-economic environment in the Project region. There are
no residential units within the project sites hence no re-settlement action will be required for the project activity. The
project will not cause any changes in the current transportation system in the region.
The Project is not expected to cause any major health risks on the population in the project region during the
operation phase. All sorts of wastes will be handled safely and without public contact according to the national
regulations. The personnel will be receiving health checks periodically in order to minimize the risk of an out-break
of a communicable disease.
The stakeholders in the meeting were mostly the representatives of local administrative units mainly village heads
(muhtar) from surrounding villages and the villagers. All the headings were held in Turkish. The environmental and
social aspects were discussed by the stakeholders and clarifications were sought. The overall response to the project
was positive.
The environmental and social aspects were discussed by the stakeholders and clarifications were sought. The overall
response to the project was positive.
Some points have been emphasized by the stakeholders such as the village roads near the Project regions and
employment of local people for the Project. The questions regarding employment were answered by the project
participant. The PP stated that during the construction process, employees will be provided from local people.
However, since the single computerized system requires certain skills, much qualified people will be necessary at
the operation process.
The Project team ensured that all relevant national legislation will be respected and complied during the Project
activities.
Stakeholder engagement beyond the EIA meetings and one-on-one discussions around land acquisition has been
relatively informal to date, but based on interviews with community leaders, community-project relations are
positive, mainly due to the large proportion of locally employed persons active at this phase of project development.
Community concerns and requests for assistance are directed to Akfen Enerji staff members. A range of corporate
social investments has been made at each of the two projects currently under construction; these include elements
such as road improvements, donation of computers to local municipal libraries, construction of new village access
routes and the like.
TSKB’s review indicates that local communities are supportive of these developments and that no community
resistance to the construction of these projects has been identified to date. This is based on the outcomes of public
hearings and TSKB site-level meetings with community leaders and some affected parties.
Status of Land Acquisition : The The table is given in attached excel file, because the table has too many columns
so that, it doesn’t fit into word format.
Other Measures or Assistance provided (beyond cash compensation) : A range of corporate social investments has
been made at the project currently under construction; these include elements such as road improvements, renewing
school and mosques, donation of computers to local municipal libraries, construction of new village access routes,
etc. The company has hired local people wherever possible. (most of the construction labour force comes from
surrounding villages)
Identification of Vulnerable People : There are no vulnerable people inhabiting the Project area. It has been
determined via meeting with Village Headmen.
Grievance Redress : There is no grievance until now for the construction of our HEPP project. The relations
between the people at the construction site and the villagers and headmen are held positive all the time.
Local people generally complaint to village headmen when there is a problem related with the project or any other
issue related with daily life, and the village headmen makes the necessary action related with the complaints. In
other words, the village headmen is the key person to register grievances or complaints, and he/she makes the
necessary steps to solve the problems.
Discussions with village Headmen and affected persons confirmed that the EIA consultation meetings have been the
primary source of project information to date for local communities. In addition to the formal EIA meetings, a series
of informal meetings have been held with all households whose land or homes are to be impacted by the project, in
order to define the extent of affected property and to define and negotiate compensation amounts. Stakeholder
engagement beyond the EIA meetings and one-to-one discussions around land acquisition has been relatively
informal to date, but based on interviews with community leaders, community-project relations are positive, mainly
due to the large proportion of locally employed persons active at this phase of project development.
