englısh - Norm Makina

Transkript

englısh - Norm Makina
2015
ANKARA/TURKEY
NORM MAKİNA SAN. İNŞ. TİC.LTD.ŞTİ.
REFERANCE LIST
2015
COMPLETED WORKS
www.normmakina.com.tr
NORM MAKINA SAN. INS. TIC. LTD. STI.
GENERAL REFERENCE LIST
APRIL 2015
COMPLETED WORKS
1. YİBİTAŞ LAFARGE ORTA ANADOLU ÇİMENTO SAN. TİC. A.Ş. / 2002
Sivas Cement Plant
1.1. Revision of the electrostatic precipitator number I and II.
1.2. Fabrication and installation of the outlet pipe of the electrostatic
precipitator as well as the dismantling of the existing one.
1.3. Insulation works of the electrostatic precipitator.
2. VİCAT BAŞTAŞ BAŞKENT ÇİMENTO SAN. TİC. A.Ş. / 2002
Bastas Cement Plant
2.1. Clinker Cooler : Fabrication of the both fix and movable chassis
2.2. Fabrication of the fixation plate for crusher.
2.3. Lime Unit: Installation of the casette filter with the capacity of 5000 m3/h
as well as the piping works.
2.4. Packing Unit: Installation of the casette filter with the capacity of 1250
m3/h as well as the piping works.
2.5. Loesche Mill: Fabrication of the plates ( Hardox 400 )
2.6. Revision of the dust duct for cooling tower (Project, fabrication,
installation and dismantling of the existing one)
2.7. Lime quenching unit: Fabrication of the screw conveyor (Ø 500 mm)
3. VİCAT BAŞTAŞ BAŞKENT ÇİMENTO SAN. TİC. A.Ş. / 2003
Bastas Cement Plant
3.1. General revision works for clinker cooler.
3.2. Rotary Kiln Unit: reparation of the inlet seal
3.3. Rotary Kiln Unit: renovation of the outlet seal
Sayfa 1 / 26
4. OYAK ÜNYE ÇİMENTO SAN. TİC. A.Ş. / 2003
Unye Cement Plant
Fabrication and installation of the steel construction of the stock hall unit
5. SET ÇİMENTO SAN TİC A.Ş. / 2003
Trakya Cement Plant
General revision works for electrostatic precipitators for both clinker cooler
and raw mill.
6. BPB DOĞAN ALÇI FABRİKASI ( AYMAŞ A.Ş. ) / 2003
Hasanoglan Plaster Plant
Renovation work for the outlet seal ring of the rotary kiln number II.
7. IŞIKLAR ŞARAPÇILIK SAN. VE TİC. A.Ş. / 2003
Kalecik Plant
Fabrication and Installation works of the tanks for waste water treatment
facility.
8. BURSA ÇİMENTO FABRİKASI ( ÇİMTEK A.Ş. ) / 2003
Bursa Cement Plant
Revision works for the electrostatic precipitator of the clinker cooler.
9. DENİZLİ ÇİMENTO SAN. TİC. A.Ş. / 2003
Denizli Cement Plant
9.1. Fabrication, installation and insulation works for the hot gas line of the
cogeneration unit.
9.2. Revision works for the hoppers of the raw metarials and polyurethane
coating works (Electrostatic precipitator of the raw mill number 1 – 2 )
10. BPB DOĞAN ALÇI FABRİKASI / 2003
Hasanoglan Plaster Plant
Renovation of the outlet seal ring for the rotary kiln number I.
11. VİCAT – KONYA ÇİMENTO SAN. TİC A.Ş. / 2003
Konya Cement Plant
11.1. Fabrication of the buckets for the bucket elevator for the raw mill.
Sayfa 2 / 26
11.2. Fabrication of the kiln shell (Ø 4200x825 outlet side) for the rotary kiln
number II as well as the replacement of it.
12. YİBİTAŞ LAFARGE ORTA ANADOLU ÇİMENTO SAN. TİC.A. Ş. /2003
Corum Cement Plant
Revision of the kiln shell of the rotary kiln.
13. AŞKALE ÇİMENTO SAN. TİC. A.Ş. / 2003
Askale Cement Plant
13.1. Fabrication of the chair pad and support plates for the tyre of the rotary
kiln.
13.2. Fabrication of the caterpillar of the pan conveyor for the coal feeding
13.3. Fabrication of the bucket for the Loesche return elevator
14. OYAK – ELAZIĞ ALTINOVA ÇİM. SAN. TİC. A.Ş. ( DAL TEKNİK ) / 2003 - 2004
Elazıg Cement Plant
14.1. Erection of the rotary kiln ( KHD Ø 4,0x59 mt. )
14.2. Fabrication of the whole local equipments like cyclones, inlet chamber
dust ducts e.t.c. located on preheater tower and installation of them as well.
Weight of fabrication works: 650 ton
Weight of erection works: 1200 ton
15. NUH ÇİMENTO SAN. A.Ş. ( GÜLERMAK ) / 2004
Nuh Cement Plant
Erection of the rotary kiln number III. ( FLS Ø 5,5x66 mt )
Weight of erection works: 1100 ton
16. BPB GYPSUM ÜRETİM VE TİC. LTD. ŞTİ. / 2004
Hasanoglan Plaster Plant
Dust sealing works for the screw conveyors, belt conveyors, cyclones and
pipe lines for the perlite unit.
