EMT İNŞAAT TURİZM SANAYİ VE TİCARET A.Ş.

Transkript

EMT İNŞAAT TURİZM SANAYİ VE TİCARET A.Ş.
EMT İNŞAAT TURİZM SANAYİ VE TİCARET A.Ş.
EMT CONSTRUCTION TOURISM INDUSTRY AND TRADE CO.
CONSTRUCTION TOURISM
INDUSTRY&TRADE CO.
Çetin Emeç Bulvarı 1322.Cad.(6. Cad.) 51/4
06460 A.Öveçler/ANKARA/TURKIYE
Tel : 0 312 472 62 72 (Pbx)–Fax: 0 312 472 90 20
EMT
EMT CONSTRUCTION TOURISM INDUSTRY&TRADE CO.
ESTABLISHMENT DATE
CAPITAL
BANK REFERENCES
ADDRESS
TELEPHONE
FAX
WEB
E-MAIL
: SEPTEMBER 1996
: 650.000,00 TRY
: YAPI VE KREDI BANKASI (BULVAR BRANCH)
HALK BANKASI (YUKARI AYRANCI BRANCH)
GARANTİ BANKASI (DİKMEN BRANCH)
FİNANSBANK (BALGAT BRANCH)
: ÇETN EMEÇ BULVARI 1322.CAD. NO:51/4
06460 A.ÖVEÇLER- ANKARA
: +90 (312) 472 62 72 (Pbx)
: +90 (312) 472 90 20
: www.emtinsaat.com.tr
: [email protected]
FIELDS OF ACTIVITIES:
BUILDING CONTRACTING AND CONSTRUCTIONS WORKS OF
ELECTRICAL AND ELECTRONIC SYSTEMS
* INFRASTRUCTURAL WORKS;
- CONSTRUCTION OF RUNWAY,APRON,TAX WAY
- CONSTRUCTION OF INTER AIRPORT ROADS
- CONSTRICTION OF HIGHWAYS
- CONSTRUCTION OF MILITARY HELIPAD FIELDS
- CONSTRUCTION OF WASTEWATER TREATMENTS PLANTS
* SUPERSTRUCTURAL CONSTRUCTION WORKS
- CONSTRUCTION OF AIRPORT TERMINAL (STATION) BUILDINGS
- CONSTRUCTION OF ACCIDENT INTERVENTION &FIRE FIGHTING BUILDINGS
- CONSTRUCTION OF PRIVATE BUILDINGS
- CONSTRUCTION OF MILITARY BUILDING FACILITIES
- CONSTRUCTION OF POWER SUPPLY STATIONS
* OTHER WORKS
- AGL WORKS OF AIRPORTS
- ELECTRICAL WORKS OF POWER STATIONS
- REMOTE CONTROL SYSTEMS
- BUILDING AUTOMATION SYSTEMS
- AIRPORT ELECTRONIC SYSTEMS
- AIR NAVIGATION SUPPLEMENTARY SYSTEMS (VOR, DME, NDB,ILS)
CONSTRUCTION TOURISM
INDUSTRY&TRADE CO.