KAMULAŞTIRILACAK TAŞINMAZ MALLAR LİSTESİ (ALAN-m 2)
LİST OF REAL ESTATE TO BE EXPROPRIATED (m 2)
1
2
3
4
5
NİTELİK
OWNERSHIP
PRIVATE OWNERSHIP
PRIVATE OWNERSHIP
PUBLIC OWNERSHIP (USED BY THIRD PARTIES)
PUBLIC OWNERSHIP (USED BY THIRD PARTIES)
PUBLIC OWNERSHIP (NOT USED BY THIRD PARTIES)
FORESTARY AREA (NOT USED BY THIRD PARTIES)
TOPLAM
Türü
Type
OPEN NEGOTIATION
EXPROPRIATION
OPEN NEGOTIATION
COURT DECISION
APPROPRIATION
APPROPRIATION
Status
Completed
Completed
Completed
Not Completed
Completed
Not Completed
Completed
TOPLAM(m2)
TOTAL AREA
14,932.060
104,850.560
13,028.760
Completed
Not Completed
132,811.320
1
KAYSERİ
2
KAYSERİ
3
KAYSERİ
4
KAYSERİ
5
KAYSERİ
6
KAYSERİ
6
KAYSERİ
7
KAYSERİ
8
KAYSERİ
9
KAYSERİ
10
KAYSERİ
11
KAYSERİ
YAHYALI
BALCIÇAKIRI
YAHYALI
BALCIÇAKIRI
YAHYALI
BALCIÇAKIRI
YAHYALI
BALCIÇAKIRI
YAHYALI
BALCIÇAKIRI
YAHYALI
BALCIÇAKIRI
YAHYALI
BALCIÇAKIRI
YAHYALI
BALCIÇAKIRI
YAHYALI
BALCIÇAKIRI
YAHYALI
BALCIÇAKIRI
YAHYALI
BALCIÇAKIRI
YAHYALI
13 AMLICA III HE KAYSERİ
YAHYALI
KAYSERİ
15
KAYSERİ
16
KAYSERİ
17
KAYSERİ
59
RATE OF
SHARE
GÜLİSTAN ERDİL
1/1
YAHYALI
BALCIÇAKIRI
YAHYALI
BALCIÇAKIRI
YAHYALI
BALCIÇAKIRI
YAHYALI
BALCIÇAKIRI
M35A11A
M35A11A
M35A11A
M35A11A
M35A11A
M35A11A
M35A11A
M35A11A
M35A11A
M35A11A
M35A11A
M35A11A
M35A11A
M35A11A
M35A11A
M35A11A
M35A06D-11A
113
60
HACI KARABULUT
1/1
113
61
AHMET KARABUĞA
1/1
113
62
İBRAHİM AKGÜN
1/1
113
63
MEHMET AKGÜN
1/1
113
64
VEYSEL AKGÜN
1/1
113
65
HASAN SAPMAZ
1/1
113
66
EŞE AKÇAKOCA
1/1
113
67
EŞE AKÇAKOCA
1/1
113
68
EŞE AKÇAKOCA
1/1
113
69
HATİCE AKÇAKOCA
1/1
113
70
ALİ AKÇAKOCA
1/1
113
71
MEHMET AKÇAKOCA
1/1
113
72
EŞE AKÇAKOCA
1/1
113
73
İBRAHİM AKÇAKOCA
1/1
113
74
CUMA EKİM
1/1
113
75
HALİL EKİM
1/1
113
76
HALİL EKİM
1/1
TOTAL AREA
(m²)
EXPROPRIATED AREA
(m²)
4,068.85
n.a
M35A11A
12 AMLICA III HE KAYSERİ
14
113
NAME - SURNAME
TYPE OF
REAL
ESTATE
BALCIÇAKIRI
OWNERS
Owner’s/user
’s total land
holding (ha);
% taken for
project.
YAHYALI
PLOT NO
DISTRICT
POINT NO
TOWN
SECTION NO
PROVINCE
EXPROPRIATION LIST
n.a
n.a
TARLA
4,068.85
TARLA
1,033.84
BAHÇE
460.72
n.a
BAHÇE
1,988.05
n.a
BAHÇE
688.39
n.a
BAHÇE
5,308.21
n.a
1,180.06
n.a
BAHÇE
3,289.15
n.a
BAHÇE
871.63
n.a
BAHÇE
925.22
n.a
BAHÇE
4,965.36
n.a
BAHÇE
1,396.55
n.a
n.a
1,117.32
175.89
1,117.32
175.89
n.a
BAHÇE
2,056.09
n.a
BAHÇE
1,494.72
n.a
BAHÇE
1,183.94
n.a
TARLA
477.01
1,033.84
460.72
1,988.05
688.39
5,308.21
1,180.06
3,289.15
871.63
925.22