17. ADO ÇİMENTO SAN. TİC. A.Ş. / 2004-2005
Kızılkaya Cement Plant
I. Clinker Production Line
17.1. Maintenance and erection of the rotary kiln together with it’s all
equipments ( Polysius Ø 4,2x60 mt. )
Sayfa 3 / 26
17.2. Installation of the coal mill unit and fabrication of the local equipments
(PFEIFFER )
17.3. Installation of the Clinker cooler unit and fabrication of the local
equipments ( IKN )
Weight of the local fabrication works: 650 ton
Weight of the erection works: 1350 ton
18. BETONSAN – BETON VE ÇİMENTO SAN. A.Ş. / 2005
Lalahan Cement Grinding Facility.
Alignment works for the gear box and bearings of the Cement mill
19. VİCAT – KONYA ÇİMENTO SAN. A.Ş. / 2005
Konya Cement Plant
Both Fabrication and installation works for the raw metarial feeding line of the
Raw mill.
Weight of the local fabrication works: 350 ton
Weight of the erection works: 600 ton
20. DENİZLİ ÇİMENTO SAN.TİC. A.Ş. / 2005
Denizli Cement Plant
20.1. Revision of the ESP number II( Changing of the discharge electrodes,
maintenace of the hammers e.t.c.)
20.2. Replacement of the light kiln shell, heavy kiln shell with tyre, rollers and
adjustment of the gear and drive unit for the rotary kiln number II.
21. ÇİMENTAŞ KARS ÇİMENTO SAN. TİC. A.Ş. / 2005
Kars Cement Plant
General revision works for clinker cooler, crusher, raw and coal mill e.t.c.
22. ÇİMSA ÇİMENTO SAN. TİC. A.Ş. / 2005
Kayseri Cement Plant
Erection of the Rotary Kiln ( FLS Ø 3,6x55 mt. )
23. İZAYDAŞ İZMİT ATIK VE ARTIKLARI DEĞERLENDİRME A.Ş. / 2005
Revision of the rotary kiln. ( Ø 4,2x12 mt. )
Sayfa 4 / 26
24. ADO ÇİMENTO SAN. A.Ş. / 2005
Antalya Cement Grinding Facility
Replacement of gears for the gearbox of the cement.
25. DENİZLİ ÇİMENTO SAN. TİC. A.Ş. ( TİMSAN A.Ş. ) / 2005-2006
Denizli Cement Plant
Fabrication of the local equipments for the clinker stock hall with the capacity
of 90.000 ton and installation of them.
26. SANKO – ÇİMKO ÇİMENTO VE BETON SAN. TİC. A.Ş. / 2005 - 2006
Adıyaman Cement Plant
Erection and fabrication works of the cement mill unit.( UDCM / Ø 3,8x13 )
Weight of the local fabrication worksi: 1050 ton
Weight of the Installation works: 1500 ton
27. VİCAT BAŞTAŞ BAŞKENT ÇİMENTO SAN. TİC. A.Ş. / 2006
Bastas Cement Plant
27.1. Maintenance works for the clinker cooler
27.2. Maintenance works for the stacker and reclaimer
28. TÜRKERLER İNŞ. TURİZM MADENCİLİK TİC. SAN. A.Ş. / 2006
Ladik Cement Plant
Fabrication of the inlet gas duct of the electrostatic precipitator as weel as the
expansion joint.
29. AS ÇİMENTO SAN. TİC. A.Ş. / 2006
Kızılkaya Cement Plant - LM 56.3+3.
Fabrication and installation works for Loesche cement mill unit ( 210 ton/h
Weight of the local fabrication worksi: 440 ton
Weight of the Installation works: 1228 ton
30. YİBİTAŞ LAFARGE ORTA ANADOLU ÇİMENTO SAN.TİC.A.Ş. /2007
Corum Cement Plant
Fabrication and installation works for the modification works of the clinker
cooler.
Weight of the local fabrication works
: 35 ton
Weight of the erection works
: 90 ton
Sayfa 5 / 26
31. OYAK – MARDİN ÇİMENTO SAN. TİC. A.Ş. (DAL TEKNİK)/ 2007
Mardin Cement Plant
31.1. Erection of the Rotary Kiln Unit ( HUMBOLDT Ø 4,33x65 mt. )
31.2.Fabrication of the cyclones located on preheater tower ( OMAG )
Weight of the local fabrication works: 550 ton
Weight of the erection works: 900 ton
32. OYAK BOLU ÇİMENTO SAN. A.Ş. / 2007
Saraykoy Grinding Facility.