Çetin Emeç Bulvarı 1322.Cad.(6. Cad.) 51/4
06460 A.Öveçler/ANKARA/TURKIYE
Tel : 0 312 472 62 72 (Pbx)–Fax: 0 312 472 90 20
EMT CONSTRUCTION
LIST OF KEY PERSONNEL
NAME AND SURNAME
Burhan DOĞAN
TITLE
Elect. Engineer
General Manager
Hasan DOĞAN
Administrative
Asistant of General Manager
Kuvvet SAZAK
Elect. Engineer
Coordinator
Yusuf ERDOĞAN
Civil Engineer
Coordinator
Alaattin KARAAĞAÇ
Financial Consultant
Dengin DOĞAN
Accounting Director
Mustafa ÇEVİK
Elect. Engineer
Cem KARAMAN
Surveying Engineer
Serol AYSAN
Mech.Engineer
Türker SÜMER
Architect
Mustafa ALPSAR
Civil Engineer
Mehmet Metin UĞUR
Civil Engineer
Süreyya YAMAN
Civil Engineer
Mustafa TÜRKMEN
Elect. Engineer
Yunus SARIKAYA
Civil Engineer
Ömer Faruk GÜMÜŞ
Civil Engineer
Tevfik REYHAN
Mech.Engineer
M.Egemen Sever
Civil Engineer
Önder ÖZDEMİR
Civil Engineer
Anıl DOĞAN
Mechatronic Engineer
Rafet BİRİNCİ
Surveying Engineer
Nuray BOZER
Accounting Official
Burak KOÇAK
Accounting Official
Erdal DOĞAN
Accounting Official
Ceyla KOÇ
Civil Technician
Yaşar ALICI
Formen
Timurçin ALICI
Formen
Emine KAHVECİ TOP
Secretary
Ali Çavuş DOĞANER
Accounting Official
Mehmet YÜCE
Driver
BANK
REFERENCES
EMT İNŞAAT TURİZM SANAYİ VE TİCARET A.Ş.
BALANCE SHEET FOR THE PERIOD OF 01.01.2010-31.12.2010
ASSETS
TL
39.695.197,05
3.379.803,63
1.329.543,94
2.050.259,69
0,00
771.538,61
264.939,87
70.421,04
190.755,08
245.422,62
2.204.588,70
2.204.588,70
0,00
32.059.718,03
USD
25.676.065,36 LIABILITIES
1-Contract Progress Costs
G-Prepaid Expenses and Income Accruals
H-Other Current Assets
1-Deferred VAT
4-Prepaid Taxes and Funds
5-Word Advances
6-Advances to Personnel
TOTAL CURRENT ASSEST
II-LONG TERM ASSETS
A-Trade Receivables
5-Deposits and Guarantees Given
B-Other Receivables
3-Due from subsidiaries
C-Financial Fixed Assets
D-Tangible Fixed Assets
1-Land
4-Plant, Machinery and Equipment
5-Motor Vehicles
6-Furniture and Fixtures
8-Accumulated Depreciation (-)
E-Intangible Assets
1-Righs
5-Special Cost
7-Accumulated Amortization (-)
8-Advances to Suppliers
F-Assets Subject to Amortization
G-Prepaid Expenses and Accrued Income
Revenue accruals
1-Prepaid Expenses for Future Years
H-Other Fixed Assets
5-Prepaid Expenses and Funds
TOTAL LONG TERM ASSETS
32.059.718,03
0,00
1.279.548,08
895.280,31
367.933,85
15.333,92
1.000,00
39.695.197,05
5.976.147,65
23.111,08
23.111,08
1.513.288,71
1.513.288,71
0,00
2.076.242,39
669.873,50
1.221.355,59
217.486,64
278.796,76
-311.270,10
1.360.691,58
15.636,91
164.259,67
-103.161,48
1.283.956,48
0,00
6.583,98
0,00
6.583,98
996.229,91
996.229,91
5.976.147,65
20.737.204,42
TOTAL ASSETS
45.671.344,70
29.541.620,12 LIABILITIES (SOURCES)
A-Liquid Assets
1-Cash
3-Banks
B-Marketable Securities
C-Trade Receivables
1-Customers
2-Notes Receivables
5-Deposits and Guarantees Given
7-Doubtful Trade Receivables
D-Other Receivables
5- Other Receivables
E-Inventories
F-Contract Progress Costs
TL
45.671.344,70
38.119.712,40
0,00
4.359.324,80
2.973.825,24
1.335.780,88
35.851,62
13.867,06
133.641,90
0,00
133.641,90
0,00
33.207.663,04
33.207.663,04
USD
29.541.620,12
F-Taxes Payable and Other Fiscal Liabilities
419.082,66
1-Taxes and Funds Payable
369.672,91
2-Social Security Withholdings Payable
49.409,75
G-Provisions for Liabilities and Expenses
0,00
1-Provisions for Income Taxes and Other Legal Liabilities on Profit ( 1.339.675,21
2-Prepaid Income Taxes and Other Legal Liabilities on Profit (-)