4,965.36
1,396.55
1,117.32
175.89
2,056.09
1,494.72
1,183.94
477.01
REASON FOR
EXPROPRIATION
SANTRAL YERİ
(POWERHOUSE
AREA)
SANTRAL YERİ
(POWERHOUSE
AREA)
SANTRAL YERİ
SANTRAL YERİ
(POWERHOUSE
AREA)
SANTRAL YERİ
(POWERHOUSE
AREA)
SANTRAL YERİ
(POWERHOUSE
AREA)
SANTRAL YERİ
(POWERHOUSE
AREA)
SANTRAL YERİ
(POWERHOUSE
AREA)
SANTRAL YERİ
(POWERHOUSE
AREA)
SANTRAL YERİ
(POWERHOUSE
AREA)
SANTRAL YERİ
(POWERHOUSE
AREA)
SANTRAL YERİ
(POWERHOUSE
AREA)
SANTRAL YERİ
(POWERHOUSE
AREA)
SANTRAL YERİ
(POWERHOUSE
AREA)
SANTRAL YERİ
(POWERHOUSE
AREA)
SANTRAL YERİ
(POWERHOUSE
AREA)
SANTRAL YERİ
(POWERHOUSE
AREA)
SANTRAL YERİ
(POWERHOUSE
AREA)
STATUS
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
TYPE OF TRANSFER
KAYSERİ
YAHYALI
BALCIÇAKIRI
M35A11A
113
77
MEHMET EKİM
1/1
113
78
MUSA KARABUĞA
DURAN KARABUĞA
1/2
1/2
YAHYALI
BALCIÇAKIRI
20
KAYSERİ
YAHYALI
YEŞİLKÖY
M35A11A
130
1
ALİ AKKOYUN
1/1
21
KAYSERİ
YAHYALI
YEŞİLKÖY
M35A11A
130
3
BEKİR ÇALIM
1/1
22
KAYSERİ
YAHYALI
YEŞİLKÖY
M35A11A
130
4
EMİNE GÖKAY
1/1
KAYSERİ
YAHYALI
YEŞİLKÖY
M35A11A
130
5
BEKİR ÇALIM
1/1
KAYSERİ
YAHYALI
YEŞİLKÖY
M35A11A
130
6
MEHMET CANSEVER
1/1
25
KAYSERİ
YAHYALI
YEŞİLKÖY
M35A11A
129
19
DURMUŞ ALİ GÖKAY
1/1
26
KAYSERİ
YAHYALI
YEŞİLKÖY
M35A11A
129
22
MUSTAFA GÖKAY
1/1
27
KAYSERİ
YAHYALI
YEŞİLKÖY
129
23
AYŞE FATMA ÇAKO
1/1
28
KAYSERİ
YAHYALI
YEŞİLKÖY
129
26
HÜSEYİN İLÇİN
1/1
YAHYALI
YEŞİLKÖY
129
27
MEHMET İLÇİN
1/1
YAHYALI
YEŞİLKÖY
129
28
ALİ İLÇİN
1/1
YAHYALI
YEŞİLKÖY
129
29
BAYRAM İLKİN
1/1
YAHYALI
YEŞİLKÖY
128
53
MUSTAFA YAHŞİ
1/1
YAHYALI
YEŞİLKÖY
128
54
ZİYA YAHŞİ
1/1
YAHYALI
YEŞİLKÖY
128
55
AYŞE AKKOYUN
1/1
YAHYALI
YEŞİLKÖY
128
56
İBRAHİM SARIBOĞA
1/1
YAHYALI
YEŞİLKÖY
128
57
FATMA ÇALIM
1/1
YAHYALI
YEŞİLKÖY
128
61
YUSUF ÇAKAR
1/1
YAHYALI
YEŞİLKÖY
128
65
ABDURRAHMAN AKBOĞA
1/1
YAHYALI
YEŞİLKÖY
128
66
AHMET İLÇİN
1/1
YAHYALI
YEŞİLKÖY
128
67
ALİ İLÇİN
1/1
YAHYALI
YEŞİLKÖY
128
68
HÜSEYİN İLÇİN
1/1
YAHYALI
YEŞİLKÖY
128
69
MEHMET İLÇİN
1/1
YAHYALI
YEŞİLKÖY
128
70
DURSUN İLÇİN
1/1
YAHYALI
YEŞİLKÖY
128
71
SÜLEYMAN GÖKAY
1/1
YAHYALI
YEŞİLKÖY
128
72
BAYRAM AKBOĞA
1/1
YAHYALI
YEŞİLKÖY
128
73
HACI AKBOĞA
1/1
YAHYALI
YEŞİLKÖY
128
74
KADER AKBOĞA
1/1
19
KAYSERİ
23
24
29
30
KAYSERİ
KAYSERİ
31
KAYSERİ
32
KAYSERİ
33
KAYSERİ
34
KAYSERİ
35
36
KAYSERİ
KAYSERİ
37
KAYSERİ
38
KAYSERİ
39
40
41
KAYSERİ
KAYSERİ
KAYSERİ
42
KAYSERİ
43
KAYSERİ
44
45
46
47
KAYSERİ
KAYSERİ
KAYSERİ
KAYSERİ
M35A11A
M35A11A
M35A11A
M35A11A