Replacement of the trunnion for cement mill
33. VİCAT KONYA ÇİMENTO SAN. A.Ş. / 2007
Konya Cement Plant
Fabrication and replacement of the beams for the raw mill(Loesche LM 45-4 )
34. VİCAT – KONYA ÇİMENTO SAN. A.Ş. ( 2006 – 2007 )
Konya Cement Plant
Installation of the cement mill unit (FCB – Horomill 2 Ø 3800 )
Weight of the local fabrication works: 1200 ton
Weight of the erection works: 2100 ton
35. SANKO – ÇİMKO ÇİMENTO FABRİKASI ( EKON – PROKON ). / 2007
Kahramanmaras Cement Plant
35.1. Installation of the rotary kiln unit.( Polysius Ø 5,6x87 mt )
35.2. Installation of the raw mill. (Polysius RM 51 / 26 ) ( 3 units )
35.3. Installation of the coal mill unit (Polysius RMK 25 / 12) ( 2 Units )
35.4. Installation of the other equipments Fans / Elevators
Weight of the erection works : 5500 ton
36. AS ÇİMENTO SAN. TİC. A.Ş. / 2007
Kızılkaya Cement Plant
Replacement of the kiln shell for rotary kiln number I (PolysiusØ 4,0 x60 mt.)
Sayfa 6 / 26
37. VİCAT BAŞTAŞ BAŞKENT ÇİMENTO SAN. TİC. A.Ş. / 2007
Bastas Cement Plant
Replacement of the seperator of the raw mill named Loesche LM 45-4 and
some revision works.
38. ÇİMSA ÇİMENTO SAN. TİC. A.Ş. / 2007 - 2008
Eskisehir Cement Plant
38.1. Erection of the rotary kiln unit (FLS Ø 3,6x55 mt )
38.2. Erection of the Clinker cooler unit ( FLS )
38.3. Erection of the electrostatic presipitator fort he Clinker cooler ( FLS )
38.4. Erection of the clinker transport lines.
Total weight of the erection works: 1600 ton
39. AS ÇİMENTO SAN. VE TİC. A.Ş. / 2007 - 2008
Kızılkaya Cement Plant
Clinker production line number II
39.1. Erection of the raw mill unit and local fabrication works ( PFEIFFER
AG / MPS 5300 )
39.2. Erection of the coal mill unit and local fabrication works ( PFEIFFER AG
/ MPS 3070 )
39.3. Erection of the rotary kiln unit. (CITIC Ø 5,6x87 mt. )
39.4. Erection of the clinker cooler unit ( IKN )
Weight of the local fabrication works
: 2100 ton
Weight of the erection works
: 5050 ton
40. VİCAT – KONYA ÇİMENTO SAN. A.Ş. / 2008
Konya Cement Plant
Replacement work of the casing of the cement mill number I ( FCB – Horomill
1 Ø 3800mm )
41. AS ÇİMENTO SAN. TİC. A.Ş./ 2008
Kızılkaya Cement Plant.
Erection of the Clinker silo with the capacity of 30000 ton and local
fabrication works
Weight of the local fabrication works: 1200 ton
Weight of the erection works: 2200 ton
Sayfa 7 / 26
42. KİPAŞ KAHRAMANMARAŞ ÇİMENTO SAN. TİC. A.Ş.(SARHAN)/ 2008
Kahramanmaras Cement Plant
Clinker production line number 1.
42.1. Erection of the rotary kiln unit. ( KHD Ø 4,6x54 mt. )
42.2. Erection of the clinker cooler unit and transport line. (KHD – Pyrofloor )
42.3. Erection of the raw mill. ( PFEIFFER AG / MPS 4500 )
Total weight of the erection works : 2400 ton
43. ÇİMSA ÇİMENTO SAN. TİC. A.Ş. / 2008
Eskisehir Cement Plant
43.1. Local fabrication ,dismantling and installation works for the
modernization of the coal transportation system of the clinker production line.
43.2. Replacement of the impeller of the ID fan.
43.3. Replacement of the impeller of the fan for the electrostatic presipitator
of the raw mill.
44. SET ÇİMENTO SAN. TİC.A. Ş / 2008
Balıkesir Cement Plant
Replacement of the heavy kiln shell with tyre and rollers.
(HUMBOLDT - Ø 3.6 x 54 mt.)
45. LAFARGE VAN ÇİMENTO A.Ş./ 2008
Van Cement Plant
Fabrication of the light and heavy kiln shell ( Ø 3,6 x 11 mt. )
46. SET ÇİMENTO SAN. TİC.A. Ş / 2008
Ankara Cement Plant
Replacement of the kiln shell for the rotary kiln number 3 and some revision
works ( FCB- Ø 4,4 x 64 mt. )
Fabrication of the cyclone for the hot gas line of the coal mill and installation.
47. CİMPOR ÇORUM ÇİMENTO SAN. TİC. A.Ş. /2008
Corum Cement Plant
Replacement of the casing of the mill number III ( KHD / Ø 2,2 x 13 mt )
Sayfa 8 / 26
48. NUH ÇİMENTO SAN. A.Ş. (ANDRİTZ) / 2008-2009
Nuh Cement Plant
Solid waste disposal facility (sludge drying)
Both fabrication and installation of some equipments.
49. AS ÇİMENTO SAN. TİC. A.Ş./ 2008-2009
Kızılkaya Cement Plant
Erection of the raw mill unit. ( Hefei – HRM / 3700 E )
Total weight of the erection works: 350 ton.