-1.339.675,21
H-Income Relating to Future Months and Expense Accruals
0,00
I-Other Short Term Liabilities
0,00
TOTAL SHORT TERM LIABILITIES
38.119.712,40
II-LONG TERM LIABILITIES
899.414,77
A-Financial Liabilities
0,00
B-Trade Payables
694.180,82
1-Suppliers
694.180,82
C-Other Liabilities
205.233,95
1-Due to Shareholders
205.233,95
D-Advances Received
0,00
E-Provisions for Debts Expenses
0,00
F-Income Relating to Future Periods and Expense Accruals
0,00
G-Other Long Term Liabilities
0,00
TOTAL LONG TERM LIABILITIES
899.414,77
III-SHAREHOLDERS EQUITY
6.652.217,53
A-Paid -In Capital
650.000,00
1-Capital
650.000,00
B-Capital Reserves
0,00
C-Profit Reserves
331.610,15
1-Legal Reserves
331.610,15
D-Retained Earnings
353.641,82
1-Retained Earnings
353.641,82
E-Losses From Previous Years (-)
0,00
F-Net Profit (Loss) For The Period
5.316.965,56
1-Net Profit of Period
5.316.965,56
TOTAL SHAREHOLDERS EQUITY
6.652.217,53
271.075,46
2.186.160,17 I-SHORT TERM LIABILITIES
859.989,61 A-Bank Loans
1.326.170,56
0,00
499.054,73
171.371,20
45.550,48
123.386,21
158.746,84
1.425.995,28
1.425.995,28
0,00
20.737.204,42
0,00
827.650,76
579.094,64
237.990,85
9.918,45
646,83
25.676.065,36
3.865.554,75
14.948,95
14.948,95
978.841,34
978.841,34
0,00
1.342.976,97
433.294,63
790.010,08
140.677,00
180.334,26
-201.339,00
880.136,86
10.114,43
106.248,17
-66.727,99
830.502,25
0,00
4.258,72
0,00
4.258,72
644.391,92
644.391,92
3.865.554,75
B-Trade Payables
1-Suppliers
2-Notes Payables
4-Deposits and Guarantees Received
5-Other Trade Payables
C-Other Liabilities
1-Due to Shareholders
4-Due to Personnel
D-Advances Received
E-Contract Progress Income
1-Contract Progress Income
LIABILITIES
45.671.344,70
24.656.993,79
0,00
2.819.744,37
1.923.560,96
864.023,86
23.189,92
8.969,64
86.443,66
0,00
86.443,66
0,00
21.479.730,30
21.479.730,30
239.115,72
31.959,73
0,00
866.542,83
-866.542,83
0,00
0,00
24.656.993,79
581.768,93
0,00
449.017,35
449.017,35
132.751,58
132.751,58
0,00
0,00
0,00
0,00
581.768,93
4.302.857,39
420.439,84
420.439,84
0,00
214.495,57
214.495,57
228.746,33
228.746,33
0,00
3.439.175,65
3.439.175,65
4.302.857,39
29.541.620,12
Some of the
Completion
CertIFICATES
REPUBLIC OF TURKEY
MINISTRY OF TRANSPORTATION, MARITIME AFFAIRS AND COMMUNICATIONS
General Directorate of Railways Ports and Airports Construction
ANKARA
Number: B.11.0.DLH.0.16.00.01/23065
Subject: Work Experience Certificate (Work Completion)
07/12/2011
WORK EXPERIENCE CERTIFICATE
(Contractor – Work Completion)
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
Owner of the Work
Name and tender registry
number, if any, of the Work
Place where the work has been
executed
Building Technique Applied
:
:
Name, surname or trade name of
the contractor
TR ID Number / Tax identification
No.
Partnership ratios if it is a
business partnership
First contract price
Total contract price
Amount of the work realized
Contract Date
If the contract was assigned
a. Assignment Date
b. Amount of the work on
assignment date
c. Amount of the work after the
assignment
Provisional acceptance/liquidation
or settlement date of the work
Amount of the document
:
Infrastructure Construction, Concrete-Covered PAT
Areas (Runway, Apron, Taxi route, Boundary Wire
Fence, Boundary Way, Runway Lighting System,
Boundary Lighting, Low Tension and Middle Tension
Electrical Works)
EMT İnş. Tur. San. ve Tic. A.Ş.