M35A11A
M35A11A
M35A11A
M35A11A
M35A11A
M35A11A
M35A11A
M35A11A
M35A11A
M35A11A
M35A11A
M35A11A
M35A11A
M35A11A
M35A11A
M35A11A
M35A11A
M34B15C
n.a
BAĞ
n.a
BAHÇE
911.33
911.33
1,326.06
1,326.06
n.a
BAĞ
1,435.28
1,435.28
n.a
BAHÇE
2,183.05
2,183.05
n.a
BAHÇE
2,805.74
2,805.74
2,957.08
2,957.08
6,840.49
6,840.49
n.a
n.a
BAHÇE
BAHÇE
n.a
BAĞ
981.54
218.16
n.a
BAĞ
1,136.00
380.05
n.a
BAĞ
1,747.25
n.a
BAĞ
2,051.56
n.a
n.a
BAĞ
TARLA
2,071.12
2,543.28
n.a
BAHÇE
920.42
n.a
BAHÇE
1,071.41
n.a
BAĞ
n.a
BAHÇE
n.a
n.a
BAHÇE
BAHÇE
508.25
4,097.60
1,294.87
3,307.41
n.a
BAHÇE
2,292.94
n.a
BAHÇE
352.54
n.a
n.a
n.a
BAĞ
BAHÇE
BAHÇE
n.a
BAĞ
n.a
BAHÇE
n.a
n.a
BAHÇE
TARLA
n.a
n.a
1,252.21
388.19
816.47
1,240.01
357.77
1,463.08
398.77
3,905.96
TARLA
1,519.84
633.67
1,365.22
1,662.93
1,960.55
920.42
1,071.41
508.25
4,097.60
1,294.87
2,142.42
231.33
220.44
1,252.21
388.19
816.47
1,240.01
357.77
1,463.08
398.77
905.84
220.47
SANTRAL YERİ
(POWERHOUSE
AREA)
SANTRAL YERİ
(POWERHOUSE
AREA)
BARAJ GÖL ALANI
(DAM LAKE AREA)
BARAJ GÖL ALANI
(DAM LAKE AREA)
BARAJ GÖL ALANI
(DAM LAKE AREA)
BARAJ GÖL ALANI
(DAM LAKE AREA)
BARAJ GÖL ALANI
(DAM LAKE AREA)
BARAJ GÖL ALANI
(DAM LAKE AREA)
BARAJ GÖL ALANI
(DAM LAKE AREA)
BARAJ GÖL ALANI
(DAM LAKE AREA)
BARAJ GÖL ALANI
(DAM LAKE AREA)
BARAJ GÖL ALANI
(DAM LAKE AREA)
BARAJ GÖL ALANI
(DAM LAKE AREA)
BARAJ GÖL ALANI
(DAM LAKE AREA)
BARAJ GÖL ALANI
(DAM LAKE AREA)
BARAJ GÖL ALANI
(DAM LAKE AREA)
BARAJ GÖL ALANI
(DAM LAKE AREA)
BARAJ GÖL ALANI
(DAM LAKE AREA)
BARAJ GÖL ALANI
(DAM LAKE AREA)
BARAJ GÖL ALANI
(DAM LAKE AREA)
BARAJ GÖL ALANI
(DAM LAKE AREA)
BARAJ GÖL ALANI
(DAM LAKE AREA)
BARAJ GÖL ALANI
(DAM LAKE AREA)
BARAJ GÖL ALANI
(DAM LAKE AREA)
BARAJ GÖL ALANI
(DAM LAKE AREA)
BARAJ GÖL ALANI
(DAM LAKE AREA)
BARAJ GÖL ALANI
(DAM LAKE AREA)
BARAJ GÖL ALANI
(DAM LAKE AREA)
BARAJ GÖL ALANI
(DAM LAKE AREA)
BARAJ GÖL ALANI
(DAM LAKE AREA)
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
EXPROPRIATION
18
48
49
50
51
KAYSERİ
KAYSERİ
KAYSERİ
KAYSERİ
52
KAYSERİ
53
KAYSERİ
54
KAYSERİ
55
56
KAYSERİ
KAYSERİ
57
KAYSERİ
58
KAYSERİ
59
KAYSERİ
60
KAYSERİ
61
KAYSERİ
62
KAYSERİ
63
63
KAYSERİ
KAYSERİ
YAHYALI
YEŞİLKÖY
YAHYALI
YEŞİLKÖY
YAHYALI
YEŞİLKÖY
YAHYALI
YEŞİLKÖY
YAHYALI
YEŞİLKÖY
YAHYALI
YEŞİLKÖY
YAHYALI
YEŞİLKÖY
YAHYALI
YEŞİLKÖY
YAHYALI
YEŞİLKÖY
YAHYALI
YEŞİLKÖY
YAHYALI
YEŞİLKÖY
YAHYALI
YEŞİLKÖY
YAHYALI
YEŞİLKÖY
YAHYALI
YEŞİLKÖY
YAHYALI
YEŞİLKÖY
YAHYALI
YEŞİLKÖY