50. VİCAT BAŞTAŞ BAŞKENT ÇİMENTO SAN. TİC. A.Ş. / 2008-2009
Bastas Cement Plant
Solid waste burnning and stocking facility
Weight of the local fabrication works: 168 ton
Weight of the erection works: 225 ton
51. ETİ ALUMİNYUM A.Ş / 2009
Seydisehir Aluminium Facilities
Revision of the rotary kiln number II (Rus / Ø 3,6 x 75 mt. )
Fabrication of the chair pad for the tyre
52. BETA MAKİNA / 2009
Ankara gendarmes sewing workshops
Erection of the steel construction - 265 ton
53. CİMPOR YOZGAT ÇİMENTO SAN. TİC. A.Ş. /2009
Yozgat Cement Plant
Replacement of the casing and impeller of the fan for raw mill.
54. CİMPOR SİVAS ÇİMENTO SAN. TİC. A.Ş. /2009
Sivas Cement Plant
1.Fabrication of the structure holding the burner pipe of the rotary kiln and
replacement of the burner pipe.
2. Replacement of the trunnion of the raw mill.
Sayfa 9 / 26
55. SURİYE TARTOUS ÇİMENTO FABRİKASI / 2009
Replacement of the heavy kiln shell with tyre and rollers and adjustment of
the gear. ( Ø 4,6 * 69 mt )
56. AS ÇİMENTO SAN. VE TİC. A.Ş. / 2009
Kızılkaya Cement Plant
Revision works for clinker silo.
Revision works for Rotary kiln line 1
Installation of the packing unit.
Revision of the elevator for tras dryer.
Fabrication of the screw conveyors under the filter. ( 60 ton/h – 5 units )
Fabrication of the chair pad for the tyre of the rotary kiln.
Fabrication of the driver and carrier shafts for crusher.
Erection of the Mass machine cement cooler unit
57. VİCAT BAŞTAŞ BAŞKENT ÇİM. SAN. VE TİC. A.Ş. / 2009
Bastas Cement Plant
Fabrication of the beams for Loesche mill
Fabrication of the discahrge chute
Fabrication rotary valve for waste burnning facility.
Replacement of the valves at the waste burnning facility
Fabrication of the upper pulley of the elevator for the cement mills number 1
and 2.
58. OYAK BOLU ÇİMENTO SAN. A.Ş. / 2009
Ankara Grinding Facility.
Fabrication of the bucket for packing unit. (400mm-500mm-630mm)
59. SET ÇİMENTO SAN. VE TİC. A.Ş. / 2009
Balıkesir Cement Plant
General revision work for the clinker cooler. ( IKN ) Fabrication and erection
works.
Modification works for the bag filter with the capacity of 15.000 m2/h
Insulation works for the hot gas pipe.
Sayfa 10 / 26
60. ÇİMKO ÇİMENTO VE BETON SAN. A.Ş. / 2009
Kahramanmaras Cement Plant
Fabrication works for the pan conveyor number L11.01.01 and L11.01.02
Measuring works for rotary kiln
Revision of the inlet seal for the rotary kiln.
Revision of the electrostatic presipitator for klinker cooler.
Fabrication of the expansion joint for cooling tower. ( Ø3020*1260 )
Execution of the cement transport line( Project, fabrication ,installation )
Execution of the elevator for the cement transportation and it’s tower ( 200
t/h, 28 mt – Project ,fabrication ,installation)
Fabrication of the outlet kiln shell of the rotary kiln ( Ø5500*1450mm )
Replacement of the burner pipe.
Fabrication of the air-slide ( 630 mm )
Replacement of the rotor for crusher.
Replacement of the sleeve of the raw mill
61. CİMPOR ÇORUM ÇİMENTO SAN. TİC. A.Ş. /2009
Corum Cement Plant
Replacement of the cement ball mill shell (3,8*13mt)
Fabrication and installation of the base frame of the gearbox and motor of the
Raw mill. ( KHD / Ø 2,2 x 13 mt. )
Cold Measuring the alignment of the Rotary Kiln
Replacement of the chair pad under the tyre of the rotary kiln.
62. VİCAT – KONYA ÇİMENTO SAN. A.Ş. / 2009-2010
Konya Cement Plant
Fabrication and replacement of the outlet kiln shell of the rotary kiln number II
( Ø 4200x825 mm. )
63. AŞKALE ÇİMENTO SAN. TİC. A.Ş. /2009
Trabzon Cement Plant
Fabrication of the beam under the rail for the overhead crane in the stockhall.
Fabrication of the pulley of the cooling ventilator
Fabrication of the seperation valve for air-slide ( 300mm. 2 units)
Fabrication of the casing and buckets of the Aumund elevator (5 units )
Fabrication of the ventilator pulley of the elevator number 3
Sayfa 11 / 26
64. SET ÇİMENTO SAN. TİC.A. Ş /2009-2010
Pınarhisar Cement Plant
Extension of the lenght of the precalcination for the rotary kiln number II.
( Project-Fabrication-Erection )
65. DENİZLİ ÇİMENTO SAN. TİC. A.Ş. / 2010
Denizli Cement Plant
Modification works for the cyclone DF1 SO4
Fabrication and installation works for the hot gas duct between cogeneration
and raw mill number 3
66. AS ÇİMENTO SAN. TİC. A.Ş. / 2010
Kızılkaya Cement Plant
Replacement of the outlet trunnion of the cement mill number II and
adjustment of the drive unit.
