COMPANY PROFILE

Transkript

COMPANY PROFILE
COMPANY PROFILE
ACD
ACD Insaat Tes. Tar. Hay. San. Ve Tic. Ltd. Sti.
Ceyhun Atuf Kansu Cad. No:137/4-5
Balgat – Cankaya / ANKARA-TURKEY
Tel: +90 312 473 41 81/82
Fax: +90 312 473 41 83
http://www.acd-insaat.com
ACD İnşaat Tesisat Ticaret Ltd. Şti.
Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey
Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83
http://www.acd-insaat.com
BRIEFLY ABOUT ACD
ACD is an international construction company established in 2002. The company
specialized in oil pipeline construction, gas pipeline construction, water pipeline
construction, pump station & compressor station construction, natural gas RMS station
construction, oil field development projects, process piping works, hot-tap and stopple
operations.
ACD successfully performed numerous projects for the last ten years. These projects
have been performed in four different countries and the list includes 17 pipeline
construction projects, 7 pump station & 2 compressor station construction projects, 3 oil
field development projects, 15 RMS-A station construction projects, 4 industrial & plant
piping, 2 power station piping projects and more than 50 hot-tap & stopple operations.
The company has a professional team of experts specialized in their fields and has its
own construction equipment to perform pipeline and piping works. The head office is
located in Ankara and the warehouse & equipment park is located in Haymana.
The purpose of ACD Construction Company is to complete the commitments it
undertakes, and further stand reliable and trustworthy in this competitive market. In
order to succeed these core values and missions, ACD Construction Company is
determined to become an indispensable organization by creating additional values for its
clients.
Company Profile 2 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti.
Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey
Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83
http://www.acd-insaat.com
TOOLS & EQUIPMENT
Units
Capacity /
Model
Brand
Pipelayer (Sideboom)
1
1983 / TD 25 CS
65 tons
International
Pipelayer (Sideboom)
2
1992 / D7
45 tons
Caterpillar
Pipelayer (Sideboom)
5
1974 - 1986 / D6
30 – 36 tons
Caterpillar
Pipelayer (Sideboom)
1
1987 / D65 A
20 tons
Komatsu
Pipelayer (Sideboom)
1
1990 / D4
12 tons
Caterpillar
Hydraulic Pipe Bending Machine
1
22” – 36”
1998
CRC-Evans
Hydraulic Pipe Bending Machine
1
4” – 20”
1990
CRC-Evans
Pneumatic Internal Clamp
8
12”-14”-16”-24”
28”-30”-48”-80”
Vietz / CRC
Mobile Crane
1
1975 / LT1030
30 tons
Liebherr
Boom truck (Hi-up)
1
25 Tons
2008
Hidrokon / BMC
Boom truck (Hi-up)
1
20 Tons
2005
Kocoglu / Man
Paywelder (4 welding sets)
2
2003
Vietz – Arcotrac 4
Paywelder (4 welding sets)
3
2008
2009
Volvo
Excavator
2
2012 / HMK300
30 tons
Hidromek
Excavator
1
2005 / D 320L
20 tons
Caterpillar
Excavator
1
2011
30 tons
JCB
Tools and Equipment
Company Profile 3 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti.
Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey
Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83
http://www.acd-insaat.com
Tools and Equipment
Units
Capacity /
Model
2012 /HMK200W
20 tons
D7R XR
2003
938 H
2012
140G
1988
Caterpillar
Brand
Wheel Excavator
1
Hidromek
Bulldozer
1
Loader
1
Grader
1
Dump Truck
1
2008 / 30 tons
BMC
Fuel Tanker
1
2010 / 7 tons
Iveco
Tractor 4x4
2
2008
Tümosan
Welding Machine (Redresor)
20
WTU 455
RKM 450 / 650
Fronius (Gedik)
Welding Machine (Redresor)
16
405 SA
Lincoln
Diesel Generator
2
72 KVA
Perkins (Genpower)
Diesel Generator
4
GVP 142
142 kVA
Volvo ABB
(Genpower)
Hydrotest Filling Pump
1
12 bar
500 m3/h
Tempo
Hydrotest Pressurizing Pump
1
160 bar
16 m3/h
HPP Italy
Total Station
2
2010
Leica
Holiday Detector
4
20 KVA
SPY
External Clamp
12
Multiple sizes
-
Jeep 4x4
3
2012
2009
2011
Mitsubishi
Nissan
Jeep
Pick-Up 4x4
6
2012
2010
2003
Mitsubishi
Nissan
Ford
Car
5
2012
Hyundai
Minibus
2
2005
Ford
Caterpillar
Caterpillar
Company Profile 4 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti.
Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey
Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83
http://www.acd-insaat.com
TOOLS & EQUIPMENT
Company Profile 5 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti.
Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey
Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83
http://www.acd-insaat.com
TOOLS & EQUIPMENT
Company Profile 6 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti.
Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey
Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83
http://www.acd-insaat.com
REFERENCES
No
1
Project Description
Tuzgölü Fresh Water Pipeline & Natural Gas Pipeline Construction Project
/ Turkey
24” – 28” - 30” – 36” Total 150 km Pipeline Construction, Line Valve, Drain
Valve and Relief Valve Chambers Construction (total 267 each)
2
Erbil - Kalak - Dohuk Natural Gas Pipeline Construction Project / Iraq
24” and 36” Total 60 km Pipeline Construction
3
Kırsehir / Mucur Compressor Station Construction Project / Turkey
4
Batı Raman & Raman Oil Field Development Project / Turkey
90 km Flowline (Steel, PE & Stainless) Construction, 12 each Manifold
Construction
5
6
Pendik Pig Station 30” Valve Replacement Project / Turkey
30” Hottap / Stopple and Valve Replacement
Yeni Elektrik 850 MWe CCGT Natural Gas Feed Line Construction / Turkey
24” x 20” Hottap and Take-Off Valve Group Construction
7
Extending Water Pipeline form Sherkozh Storage to Suli Quarter / Iraq
48” – 17 km, 24” – 3 km Pipeline & 3 each Pump Station Construction
8
Oguz - Gabala - Baku Water Pipeline Project / Azerbaijan
80” - 47 km Pipeline Construction, 3 each Flow and Pressure Control
Chamber Construction
9
Sayda Province Natural Gas Pipeline Project / Algeria
8” - 25 km Pipeline Construction
10
Kesikkopru Dam to Ankara Ivedik Treatment Plant Pipeline Project / Turkey
64” - 30 km Pipeline Construction, Pump Station Construction
11
12
Baku – Tbilisi – Ceyhan (BTC) Crude Oil Pipe Line / Azerbaijan
42” - 430 km Pipeline Construction, 19 Block Valve Station, 2 Pumping
Station, 1 Pigging Station, 2 Check Valve Station Construction
Cankırı – Gerede Natural Gas Pipeline Project / Turkey
24” - 33 km Pipeline Construction
Company Profile 7 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti.
Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey
Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83
http://www.acd-insaat.com
No
Project Description
13
Ankara - Kazan Water Pipeline Project / Turkey
28” – 36” - 28 km Pipeline Construction
14
Ingaz High Pressure Natural Gas Pipeline / Turkey
8” – 2,5 km Pipeline Construction
15
Teksem Factory Natural Gas Conversion Works / Turkey
16
Turkey – Greece Natural Gas Pipeline Project / Turkey/Greece
36” – Pipeline Critical Welding Works and Hot-taps
17
Aliaga Pigging Station - RMS Station Natural Gas Pipeline / Turkey
20” - 8 km Pipeline Construction
18
Yozgat Sugar Factory RMS Station / Turkey
20.000 Nm3/h Natural Gas RMS-A Station Construction
19
PETKIM - 40 MW Gas Turbines and 14” Natural Gas Pipeline Construction
Project
20
Yumurtatepe - Seckoy Natural Gas Pipeline Project / Turkey
24” - 13 km Pipeline Construction
21
CS-5 Eskisehir Natural Gas Compressor Station Cyclone Filter Installation
22
Iran Natural Gas Pipeline Project / Turkey/Iran
Gas Distribution to Ardahan City and 48”x12” Hot -Tap Works
23
Bursa Natural Gas Pipeline Project / Turkey
Botas Displacement Works for 36” - 250 m
24
Botas Karacabey RMS Station Project / Turkey
50.000 Nm3/h Natural Gas RMS-A Station Construction
25
Botas M.K. Pasa RMS Station Project / Turkey
60.000 Nm3/h Natural Gas RMS-A Station Construction
26
Botas Malatya OIZ RMS Station Project / Turkey
15.000 Nm3/h Natural Gas RMS-A Station Construction
27
Botas Kahramanmaras OIZ RMS Station Project / Turkey
75.000 Nm3/h Natural Gas RMS-A Station Construction
Company Profile 8 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti.
Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey
Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83
http://www.acd-insaat.com
No
Project Description
28
Botas Payas OIZ RMS Station Project / Turkey
20.000 Nm3/h Natural Gas RMS-A Station Construction
29
Botas Iskenderun OIZ RMS Station Project / Turkey
20.000 Nm3/h Natural Gas RMS-A Station Construction
30
Natural Gas Utility Pipeline Infrastructure Works for Kocaeli – Gebze IVth
Istanbul Machinery and Manufacturing Organized Industrial Zone
31
Izmit - Kosekoy Bogging Area Displacement Works / Turkey
Botas Displacement Works 16” - 1250 m
32
Botas Mersin OIZ RMS Station Project / Turkey
20.000 Nm3/h Natural Gas RMS-A Station Construction
33
Botas Adana OIZ RMS Station Project / Turkey
75.000 Nm3/h Natural Gas RMS-A Station Construction
34
35
Botas Baser Kimya OIZ RMS Station Project / Turkey
2.000 Nm3/h Natural Gas RMS-A Station Construction
Botas Gaziantep OIZ RMS Station Project / Turkey
150.000 Nm3/h Natural Gas RMS-A Station Construction
36
Botas Adana West RMS Station Project / Turkey
50.000 Nm3/h Natural Gas RMS-A Station Construction
37
Botas Adana East RMS Station Project / Turkey
40.000 Nm3/h Natural Gas RMS-A Station Construction
38
Botas Mersin City OIZ RMS Station Project / Turkey
150.000 Nm3/h Natural Gas RMS-A Station Construction
39
Ingaz Inegol RMS Station Project / Turkey
50.000 Nm3/h Natural Gas RMS-A Station Construction
40
41
42
EGO Revision Works / Turkey
Revision of 18 each Natural Gas RMS-A Station and Integration of Scada
System
Turkuaz Ceramic Factory Natural Gas Conversion Project / Turkey
Blue Stream Pipeline Project (EGO – Ankara) / Turkey
48” x 36” Hot-Tap Works
Company Profile 9 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti.
Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey
Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83
http://www.acd-insaat.com
No
43
44
45
46
Project Description
Aksaray - Mercedes Truck Factory Natural Gas Conversion Project / Turkey
Anadolu Textile Factory Natural Gas Conversion Project / Turkey
TPIC (Turkish Petroleum Company) / Emity Oil - Natural Gas Distribution
System / Turkey
Construction of Pipelines from Natural Gas Wells to the Factories at Corlu
and Cerkezkoy Area,
4’’-6’’-8’’-10’’, 40 km Pipeline Construction
EGO Natural Gas Distribution System, Ankara / Turkey
36”-24”-18’’, 36 km Pipeline Construction, Compressor Station Construction
Company Profile 10 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti.
Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey
Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83
http://www.acd-insaat.com
ACD Hot-Tap & Line Stop Works Reference List / 2009 - 2012
No
Owner
Client
Operator
Company
Date
Location
BOTAŞ
Türkerler İnşaat
TDW
October
2012
Kırşehir
TDW
October
2012
Kırşehir
1
Work Description
40"x36"x36"x40" Line Stop /
Replacement
36" By-pass line (120 meters)
2
40"x36"x36"x40" Split Body Tee /
Hot-Tapping
BOTAŞ
Türkerler İnşaat
3
16"x16"x16"x16" Split Body Tee /
Hot-Tapping
İZMİRGAZ
4
30"x30"x30" Hot-tap Tee / Line
Stop
BOTAŞ
Kolin İnşaat
BOTAŞ İstanbul
İşletme
Müdürlüğü
5
22"x22"x22"x22" Split Body Tee /
Line Stop
ESGAZ
Ulusoy İnşaat
6
16"x16"x16" Hot-Tap Tee / Line
Stop
ARMAGAZ
Mekaser
Tecpesa
August
2011
Yalova
7
24"x20"x20"x24" Split Body Tee /
Hot-Tapping
BOTAŞ
Ekon / Ansaldo
Energia
Furmanite/Ipsco
October
2011
Kocaeli
8
48"x24"x24"x48" Split Body Tee /
Hot-Tapping
BOTAŞ
Fernas / OMV
TDW
November
2011
Samsun
9
16"x10"x10"x16" Split Body Tee /
Hot-Tapping
İZMİRGAZ
Kolin İnşaat
36"x24"x20"x36" Split Body Tee /
10 Hot-Tapping
BURSAGAZ
Arsan İnşaat
Furmanite/Ipsco July 2012
İzmir
Furmanite/Ipsco May 2012
İstanbul
Furmanite/Ipsco April 2012 Eskişehir
Furmanite/Ipsco July 2011
İzmir
Tecpesa
February
2011
Bursa
16"x16"x16"x16" Split Body Tee /
11 Hot-Tapping
BOTAŞ
Aksa Gaz
Furmanite/Ipsco
December
2010
Antalya
12"x12"x12"x12" Split Body Tee /
12 Hot-Tapping
BOTAŞ
Aksa Gaz
Furmanite/Ipsco
September
2009
Adana
18"x18"x18"x18" Split Body Tee /
13 Hot-Tapping
BOTAŞ
Aksa Gaz
Furmanite/Ipsco
September
2009
Adana
24"x16"x16"x24" Split Body Tee /
14 Hot-Tapping
BOTAŞ
Aksa Gaz
Furmanite/Ipsco
September
2009
Osmaniye
Aksa Gaz
September
Furmanite/Ipsco
2009
40"x16"x16"x40" Split Body Tee /
15 Hot-Tapping
BOTAŞ
Ceyhan
Company Profile 11 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti.
Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey
Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83
http://www.acd-insaat.com
CONTACT INFORMATION
Contact Person:
Enver Selim BOLUKBASI, Business Development Manager
Address and Contact Information:
Head Office
Address
: Ceyhun Atuf Kansu Cad. No:137/4-5
06520 Balgat – ANKARA / TURKEY
Tel
: +90 312 473 41 81
Mobile
: +90 533 688 55 71
Fax
: +90 312 473 41 83
E-mail
: [email protected]
Web Address : http://www.acd-insaat.com
Warehouse & Equipment Yard
Address
: Bumsuz Beldesi Girişi 2. km
Haymana – ANKARA / TURKEY
ANNEXES

ISO 9001, ISO 14001, OHSAS 18001, EMRA – Energy Market Regulatory
Authority Construction and Service Certificate

Detailed Project Description Sheets
Company Profile 12 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti.
Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey
Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83
http://www.acd-insaat.com
Company Profile 13 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti.
Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey
Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83
http://www.acd-insaat.com
Company Profile 14 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti.
Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey
Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83
http://www.acd-insaat.com
Company Profile 15 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti.
Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey
Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83
http://www.acd-insaat.com
Company Profile 16 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti.
Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey
Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83
http://www.acd-insaat.com
DETAILED PROJECT DESCRIPTION
Project Name:
Tuzgölü Fresh Water Pipeline & Natural Gas Pipeline Construction Project
Project Location:
Aksaray - Konya / Turkey
Client:
BOTAS / TCC China Tianchen Engineering Corporation
Project Start Date (month/year):
Completion Date (month/year):
05/2012
On going
Project Scope:
24” – 28” - 30” – 36” Total 150 km Pipeline Construction, Line Valve, Drain Valve and Relief
Valve Chambers Construction (total 225 each)
Company Profile 17 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti.
Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey
Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83
http://www.acd-insaat.com
DETAILED PROJECT DESCRIPTION
Project Name:
Erbil - Kalak - Dohuk Natural Gas Pipeline Construction Project
Project Location:
Erbil / Iraq
Client:
KAR Group / 77 Construction - Pikaron Joint Venture
Project Start Date (month/year):
Completion Date (month/year):
06/2012
12/2012
Project Scope:
24” and 36” Total 60 km Pipeline Construction
Company Profile 18 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti.
Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey
Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83
http://www.acd-insaat.com
DETAILED PROJECT DESCRIPTION
Project Name:
Kırsehir / Mucur Compressor Station Construction Project
Project Location:
Kırsehir / Turkey
Client:
BOTAS / Turkerler Insaat A.S.
Project Start Date (month/year):
08/2011
Project Scope:
Completion Date (month/year):
On Going
Construction of Compressor Station with 2 Turbocompressor / Turbine Sets
Company Profile 19 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti.
Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey
Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83
http://www.acd-insaat.com
DETAILED PROJECT DESCRIPTION
Project Name:
Batı Raman & Raman Oil Field Development Project
Project Location:
Batman / Turkey
Client:
Turkish Petroleum Corporation (TPAO)
Project Start Date (month/year):
Completion Date (month/year):
09/2011
10/2012
Project Scope:
90 km Flowline (Steel, PE & Stainless) Construction, 12 each Manifold Construction
Company Profile 20 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti.
Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey
Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83
http://www.acd-insaat.com
DETAILED PROJECT DESCRIPTION
Project Name:
Extending Water Pipeline from Sherkozh Storage to Suli Quarter
Project Location:
Suleymaniah / Iraq
Client:
Pikaron - Zozik Joint Venture
Project Start Date (month/year):
Completion Date (month/year):
03/2010
02/2011
Project Scope:
48” - 17 km , 24” – 3 km Pipeline Construction
3 each Pump Station Construction
Company Profile 21 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti.
Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey
Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83
http://www.acd-insaat.com
DETAILED PROJECT DESCRIPTION
Project Name:
Oguz – Gabala – Baku Water Pipeline Project
Project Location:
Oguz – Gabala – Baku / Azerbaijan
Client:
Azersu (Project Owner) / HTG JV (Turan Haznedaroglu – Tekser – Gence Korpu Joint Venture)
Project Start Date (month/year):
Completion Date (month/year):
03/2008
06/2010
Project Scope:
80” - 47 km Pipeline Construction
Flow Control Chamber, Pressure Control Chamber & Pressure Break Chamber Construction
Company Profile 22 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti.
Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey
Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83
http://www.acd-insaat.com
DETAILED PROJECT DESCRIPTION
Project Name:
Sayda Province Natural Gas Pipeline Project
Project Location:
Sayda City / Algeria
Client:
Sarl Nafco – Sonelgaz
Project Start Date (month/year):
04/2008
Project Scope:
Completion Date (month/year):
08/2008
8” - 25 km Pipeline Construction
Company Profile 23 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti.
Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey
Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83
http://www.acd-insaat.com
DETAILED PROJECT DESCRIPTION
Project Name:
Kesikkopru Dam to Ankara Ivedik Treatment Plant Pipeline Project
Project Location:
Ivedik - Ankara / Turkey
Client:
ASKİ (Ankara Water and Sewage Administration)
Project Project Start Date (month/year):
Completion Date (month/year):
05/2007
04/2008
Project Scope:
64” - 30 km Pipeline Construction, Pump Station Construction
Company Profile 24 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti.
Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey
Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83
http://www.acd-insaat.com
DETAILED PROJECT DESCRIPTION
Project Name:
Baku – Tbilisi – Ceyhan (BTC) Crude Oil Pipeline Project
Project Location:
Baku - Azerbaijan
Client:
BP – BOTAS Consortium
Project Project Start Date (month/year):
05/2004
Project Scope:
Completion Date (month/year):
08/2005
42” - 430 km Pipeline Construction, 19 Block Valve Station, 2 Pumping Station, 1 Pigging Station,
2 Check Valve Station Construction
Company Profile 25 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti.
Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey
Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83
http://www.acd-insaat.com
DETAILED PROJECT DESCRIPTION
Project Name:
Cankırı – Gerede Natural Gas Pipeline Project
Project Location:
Gerede - Bolu / Turkey
Client:
BOTAS
Project Project Start Date (month/year):
08/2007
Project Scope:
Completion Date (month/year):
12/2007
24” - 33 km Pipeline Construction
Company Profile 26 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti.
Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey
Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83
http://www.acd-insaat.com
DETAILED PROJECT DESCRIPTION
Project Name:
Ankara - Kazan Water Pipeline Project
Project Location:
Kazan – Ankara / Turkey
Client:
ASKI (Ankara Water and Sewage Administration)
Project Project Start Date (month/year):
Completion Date (month/year):
03/2007
12/2007
Project Scope:
28” – 36” - 28 km Pipeline Construction
Company Profile 27 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti.
Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey
Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83
http://www.acd-insaat.com
DETAILED PROJECT DESCRIPTION
Project Name:
Ingaz High Pressure Natural Gas Pipeline
Project Location:
Inegol - Bursa / Turkey
Client:
Ingaz Inc.
Project Start Date (month/year):
01/2007
Project Scope:
8” – 2,5 km Pipeline Construction
Completion Date (month/year):
03/2007
Company Profile 28 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti.
Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey
Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83
http://www.acd-insaat.com
DETAILED PROJECT DESCRIPTION
Project Name:
Teksem Factory Natural Gas Conversion Works
Project Location:
Cerkezkoy - Corlu / Turkey
Client:
TEKSEM Inc.
Project Start Date (month/year):
Completion Date (month/year):
01/2007
03/2007
Project Scope:
Teksem Factory all natural gas conversion works.