:
334 008 4722 Metropolitan Tax Office
:
--
:
:
:
:
TL 20,817,006.47
TL 24,978,999.48
TL 24,978,999.36
08.12.2009
:
:
-----
:
---
:
01.11.2011
:
TL 24,978,999.36
(Twenty four million nine hundred seventy eight
thousand nine hundred ninety nine lira thirty six kuruş)
:
:
General Directorate of DLH Construction
Construction of Iğdır Airport Infrastructure Supply and
Miscellaneous Works
Iğdır
This document was issued based on the petition of the contractor EMT İnş. Tur. San. ve Tic.
A.Ş. dated 22/11/2011 and number 02-12/BD-20011/054.
<signature and seal>
Erol ÇITAK
Deputy General Manager
On behalf of Minister
GENERAL DIRECTORATE OF
STATE AIRPORTS AUTHORITY
Department of Construction and Real Estate
December 20th, 2010
No
Subject
: B.11.2.DHM.0.80.03.00-755-(68945)-11805
: Business Experience Certificate
<SEAL>
BUSINESS EXPERIENCE CERTIFICATE
(Contractor – Work Completion)
1. Client (a)
2. Name of the Work and Tender
Registration Number, if any
3. Location of the Work
: General Directorate Of State Airports Authority
: Renovation of Runway-Apron-Taxiing Field of
Erzincan Airport
: Erzincan Airport
: Construction of Runways and Taxiways, Qualified
4. Applied Construction Technique Concrete, Hot Bituminous Mixture, Stone Mastik
(b)
Asphalt, Electrical Infrastructure and Lighting,
Underground Drainage
5. Name and Surname or Trade
: Joint Venture of EMT İnş.Turz-San.ve Tic.A.Ş. and
Name of the Contractor
YUMA İnş.Tic.ve San.Ltd.Şti.
6. T.R. Identity Number /
: Baskent Tax Administration 334 050 7485
Taxpayer Identification Number
7. If Joint Venture, Partners and
Partner Shares
EMT İnş.Turz.San.ve Tic.A.Ş. % 51
If Consortium, Partners and
YUMA İnş.Tic.ve San.Ltd. Şti. % 49
Realized Portions and Respective
(c)
Amounts
8. Initial Contract Value (ç)
: 21,279,726.15TL
(d)
9. Total Contract Value
: 25,535,671.38 TL
10. Realized Amount of Work (e)
: 25,335,671.38TL (Progress Payment No: 10)
11. Contract Date
: October 23rd, 2009
12. If the Contract is Transferred;
:-------------------(f)
a. Transfer Date (g)
b. Amount of Business at the
Date of Transfer (ğ)
c. Amount of Business after the
Date of Transfer (h)
13. provisional
acceptance/Settlement or Abode
Date of the Work (ı)
14. Certificate Amount
:-------------------:-------------------:-------------------August 25th, 2010 (Provisional Acceptance Date)
25,335,671.38TL (Progress Payment No: 10)
<signature>
Funda OCAK
Deputy General Manager
<signature>
Orhan BİRDAL
General Manager
<SEAL>
Konya Yolu 06330 Etiler /ANKARA, Contact to Salih GÜNAY Civil Technician for detailed information
Tel: (0 312) 204 23 17 Fax: (0 312) 212 22 06 e-mail: [email protected] Web: www.dhmi.gov.tr
REPUBLIC OF TURKEY
PRIME MINISTRY
HOUSING DEVELOPMENT ADMINISTRATION OF TURKEY
WORK EXPERIENCE CERTIFICATE
(Contractor - Work Completion)
25.05.2012 034408
Date: … / … / ……
Date: B.02.1.KNT.0.15.08.00/755.07.03[061402] - 2130
1. Employer
2. Name of the project and tender registration number,
if any
3. Location of the work performed
4. Construction technique applied
5. Name and surname or trade name of the contractor
6. Turkish ID No / Tax ID No
7. Partners and partnership shares for joint ventures,
partners and their performed portion and sum of work
for consortiums
8. Initial contract value
9. Total contract value
10. Amount of total performed work
11. Contract date
12. In case of contract assignment
a. Assignment date
b. Amount of work by the assignment date
c. Amount of work after the assignment date
13. Date deemed for provisional acceptance
14. Sum of the certificate
Republic Of Turkey, Prime Ministry, Housing
Development Administration Of Turkey
50-Bed Hospital Construction and Infrastructure and
Landscaping Project in ereflikoçhisar Ankara (Tender
Registration Number: 2009/ 143497)
Ankara
Conventional reinforced concrete framework
construction (Total Construction Area = 16,925 m²)
EMT . Tur. San. ve Tic. A. .