Installation of the rotary scale for the packing unit number IV
Fabrication and installation works of the steel silo and transport lines
( 1500 ton )
Fabrication and installation works of the steel silo and transport lines
( 1000 ton )
Revision of the gearbox of the raw mill number MPS 5300
Revision of the rotary kiln number 2 and replacement of the burner pipe of
the rotary kiln
67. AŞKALE ÇİMENTO SAN. TİC. A.Ş. / 2010
Askale Cement Plant.
Fabrication of the casing of the crusher of the trass
Fabrication of the weighing hopper of raw mill.
Fabrication of the casing of the crusher for the rotary kiln number II.
68. SANKO – ÇİMKO ÇİMENTO FABRİKASI / 2010
Kahramanmaras Cement Plant
Fabrication of the outlet kiln shell of the rotary kiln ( Ø 5.6 x 1.45 mt. )
Fabrication of the slide gate valve ( DN 800 )
Fabrication of the retaining ring for rotary kiln
Fabrication of the protector for switch
Revision works for the clinker production line.
Sayfa 12 / 26
Belt conveyor ( 200T/h - 3 unit )(project, fabrication, installation)
Fabrication of the seperation valve for air slide ( 315 mm. )
Fabrication of the valves for the feeding pipes in preheater tower.
Fabrication of the sealing and extension parts of the tertiary air duct.
Replacement of the louvres of the seperators for the cement mills number I.II.
III.
Execution of the overhead cranes and bridges ( 20 Ton, 2Ton, 1Ton )
( Project , fabrication, installation )
Various steel and platform works (55 Ton)
Various steel and platform works (36 Ton)
Fabrication of the casing of the air slide ( 315 mm. )
Cement transportation line and bridges for the air slides
69. OYAK – MARDİN ÇİMENTO SAN. TİC. A.Ş. / 2010
Mardin Cement Plant
Revision of the rotary kiln number I and replacment of the kiln shell and tyre
Revision of the elektrostatic presipitator for raw mill, replacement of the
collecting and discharge electrodes.
General revision works for preheater tower
Fabrication of the chair pad for rotary kilns number I.and II.
Fabrication of the base frame for the ventilator of the gas of chimney.
70. VİCAT – KONYA ÇİMENTO SAN. A.Ş. / 2010
Konya Cement Plant
Revision of the electrostatic precipitator for raw mill. ( Redecam).
Fabrication of the casing of the gear box for the overhead crane.
71. ÇİMSA ÇİMENTO SAN. TİC. A.Ş. / 2010
Mersin Cement Plant
Adjustment of the drive unit and gear of the rotary ( FLS - Ø 5.5 x 87 mt. )
72. SET ÇİMENTO SAN. TİC.A. Ş / 2010
Ambarlı Cement Grinding and packing Facility
Revision of the cement mills number I. and II.
Sayfa 13 / 26
73. SET ÇİMENTO SAN. TİC.A. Ş / 2010
Pınarhisar Cement Plant
Revision of the rotary kiln number II. ( Replacement of the heavy kiln shell
together with tyre )
Revision of the IHI raw mill and replacement of the rotor of the seperator 2.
Manufacturing and installation of Cement Mill body outlet side (Ø 3,8*11 mt)
Replacement of the outlet bearing of the cement mill number 2
SET ÇİMENTO SAN. TİC.A. Ş / 2010
Ankara Cement Plant
Fabrication and installation of the hot gas pipe of the clinker cooler for the
rotary kiln number 3
74. CİMPOR ÇORUM ÇİMENTO SAN. TİC. A.Ş. / 2010
Corum Cement Plant
Revision of the rotary kiln
75. CİMPOR YOZGAT ÇİMENTO SAN. TİC. A.Ş. / 2010
Yozgat Cement Plant
General modification works for clinker cooler unit ( Fabrication and
installation of the both fix and movable frames e.t.c.)
76. OYAK BOLU ÇİMENTO SAN. TİC. A.Ş. / 2010
Eregli Cement Grinding Facility – Loesche LM 53. 3+3
Local fabrication and installation works for the grinding
Weight of the local fabrication works: 400 ton
Weight of the installation works.
: 1350 ton
77. VİCAT-KONYA ÇİMENTO SAN.A.Ş. – 2010
Konya Cement Plant
Fabrication and installation works for the clinker transporatation system
Weight of the local fabrication works: 142 ton
Weight of the installation works: 215 ton
Sayfa 14 / 26
78. RENAİSSANCE CONSTRUKSİON / RUSYA.
2010 / 2011 – ( NORM-CCM )
Verhnebakansky Cement Plant -6200 Tpd.
6200 Tpd. Fabrication and Installation Works For The Complete Cement
Production Line
Raw mill feeding
Erection of the electrostatic presipitator for raw mill
Installation of the equipments located on the preheater tower
Installation of the rotary kiln unit
Installation of the clinker cooler unit and electrostatic presipitator
Fabrication of the cyclones and gas ducts ( 2250 ton )
79. SET ÇİMENTO SAN. TİC.A. Ş / 2010
Ankara Cement Plant
Revision of the rotary kiln number II ( Ø 4.2*60 )
Replacement of the heavy kiln shell together with tyre
80. OYAK – MARDİN ÇİMENTO SAN. TİC. A.Ş. / 2010
Mardin Cement Plant
Fabrication of the chair pad and support plates for tyre.
81. ÇİMSA ÇİMENTO SAN.VE TİC.A.Ş. / 2010-2011
Eskisehir Cement Plant
Extension of the calcination in facility I.