Company Profile 29 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti.
Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey
Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83
http://www.acd-insaat.com
DETAILED PROJECT DESCRIPTION
Project Name:
Turkey – Greece Natural Gas Pipeline Project
Project Location:
Kesan / Turkey
Client:
BOTAS - Atilla Dogan Inc.
Project Start Date (month/year):
Completion Date (month/year):
12/2006
02/2007
Project Scope:
36” – Pipeline Critical Welding Works and Hot-taps
Company Profile 30 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti.
Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey
Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83
http://www.acd-insaat.com
DETAILED PROJECT DESCRIPTION
Project Name:
Aliaga Pigging Station - RMS Station Natural Gas Pipeline
Project Location:
Aliaga -Izmir / Turkey
Client:
BOTAS – Atilla Dogan Inc.
Project Start Date (month/year):
Completion Date (month/year):
09/2006
01/2007
Project Scope:
20” - 8 km Pipeline Construction
Company Profile 31 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti.
Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey
Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83
http://www.acd-insaat.com
DETAILED PROJECT DESCRIPTION
Project Name:
Yozgat Sugar Factory RMS Station
Project Location:
Bogazlıyan - Yozgat / Turkey
Client:
BOTAS, Kale Kalıp Inc.
Project Start Date (month/year):
Completion Date (month/year):
09/2006
10/2006
Project Scope:
20.000 Nm3/h Natural Gas RMS-A Station Construction
Company Profile 32 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti.
Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey
Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83
http://www.acd-insaat.com
DETAILED PROJECT DESCRIPTION
Project Name:
PETKIM - 40 MW Gas Turbines and 14” Natural Gas Pipeline Construction Project
Project Location:
Aliaga - Izmir / Turkey
Client:
Petkim – Tokar Inc.
Project Start Date (month/year):
Completion Date (month/year):
08/2006
12/2006
Project Scope:
Construction works for conversion of solid fuel to natural gas with turbine piping works.
Company Profile 33 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti.
Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey
Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83
http://www.acd-insaat.com
DETAILED PROJECT DESCRIPTION
Project Name:
Yumurtatepe - Seckoy Natural Gas Pipeline Project
Project Location:
Yumurtatepe - Seckoy – Bursa / Turkey
Client:
BOTAS – Atilla Dogan Inc.
Project Start Date (month/year):
Completion Date (month/year):
07/2006
12/2006
Project Scope:
24” - 13 km Pipeline Construction
Company Profile 34 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti.
Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey
Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83
http://www.acd-insaat.com
DETAILED PROJECT DESCRIPTION
Project Name:
CS-5 Eskisehir Natural Gas Compressor Station Cyclone Filter Installation
Project Location:
Eskisehir / Turkey
Client:
BOTAS
Project Start Date (month/year):
Completion Date (month/year):
07/2006
09/2006
Project Scope:
Revision of 16“ – 36” natural gas pipeline filters, additional cyclone filtering installation and
commissioning works.
Company Profile 35 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti.
Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey
Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83
http://www.acd-insaat.com
DETAILED PROJECT DESCRIPTION
Project Name:
Iran Natural Gas Pipeline Project
Project Location:
Ardahan / Turkey
Client:
BOTAS
Project Start Date (month/year):
03/2006
Completion Date (month/year):
05/2006
Project Scope:
Gas Distribution to Ardahan City and 48”x12” Hot -Tap Works
Company Profile 36 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti.
Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey
Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83
http://www.acd-insaat.com
DETAILED PROJECT DESCRIPTION
Project Name:
Botas Karacabey RMS Station Project
Project Location:
Karacabey – Bursa / Turkey
Client:
BOTAS, Kale Kalıp Inc.
Project Start Date (month/year):
Completion Date (month/year):
04/2006
05/2006
Project Scope:
50.000 Nm3/h Natural Gas RMS-A Station Construction
Company Profile 37 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti.
Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey
Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83
http://www.acd-insaat.com
DETAILED PROJECT DESCRIPTION
Project Name:
Botas M.K. Pasa RMS Station Project
Project Location:
M. K. Paşa – Bursa / Turkey
Client:
BOTAS, Kale Kalıp Inc.
Project Start Date (month/year):
Completion Date (month/year):
04/2006
05/2006
Project Scope:
60.000 Nm3/h Natural Gas RMS-A Station Construction
Company Profile 38 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti.
Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey
Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83
http://www.acd-insaat.com
DETAILED PROJECT DESCRIPTION
Project Name:
Botas Malatya OIZ RMS Station Project
Project Location:
Malatya / Turkey
Client:
BOTAS, Kale Kalıp Inc.
Project Start Date (month/year):
Completion Date (month/year):
04/2006
05/2006
Project Scope:
15.000 Nm3/h Natural Gas RMS-A Station Construction
Company Profile 39 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti.
Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey
Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83
http://www.acd-insaat.com
DETAILED PROJECT DESCRIPTION
Project Name:
Botas Kahramanmaras OIZ RMS Station Project
Project Location:
Kahramanmaras / Turkey
Client:
BOTAS, Kale Kalıp Inc.
Project Start Date (month/year):
Completion Date (month/year):
02/2006
03/2006
Project Scope:
75.000 Nm3/h Natural Gas RMS-A Station Construction
Company Profile 40 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti.
Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey
Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83
http://www.acd-insaat.com
DETAILED PROJECT DESCRIPTION
Project Name:
Botas Payas OIZ RMS Station Project
Project Location:
Payas – Iskenderun / Turkey
Client:
BOTAS, Kale Kalıp Inc.
Project Start Date (month/year):
Completion Date (month/year):
02/2006
03/2006
Project Scope:
20.000 Nm3/h Natural Gas RMS-A Station Construction
Company Profile 41 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti.
Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey
Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83
http://www.acd-insaat.com
DETAILED PROJECT DESCRIPTION
Project Name:
Botas Iskenderun OIZ RMS Station Project
Project Location:
Iskenderun / Turkey
Client:
BOTAS, Kale Kalıp Inc.
Project Start Date (month/year):
Completion Date (month/year):
01/2006
02/2006
Project Scope:
20.000 Nm3/h Natural Gas RMS-A Station Construction
Company Profile 42 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti.
Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey
Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83
http://www.acd-insaat.com
DETAILED PROJECT DESCRIPTION
Project Name:
Natural Gas Utility Pipeline Infrastructure Works for Kocaeli – Gebze IVth Istanbul Machinery and
Manufacturing Organized Industrial Zone
Project Location:
Gebze – Kocaeli / Turkey
Client:
Palgaz Inc.
Project Start Date (month/year):
01/2006
Project Scope:
Natural gas utility piping works.
Completion Date (month/year):
12/2006
Company Profile 43 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti.
Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey
Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83
http://www.acd-insaat.com
DETAILED PROJECT DESCRIPTION
Project Name:
Botas Mersin OIZ RMS Station Project
Project Location:
Mersin / Turkey
Client:
BOTAS, Kale Kalıp Inc.
Project Start Date (month/year):
10/2005
Completion Date (month/year):
11/2005
Project Scope:
20.000 Nm3/h Natural Gas RMS-A Station Construction
Company Profile 44 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti.
Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey
Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83
http://www.acd-insaat.com
DETAILED PROJECT DESCRIPTION
Project Name:
Botas Adana OIZ RMS Station Project
Project Location:
Adana / Turkey
Client:
BOTAS, Kale Kalıp Inc.
Project Start Date (month/year):
Completion Date (month/year):
10/2005
11/2005
Project Scope:
75.000 Nm3/h Natural Gas RMS-A Station Construction
Company Profile 45 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti.
Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey
Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83
http://www.acd-insaat.com
DETAILED PROJECT DESCRIPTION
Project Name:
Botas Baser Kimya OIZ RMS Station Project
Project Location:
Osmaniye / Turkey
Client:
BOTAS, Kale Kalıp Inc.
Project Start Date (month/year):
09/2005
Completion Date (month/year):
10/2005
Project Scope:
2.000 Nm3/h Natural Gas RMS-A Station Construction
Company Profile 46 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti.
Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey
Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83
http://www.acd-insaat.com
DETAILED PROJECT DESCRIPTION
Project Name:
Botas Gaziantep OIZ RMS Station Project
Project Location:
Gaziantep / Turkey
Client:
BOTAS, Kale Kalıp Inc.
Project Start Date (month/year):
08/2005
Completion Date (month/year):
10/2005
Project Scope:
150.000 Nm3/h Natural Gas RMS-A Station Construction
Company Profile 47 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti.
Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey
Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83
http://www.acd-insaat.com
DETAILED PROJECT DESCRIPTION
Project Name:
Botas Adana West RMS Station Project
Project Location:
Adana / Turkey
Client:
BOTAS, Kale Kalıp Inc.