YAHYALI
ÇAMLICA
M34B15C
M34B15C
M34B15C
M34B15C
M34B15C
M34B15C
M34B15C
M34B15C
M34B15C
M34B15C
M34B15C
M34B15C
M34B15C
M34B15C
M34B15C
M34B15C
M34B15C
101
117
ABDURRAHMAN AKBOĞA
1/1
101
118
AHMET İLÇİN
1/1
101
119
MEHMET İLÇİN
1/1
101
121
ŞENOL İLÇİN
1/1
101
122
VELİ GÖKAY
1/1
101
123
ABDURRAHMAN AKBOĞA
1/1
101
124
CUMA NAZLI
1/1
101
125
ELİF NAZLI
1/1
101
126
KADİR İLÇİN
1/1
101
127
ESER NAZLI
1/1
101
128
AHMET VARDAR
1/1
101
129
İBRAHİM KARASLAN
DURAN KARASLAN
1/2
1/2
101
130
DUDU ÖĞÜT
1/1
101
131
FADİŞ VARDAR
1/1
101
132
ALİ OSMAN ÖĞÜT
1/1
101
133
SÜLEYMAN ÖĞÜT
1/1
150
9
HACI ATMACA
1/1
n.a
n.a
n.a
n.a
TARLA
TARLA
TARLA
TARLA
7,729.30
1,041.39
1,554.39
3,273.39
n.a
TARLA
1,883.19
n.a
TARLA
2,245.39
n.a
TARLA
1,524.33
n.a
n.a
TARLA
TARLA
1,282.84
4,069.77
n.a
TARLA
1,125.47
n.a
TARLA
1,597.84
n.a
TARLA
n.a
TARLA
n.a
TARLA
3,509.42
1,314.51
803.78
n.a
TARLA
1,996.78
n.a
n.a
BAHÇE
3,351.00
13,752.00
942.60
1,041.39
1,178.76
3,273.39
1,883.19
2,245.39
1,524.33
1,282.84
4,069.77
1,125.47
1,597.84
3,509.42
1,314.51
803.78
1,996.78
3,351.00
13,752.00
BARAJ GÖL ALANI
(DAM LAKE AREA)
BARAJ GÖL ALANI
(DAM LAKE AREA)
BARAJ GÖL ALANI
(DAM LAKE AREA)
BARAJ GÖL ALANI
(DAM LAKE AREA)
BARAJ GÖL ALANI
(DAM LAKE AREA)
BARAJ GÖL ALANI
(DAM LAKE AREA)
BARAJ GÖL ALANI
(DAM LAKE AREA)
BARAJ GÖL ALANI
(DAM LAKE AREA)
BARAJ GÖL ALANI
(DAM LAKE AREA)
BARAJ GÖL ALANI
(DAM LAKE AREA)
BARAJ GÖL ALANI
(DAM LAKE AREA)
BARAJ GÖL ALANI
(DAM LAKE AREA)
BARAJ GÖL ALANI
(DAM LAKE AREA)
BARAJ GÖL ALANI
(DAM LAKE AREA)
BARAJ GÖL ALANI
(DAM LAKE AREA)
BARAJ GÖL ALANI
(DAM LAKE AREA)
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
LAND USERS
NAME - SURNAME
RATE OF
SHARE
TYPE OF
REAL
ESTATE
PLOT NO
DISTRICT
POINT NO
TOWN
SECTION NO
PROVINCE
LIST OF PUBLIC LANDS
TOTAL
AREA (m²)
ACQUISITI
ON AREA
(m²)
REASON FOR
ACQUISITION
YAHYALI
1
KAYSERİ
YEŞİLKÖY
M35A11A
101
120 MALİYE HAZİNESİ
TAM
HAM TOPRAK
460.70
460.70 LAKE AREA
YEŞİLKÖY
M35A11A
129
24 MALİYE HAZİNESİ
TAM
YEŞİLKÖY
M35A11A
130
2 MALİYE HAZİNESİ
TAM
ÇALILIK
4571.09
ÇALILIK
542.93
199.74 LAKE AREA
542.93 LAKE AREA
ÇAMLICA
M35A11A
150
10 MALİYE HAZİNESİ
TAM
FUNDALIK
114039.00
11825.39 DAM BODY
YAHYALI
2
KAYSERİ
3
KAYSERİ
YAHYALI
YAHYALI
4
KAYSERİ
STATUS
EMRA's
APPROVAL
HAS BEEN
OBTAINED
EMRA's
APPROVAL
HAS BEEN
OBTAINED
EMRA's
EMRA's
APPROVAL
HAS BEEN
OBTAINED
TYPE OF
TRANSFER
APPROPRIATION
APPROPRIATION
APPROPRIATION
APPROPRIATION