Fabrication works:
Installation works:
425 ton
380 ton
Dismounting works: 106 ton
82. VİCAT-KONYA ÇİMENTO SAN.A.Ş. / 2010-2011
Konya Cement Plant
Both fabrication and installation of the beams for Loesche raw mill
83. SANKO – ÇİMKO ÇİMENTO FABRİKASI / 2010-2011
Kahramanmaras Cement Plant
Fabrication of the guillotine valve with actuator
(2440*2440mm) - 3 units
(1700*1200mm) - 4 units
(P200 *300mm )- 4 units
Sayfa 15 / 26
84. ÇİMSA ÇİMENTO SAN.VE TİC.A.Ş. / 2010-2011
Mersin Cement Plant
Replacement of the kiln shell on which Girth Gear is located ( FLS Ø
5.2*6mt. )
85. VİCAT-KONYA ÇİMENTO SAN.A.Ş. / 2010-2011
Konya Cement Plant.
Fabrication and replacement of the heavy kiln shell together with tyre and
also fabrication and installation of the inlet and outlet section of the rotary kiln
number I (KHD – 4.2mt. )
86. ÇİMSA ÇİMENTO SAN.VE TİC.A.Ş. / 2010-2011
Eskisehir Cement Plant
Replacement of the heavy kiln shell inlet and outlet side together with
tyre. ( MİAG - Ø 3.6mt)
87. OYAK BOLU ÇİMENTO SAN. TİC. A.Ş. / 2011
Eregli Cemnet Grinding Facility.
Execution of the cement silo with the capacity of 550 ton (2 units)
88. CİMPOR ANKARA ÇİMENTO SAN. TİC. A.Ş. / 2011
Ankara Hasanoglan Cement Plant
Replacement of the burner pipe of the rotary kiln.
89. CİMPOR YOZGAT ÇİMENTO SAN. TİC. A.Ş. / 2011
Yozgat Cement Plant
Replacement of the burner pipe of the rotary kiln
90. AŞKALE ÇİMENTO SAN. TİC. A.Ş. / 2011
Askale Cement Plant
Revision of the raw mill.
Revision of the rotary kiln and preheater tower.
Replacement of the beams and maintenace works for the clinker stock
hall.
Sayfa 16 / 26
91. SANKO – ÇİMKO ÇİMENTO FABRİKASI / 2011
Kahramanmaras Cement Plant
Dismounting ,maintenance and installation of the gear box of the raw mii
number 3.
Replacement of the fans for clinker cooler.
Replacement of the gear of the main drive of the rotary kiln
92. VİCAT-KONYA ÇİMENTO SAN.A.Ş. / 2011
Konya Cement Plant
Execution of the 150 m3 coal silo (Project, Fabrication and installation)
Weight of the fabrication works:
125 ton
Weight of the installation works:
140 ton
Weight of the dismounting works: 10 ton
93. ÇİMSA ÇİMENTO SAN.VE TİC.A.Ş. / 2011
Eskisehir Cement Plant
Installation of the HOT DISK REACTOR for the facility number 2 and
fabrication of some equipment for this Project.
Weight of the fabrication works
:
115... ton
Weight of the installation works
:
360... ton
Weight of the dismounting works :
120… ton
94. ÇİMSA ÇİMENTO SAN.VE TİC.A.Ş. / 2011
Nigde Cement Plant
Revision of the rotary kiln. ( KHD - Ø 3.8*54mt.)
95. OYAK BOLU ÇİMENTO SAN. TİC. A.Ş. / 2012
Bolu Cement Plant
Revision of the rotary kiln
( Ø 4.6*64mt- KHD )
Replacement of the both tertiary air duct and kiln hood
Replacement of the outlet part of the rotary kiln, outlet side tyre and
rollers.
Adjustment of the girth gear
Maintenance of the cyclones in the preheater tower
Dismounting of the cyclones number O1 and V1 and installation of the
new ones.
Sayfa 17 / 26
97.
BEUMER MaschienenfabrikGMBH.- 2012
Fabrication of the various kind of elevator casing-160 ton
98.
CİMPOR SİVAS ÇİMENTO SAN. TİC. A.Ş. / 2012
Sivas Cement Plant
Replacement of the burner pipe of the rotary kiln
99. RENAİSSANCE CONSTRÜKSİYON / RUSYA.
2012 / 2013 – ( NORM-CCM )
Sebryakov Cement Plant - Mihailovka.
Fabrication and installation of the clinker production line (4000 Tpd. )
Site Fabrication
Fabrication of the cyclones and ducts – 1250 ton
Workshop Fabrication
Fabrication of the some equipments in our workshop located on AnkaraTURKEY ( Light kiln sections of the rotary kiln ,stacker-reclaimer,Apron conveyor,belt
conveyors ) - 600 ton
Erection
Erection of the raw mill unit.
Erection of the equipments in preheater tower
Erection of the rotary kiln unit
Erection of the clinker cooler unit and electrostatic precipitator for clinker
cooler.
Erection of the electrostatic precipitator for raw mill.
100. RENAİSSANCE CONSTRÜKSİYON / RUSYA.
2012 / 2013 – ( NORM-CCM )
Novocement Cement Plant-Novorosisky.
