MUNICIPAL SERVICES PROJECT - BERGAMA PROCUREMENT PLAN (Fourth Revision / Apr l 04, 2008)
1
2
2
Ref.
No.
Description
3
4
6
7
8
Type
Contract No.
No. of
packages
Proc. Method
Review by Bank
Prior/Post
Preperation
BD/RFP date
BER-W1
1
NCB
POST
July 2007
BER-G1
multiple
Shopping
C
BER-C1
1
9
Expected BidOpen.
Date/Proposal
Submission
Date
10
11
Conctract
signed date
Contract
completion date
May-08
February 2009
POST
Apr l 2008
December 2008
SSS
PRIOR
June 2007
May-08
February 2007
Apr l 2009
WORKS (INCLUDING SUPPLY & INSTALLATION)
N AAT LER (TEM N VE MONTAJ DAH L)
losure Authorized
Public Disclosure Authorized
Public Disclosure Authorized
1
Construction of Sanitary Landfill and
Transfer Station and Closing of the
Existing Landfill
Kat At k Düzenli Depolama Tesisi,
Works
Aktarma stasyonu n aat ve
Mevcut Tesisin Kapat lmas
n aat leri Alt-Toplam
Works Sub-Total
1
September 2007
GOODS
MAL VE EK PMAN ALIMI
Procurement of Equipment,
Software,Hardware, vehicle and
construction equipment for Operational
Services
Kurumsal Yap lanma kapsam nda
ekipman, yaz l m, donan m, araç
ve i makinesi al m
Goods
Mal Al m Alt-Toplam
Goods Sub-Total
CONSULTANT’S SERVICES AND TRAINING
DANI MANLIK H ZMETLER VE E T M
ÇED Haz rlanmas
1
Preparation of EIA
2
Review and Revision of the Final Designs, Mevcut Projenin ncelenmesi ve
Preparation of the Bidding Documents
Revizyonu, hale Dokümanlar n n
and Construction Supervision
Haz rlanmas ve n aat Kontroll u
C
BER-C2
1
QCBS
POST
3
Institutional Strengthening
Kurumsal Güçlenme
C
BER-C3
multiple
CQ
POST
January 2007
December 2008
4
Consultancy Services for Project
Implementation Management
Proje Uygulama Yönetimi
Mü avirlik Hizmetleri
C
BER-C4
multiple
Individual
POST
January 2007
December 2008
5
Training
E itim
C
BER-C5
multiple
Other
POST
June 2007
December 2008
Consultant Sub-Total
Mü avirlik Alt-Toplam
TOTAL
TOPLAM
October 2006
November 2006
a) All ICB contracts for works and goods and first two NCB works, and goods contracts, first two Shopping Contracts and all direct contracting will be subject to prior review by the Bank.
b) The works contracts to cost less than Euro 7,5 million each may be awarded through NCB.
Bank’s sample NCB documents for ECA Region for Works will be used. The conditions for using NCB are listed in Schedule 4 to the Loan Agreement.
c) Consultancy services by firms estimated to cost Euro 200,000 or more per contract, individual consultant contracts estimated to cost Euro 50,000 or more
and single source selection of consultants will be subject to prior review by the Bank.
d) Short lists composed entirely of national consultants: Short lists of consultants for services estimated to cost less than Euro 200,000 equivalent per contract may be composed
entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines.

Benzer belgeler

World Bank Document

World Bank Document a) All ICB contracts for works and goods and first NCB works, and goods contracts, first Shopping Contracts and all direct contracting will be subject to prior review by the Bank. b) The works cont...

Detaylı