Ba kent Tax Office, Ankara - 334 008 4722
TL 11,996,386
(Eleven million nine hundred and ninety-six thousand
three hundred and eighty-six Turkish Liras)
TL 11,996,386
(Eleven million nine hundred and ninety-six thousand
three hundred and eighty-six Turkish Liras)
TL 11,292,268.94
(Eleven million two hundred and ninety-two thousand
two hundred and sixty-eight Turkish Liras and ninetyfour kurus)
14.01.2010
05.01.2012
TL 11,292,268.94 (94.13%)
(Eleven million two hundred and ninety-two thousand
two hundred and sixty-eight Turkish Liras and ninetyfour kurus)
{seal of Housing Development Administration Of Turkey}
HOUSING DEVELOPMENT ADMINISTRATION OF TURKEY
Mr. Ahmet Haluk KARABEL
Chairman
24.05.2012
{Signature}
Ms. Ay e ÇALKAN
Vice Chairman
24.05.2012
24.05.2012
24.05.2012
Specialist
Department Chief
Department Head
A. AKARCA
S. BALABAN
M. SOYLU
mza}
{ mza}
mza}
EMT CONSTRUCTION TOURISM INDUSTRY&TRADE CO.
LIST OF ONGOING PROJECTS
No:
Country
Employer
Name and Place of Work
Last payment
report total
Year
Subject of the Work
1
Turkiye
DHMİ Turkish Airports
Authority
Esenboga Airport
47.990.000,00 TL
2012
ESENBOGA Airport Apron and Rapid Exit Taxiway Construction
(SERA&EMT)
2
Turkiye
Bingöl Airport
11.444.786,18 TL
2010
BİNGÖL Airport Substructure Works and Various Construction
3
Turkiye
Kozan-Feke-Saimbeyli
21.269.807,14 TL
2009
KOZAN-FEKE-SAİMBEYLİ 6.böl.hb.road between km:48+80058+800 and between km:61+900-70+151g/66+56082+300
bridges,substructure and various contruction works
DLH Turkish
Ministry of
Transportation
General
Directorate
of Highways
5.th Division
EMT CONSTRUCTION TOURISM INDUSTRY&TRADE CO.