Installation of the some units for clinker production line ( 4000 Tpd. )
Total weight of the installation : 3000 ton.
101. KİPAŞ KAHRAMANMARAŞ ÇİMENTO SAN. TİC. A.Ş./ 2012/2013/2014
Kahramanmaras Cement Plant
Fabrication and installation works for the clinker production line
number II .
Fabrication of the steel structure
: 6 500 ton
Fabrication of the technological equipments
: 4 000 ton
(Casing of the filters ,some parts for the clinker cooler ,cyclones ,
Sayfa 18 / 26
.
hoppers, gas ducts ,chimney e.t.c. )
Fabrication of the mechanical Equipments
: 1 500 ton
(Casing of the coal, cement and raw mills ,seperators ,base frame of
the rollers for the rotary kiln ,base frame of the roller press and their accessories ,valves
,expansion joints ,air slides and e.t.c.)
Total weight of the installation works : 15 000 ton
Insulation works
: 20 000 m2
Cladding works
: 35 000 m2
General installation works for air, water and lubrication
102. DENİZLİ ÇİMENTO SAN. TİC. A.Ş. / 2012
Denizli Cement Plant
Cladding works for the roof of the cement silo
Weight of the fabrication works
: 46 ton
Weight of the installation works : 46 ton
Weight of the dismounting works : 5 ton
Cladding of the roof
: 600m²
103. ÇİMSA ÇİMENTO SAN.VE TİC.A.Ş. / 2012
Eskisehir Cement Plant
Fabrication and installation works for the transport line of the raw metarial
Weight of the fabrication works
:
220
ton
Weight of the installation works
:
235
ton
Weight of the dismounting works :
120 ton
Insulation works
:
132
m2
Cladding Works
:
1350
m2
104. ÇİMSA ÇİMENTO SAN.VE TİC.A.Ş. 2012 / 2013
Mersin Cement Plant
Installation of the HAC (Cement facility with Calcium aluminate )
Weight of the fabrication works
:
485 ton
Weight of the installation works
:
570 ton
Weight of the dismounting works :
120 ton
Insulation works
:
295 m2
Cladding Works
:
4 500 m2
Sayfa 19 / 26
105. VİCAT BAŞTAŞ BAŞKENT ÇİM. SAN. VE TİC. A.Ş. / 2013
Bastas Cement Plant
Installation and fabrication works for the Roller Press Unit labelled BK -2
Weight of the fabrication of the technological equipments : 161 ton
Weight of the fabrication of the steel construction
: 877 ton
Weight of the fabrication of the mechanical equipments
:
45 ton
Weight of the installation of the both technological and process equipments
: 1230 ton
Installation of the steel construction
:
877 ton
Cladding works
: 7600 m²
Insulation works
: 3180 m²
106. ÖZBEKİSTAN DZHİZAK ÇİMENTO FABRİKASI.(DAL TEKNİK) / 2013
Fabrication of the paddle box for cement mill
Fabrication of the temporary support for rotary kiln
Fabrication of the support for the fan lines of the burner pipe
107. OYAK ÜNYE ÇİMENTO SAN. TİC. A.Ş. / 2014
Unye Cement Plant
Fabrication of the dryer shell and gas line equipments for the ATY system and
maintenance , installation ,commisionning works ( Ø3.0*25mt )
108. VİCAT – KONYA ÇİMENTO SAN. A.Ş. / 2014
Konya Cement Plant
Converting the chair pads to sliding system. ( Ø4.2mt )
109. YURT ÇİMENTO SAN A.Ş./ 2014
Mus Cement Plant
Replacement of the kiln shell (Ø 4.15 x 1.0 mt)
110. ÇİMSA ÇİMENTO SAN.VE TİC.A.Ş. / 2014
Kayseri Cement Plant
Dismounting and installation works for ID fan
Sayfa 20 / 26
111. LAFARGE EREĞLİ ÇİMENTO SAN VE TİC A.Ş./ 2013 / 2014
Eregli Cement Grinding Facility
Replacement of the shell of the cement mill and the girth gear- pinion
112. ÇİMSA ÇİMENTO SAN.VE TİC.A.Ş. / 2014
Kayseri Cement Plant
Installation and fabrication works for the transport line of the clinker with
trass
113. DENİZLİ ÇİMENTO SAN. A.Ş./ 2012 – 2013
Denizli Cement Plant
Fabrication and replacement of the kiln shell for the rotary kiln number 1 (Ø
4.6*7.5 mt / Ø 4.6*2.6mt)
114. OYAK – MARDİN ÇİMENTO SAN. TİC. A.Ş. / 2013
Mardin Cement Plant
Fabrication and replacement of the outlet kiln shell ( Ø 4.6*1.6mt)
115. NUH ÇİMENTO SANAYİ A.Ş. / 2013
Preperation of the heavy kiln shell together with tyre for the rotary kiln
number 3 on the ground as a spare part. FLS (Ø 5.5*2.8 mt. and Tyre)
116. OYAK – MARDİN ÇİMENTO SAN. TİC. A.Ş. / 2013
Mardin Cement Plant
Fabrication and replacement of the kiln shell for the rotary kiln number 1.