Project Start Date (month/year):
Completion Date (month/year):
07/2005
08/2005
Project Scope:
50.000 Nm3/h Natural Gas RMS-A Station Construction
Company Profile 48 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti.
Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey
Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83
http://www.acd-insaat.com
DETAILED PROJECT DESCRIPTION
Project Name:
Botas Adana East RMS Station Project
Project Location:
Adana / Turkey
Client:
BOTAS, Kale Kalıp Inc.
Project Start Date (month/year):
Completion Date (month/year):
07/2005
08/2005
Project Scope:
40.000 Nm3/h Natural Gas RMS-A Station Construction
Company Profile 49 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti.
Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey
Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83
http://www.acd-insaat.com
DETAILED PROJECT DESCRIPTION
Project Name:
Botas Mersin City OIZ RMS Station Project
Project Location:
Mersin / Turkey
Client:
BOTAS, Kale Kalıp Inc.
Project Start Date (month/year):
Completion Date (month/year):
06/2005
08/2005
Project Scope:
150.000 Nm3/h Natural Gas RMS-A Station Construction
Company Profile 50 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti.
Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey
Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83
http://www.acd-insaat.com
DETAILED PROJECT DESCRIPTION
Project Name:
Ingaz Inegol RMS Station Project
Project Location:
Inegol - Bursa / Turkey
Client:
BOTAS, Kale Kalıp Inc.
Project Start Date (month/year):
Completion Date (month/year):
05/2006
06/2006
Project Scope:
50.000 Nm3/h Natural Gas RMS-A Station Construction
Company Profile 51 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti.
Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey
Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83
http://www.acd-insaat.com
DETAILED PROJECT DESCRIPTION
Project Name:
EGO Revision Works
Project Location:
Ankara / Turkey
Client:
EGO
Project Start Date (month/year):
Completion Date (month/year):
01/2005
01/2006
Project Scope:
Revision of 18 each Natural Gas RMS-A Station and Integration of Scada System
Company Profile 52 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti.
Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey
Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83
http://www.acd-insaat.com
DETAILED PROJECT DESCRIPTION
Project Name:
Blue Stream Pipeline Project (EGO – Ankara)
Project Location:
Ankara / Turkey
Client:
EGO
Project Start Date (month/year):
Completion Date (month/year):
12/2003
01/2004
Project Scope:
48” x 36” Hot-Tap Works and equipment installation
Company Profile 53 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti.
Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey
Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83
http://www.acd-insaat.com
DETAILED PROJECT DESCRIPTION
Project Name:
Aksaray - Mercedes Truck Factory Natural Gas Conversion Project
Project Location:
Aksaray / Turkey
Client:
Troya Limited Company
Project Start Date (month/year):
Completion Date (month/year):
03/2004
05/2004
Project Scope:
Mercedes Truck Factory all natural gas conversion works construction
Company Profile 54 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti.
Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey
Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83
http://www.acd-insaat.com
DETAILED PROJECT DESCRIPTION
Project Name:
TPIC (Turkish Petroleum Company) / Emity Oil - Natural Gas Distribution System
Project Location:
Corlu / Turkey
Client:
Troya Limited Company
Project Start Date (month/year):
Completion Date (month/year):
06/2004
06/2005
Project Scope:
Construction of Pipelines from Natural Gas Wells to the Factories at Corlu and Cerkezkoy Area,
4’’-6’’-8’’-10’’, 40 km Pipeline Construction
Company Profile 55 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti.
Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey
Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83
http://www.acd-insaat.com
DETAILED PROJECT DESCRIPTION
Project Name:
EGO Natural Gas Distribution System
Project Location:
Ankara / Turkey
Client:
EGO
Project Start Date (month/year):
Completion Date (month/year):
07/2002
12/2003
Project Scope:
36”-24”-18’’, 36 km Pipeline Construction, Compressor Station Construction
Company Profile 56 / 56

Benzer belgeler

firma adı salon stand dörtel otomotiv san.paz.tic.ltd

firma adı salon stand dörtel otomotiv san.paz.tic.ltd Chongqing Gallop Gear Co., Ltd. HUDSON-SELİM CEMAL ALEMDAR TEX MOTOSİKLET AKSESUARLARI VE GİYİM ÜRÜNLERİ-CENGİZ KELEŞ XIAMEN SONGLI IMPORT AND EXPORT CO.,LTD HANGZHOU JOYSHINE IMP.&EXP.CO.,LTD. HAR...

Detaylı