LIST OF COMPLETED PROJECTS
Country
Employer
Name and Place of Work
Last payment
report Total
Year
Subject of the Work
1
Turkiye
Republic of Turkiye
Prime Ministery
Housing Development
Administration
of Turkiye (TOKİ)
Ankara Şereflikoçhisar
11.996.386,00 TL
2010
Şereflikoçhisar wiıth 50 Beds Hospital Constructıon Infrastructure
and Landscapıng Ankara/TURKIYE
2
Turkiye
DLH Turkish Ministry
of Transportation
IĞDIR Airport
20.817.006,47 TL
2011
IĞDIR Airport Substructure Works and Various Constructİon
3
Turkiye
DLH Turkish Ministry
of Transportation
BALIKESİR Körfez Airport
24.737.482,56 TL
2011
BALIKESİR KÖRFEZ AIRPORT
Runway Construction and Other Substructure Works
4
Turkiye
DLH Turkish Ministry
of Transportation
MARDİN Airport
3.066.604,66 TL
2009
MARDİN AIRPORT Technical Building and ATC Building
Construction
5
Turkiye
DLH Turkish Ministry
of Transportation
ERZİNCAN Airport
21.279.726,00 TL
2009
ERZİNCAN AIRPORT
Renowation of Apron Areas
6
Turkiye
DHMİ Turkish
Airports Authority
MALATYA Airport
17.379.027,96 TL
2008
MALATYA AIRPORT New Runway Construction
7
Turkiye
TCDD Genel
Müdürlüğü
ESKİŞEHİR Hasanbeyli
17.639.000,00 TL
2008
ESKİŞEHİR HASANBEYLİ
Triage Station Construction
8
Turkiye
DLH Tturkısh
Mınıstry of
Transportatıon
ELAZIĞ Airport
5.185.462,89 TL
2008
ELAZIĞ AIRPORT Security Facilities Construction
9
Turkiye
DLH Turkish Ministry
of Transportation
ANTALYA
5.232.123,59 TL
2007
National Cost Guard Command Building Construction in ANTALYA
10
Turkiye
YUMA İnşaat Tic. ve
San. Ltd.Co.
MARDİN Airport
154.232,39 TL
2007
MARDİN AIRPORT Renovation and Expansion of Aprons AGL
Works
11
Turkiye
YUMA İnşaat Tic. ve
San. Ltd.Co.
VAN Airport
923.184,23 TL
2007
VAN AIRPORT Renovation and Expansion of Aprons and
Construction of Turn Pad
12
Turkiye
DHMİ Turkish
Airports Authority
SİNOP Airport
595.258,54 TL
2007
SİNOP AIRPORT Renovation of Aprons
13
Turkiye
Kazova İnşaat Tur.San.
ve Tic. Co.
GATA Hospital
820.000,00 TL
2006
The Electric Works of the Construction of Gata Camlıca Bakımevi
14
Turkiye
Doğusan Doğu Demir
Co.Ltd.
İZMİT NAVAL
1.225.000,00 TL
2006
İZMİT NAVAL Base Renovation of the Runway
15
Turkiye
DHMİ Turkish
Airports Authority
Kahramanmaraş Airport
889.570,00 TL
2006
KAHRAMANMARAŞ AIRPORT Enhancement of Airport Approach
Systems According to the ICAO Requirements
16
Turkiye
DHMİ Turkish
Airports Authority
Çanakkale Airport
344.400,00 TL
2006
ÇANAKKALE AIRPORT Renewal of Aprons and Runway Including
Airport Ground Lighting System
No:
DETAILS OF
CERTIFICATION
HELD
VeriQuality
CERTIFICATION
Conformity of management system of the mentioned establishment with the requirements of the
below stated standards has been supervised and approved by VERİCERT Belgelendirme ve
Gözetim Hizmetleri Ltd. Şti.
TS EN ISO 9001: 2008 QUALITY MANAGEMENT SYSTEMS
ESTABLISHMENT:
EMT İNŞAAT TURİZM SANAYİ VE TİCARET ANONİM ŞİRKETİ
Aşağı Öveçler Mahallesi Çetin Emeç Bulvarı 1322. Cadde No: 51/4 – Çankaya – ANKARA TÜRKİYE
Scope of management system
Construction, Road, Bridge Infrastructure and Superstructure, Construction Contracts. Electric
Works, Airport Buildings Works (Runway and Apron Works, Illumination, Thermal Building – Up,
Expansion Maintenance and Repair)
Sector Code: EA 28
This certification is valid as long as the establishment is in compliance with the certification and
supervision requirements of VERİCERT.
Document No
VQTR010158
First Certification Date
25.05.2010
Issuance Date
25.05.2010
Signature
Vericert Belgelendirme ve Gözetim Hizmetleri Ltd. Şti.
Acıbadem Cad. Tekin Sk. No: 24/13 Acıbadem Kadıköy / Istanbul Turkey
T. +90 216 325 2501 F. +90 216 325 7379
www.vericert.com.tr [email protected]
Valid Until
10.05.2013
VeriQuality
CERTIFICATION
Conformity of management system of the mentioned establishment with the requirements of the
below stated standards has been supervised and approved by VERİCERT Belgelendirme ve
Gözetim Hizmetleri Ltd. Şti.
TS EN ISO 14001: 2004 ENVIRONMENT MANAGEMENT SYSTEMS
ESTABLISHMENT:
EMT İNŞAAT TURİZM SANAYİ VE TİCARET ANONİM ŞİRKETİ
Aşağı Öveçler Mahallesi Çetin Emeç Bulvarı 1322. Cadde No: 51/4 – Çankaya – ANKARA TÜRKİYE
Scope of management system
Construction, Road, Bridge Infrastructure and Superstructure, Construction Contracts. Electric
Works, Airport Buildings Works (Runway and Apron Works, Illumination, Thermal Building – Up,
Expansion Maintenance and Repair)
Sector Code: EA 28
This certification is valid as long as the establishment is in compliance with the certification and
supervision requirements of VERİCERT.
Document No
VQTR020158
First Certification Date
25.05.2010
Issuance Date
25.05.2010
Signature
Vericert Belgelendirme ve Gözetim Hizmetleri Ltd. Şti.
Acıbadem Cad. Tekin Sk. No: 24/13 Acıbadem Kadıköy / Istanbul Turkey
T. +90 216 325 2501 F. +90 216 325 7379
www.vericert.com.tr [email protected]
Valid Until
10.05.2013
VeriQuality
CERTIFICATION
Conformity of management system of the mentioned establishment with the requirements of the
below stated standards has been supervised and approved by VERİCERT Belgelendirme ve
Gözetim Hizmetleri Ltd. Şti.
OHSAS 18001 OCCUPATİONAL HEALTH AND SAFETY MANAGEMENT SYSTEM
ESTABLISHMENT:
EMT İNŞAAT TURİZM SANAYİ VE TİCARET ANONİM ŞİRKETİ
Aşağı Öveçler Mahallesi Çetin Emeç Bulvarı 1322. Cadde No: 51/4 – Çankaya – ANKARA TÜRKİYE
Scope of management system
Construction, Road, Bridge Infrastructure and Superstructure, Construction Contracts. Electric
Works, Airport Buildings Works (Runway and Apron Works, Illumination, Thermal Building – Up,
Expansion Maintenance and Repair)
Sector Code: EA 28
This certification is valid as long as the establishment is in compliance with the certification and
supervision requirements of VERİCERT.
Document No
VQTR040158
First Certification Date
03.06.2010
Issuance Date
03.06.2010
Signature
Vericert Belgelendirme ve Gözetim Hizmetleri Ltd. Şti.
Acıbadem Cad. Tekin Sk. No: 24/13 Acıbadem Kadıköy / Istanbul Turkey
T. +90 216 325 2501 F. +90 216 325 7379
www.vericert.com.tr [email protected]
Valid Until
20.05.2013
ON-GOING
PROJECTS
ELAZIG
AIRPORT
COMPLETED
PROJECTS
ANKARA
S.KOCHISAR WITH
50 BEDS
CONSTRUCTION,
INFRASTRUCTURAL
AND LANDSCAPING
WORKS TURKIYE
MARDIN
AIRPORT
TECHNICAL
BUILDING AND
ATC BUILDING
CONSTRUCTION
ERZINCAN
AIRPORT
RENOVATION
OF
APRON AREAS
MALATYA
AIRPORT NEW
RUNWAY
CONSTRUCTION
BALIKESIR
KÖRFEZ
AIRPORT
RUNWAY
CONTRUCTION
AND OTHER
SUBSTRUCTURE
WORKS
ESKISEHIR
HASANBEYLI
TRIAGE
RAILWAY
STATION
CONSTRUCTION
NATIONAL
COST GUARD
COMMAND
BUILDING
CONSTRUCTION
IN
ANTALYA

Benzer belgeler

Replacement Parts List

Replacement Parts List IDS Decoder Controller Components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 68 ET...

Detaylı