(Ø 4.6*2.6mt)
117. CİMPOR YOZGAT ÇİMENTO SAN. TİC. A.Ş. / 2013
Yozgat Cement Plant
Fabrication of the two way valve for the inlet of the raw mill
118. DENİZLİ ÇİMENTO SAN. A.Ş./ 2014
Denizli Cement Plant
Fabrication and replacement of the kiln shell for the rotary kiln number 1.
(Ø 4.6*6.3 mt )
Sayfa 21 / 26
119. TRAÇİM ÇİMENTO SANAYİ VE TİCARET A.Ş . 2013/2014
Fabrication, installation and commisionning works of the roller press unit for
the cement mill number 1
Project
:
SINOMA-CHINA
Model
:
TRD 140/140
Capacity :
500/650 ton
120. SANÇİM ÇİMENTO SANAYİ VE TİCARET A.Ş. / 2014
Bilecik Cement Plant
Fabrication of the kiln shell ( Ø 4.6*1.0mt)
121. SANKO – ÇİMKO ÇİMENTO FABRİKASI / 2014
Kahramanmaras Cement Plant
Replacement of the outlet kiln shell (Ø 5.5 x 1.45 mt)
122. ÇİMSA ÇİMENTO SAN. TİC. A.Ş. / 2014
Eskisehir Cement Plant
Replacement of the kiln shell (Ø 3.6 x 18 mt)
Firma: FLS Ø 3,6x55 mt
Fabrication and installation of the tertiary air duct
123. ÇİMSA ÇİMENTO SAN. TİC. A.Ş. / 2014
Eskisehir Cement Plant
Modernization of the pipes of the ID fan for the facility number 1.
124 . ÇİMSA ÇİMENTO SAN. TİC. A.Ş. / 2014
Eskisehir Cement Plant
Civil and mechanical works of the kiln feeding system for the facility
number 1
125. ÜST YAPI MADENCİLİK A.Ş. / 2014
Kav-Cim Kavak Cement Plant
Fabrication and installation works of the stacker and reclaimer system for
the coal stock hall
Sayfa 22 / 26
Fabrication and installation works of the stacker and reclaimer system for
the raw metarial stock hall
Fabrication and installation works of the stacker and reclaimer system for
the additive stock hall
126. ÜST YAPI MADENCİLİK A.Ş. / 2014
Kav-Cim Kavak Cement Plant
Fabrication and installation of the kiln shells. ( Ø 4.65*59mt)
127. TOROS TARIM A.Ş. /2014
Samsun Plant
Fabrication and replacement of the tyres, kiln shells under the tyre and
pulley of the dryer for the NPK unit NPK ( Ø 3.6*1.3mt+Ring) / ( Ø 3.6*1.8mt+Ring)
128. ÇİNKOM ÇİNKO KURŞUN METAL VE MADENCİLİK SAN.TİC.A.Ş. /2014
Kayseri Plant
Fabrication of the kiln shell fort he teksif rotary kiln ( Ø 2.6*14.85mt)
129. OYAK – MARDİN ÇİMENTO SAN. TİC. A.Ş. / 2014
Mardin Cement Plant
Fabrication of the outlet kiln Shell fort he rotary kiln number II
( Ø 4.35*1.6mt)
130. VİCAT BAŞTAŞ BAŞKENT ÇİM. SAN. VE TİC. A.Ş. / 2014
Bastas Cement Plant
Replacement of the chair pads for the rotary kiln number II
Replacement of the cyclones
Replacement of the pipes located on the preheater tower ( +120 m. from
the ground level.)
Fixation and installation of the screw conveyor inside the hopper for the
wasting system
Fabrication of the steel and technological equipments related to this job
and insulation works for this project.
Sayfa 23 / 26
131. SANKO – ÇİMKO ÇİMENTO FABRİKASI / 2014
Kahramanmaras Cement Plant
Replacement of the outlet kiln shell ( Ø 5.6*1.45mt)
Replacement of the inlet sealing of the rotary kiln.
Modification of the expansion joint at the tertiary air duct.
Installation of the weighing machine for clinker and modification of the
feeding station.
Modification of the system fans for the coal mill.
Replacement of the movable louvres of the coal mills.
132.
VİCAT BAŞTAŞ BAŞKENT ÇİM. SAN. VE TİC. A.Ş. / 2014
Baştaş Çimento Fabrikası
Fabrication and installation of the hopper for the roller press unit BK-2
133.
NUH ÇİMENTO SANAYİ A.Ş. / 2015
Installation of the heavy kiln shell section of the rotary kiln number 3
together with the tyre FLS (Ø 5.5*2.8 mt )
134.
NUH ÇİMENTO SANAYİ A.Ş. / 2015
Revision of the inlet chamber of the electrostatic precipitator for clinker
cooler for the clinker production line number 3
135.
SANKO – ÇİMKO ÇİMENTO FABRİKASI / 2015
Kahramanmaras Cement Plant
Fabrication of the outlet kiln shell section
136.
( Ø 5.6*1.6mt)
ÇİMSA ÇİMENTO SAN.VE TİC.A.Ş. / 2015
Kayseri Cement Plant
Fabrication and installation works for the dust coal
137.
VOTORANTİM ÇİMENTO SAN. TİC. A.Ş. / 2015
Samsun Cement Grinding facility.
Revision of the concrete support for the main drive unit of the cement mill
and replacement of the gear.
Sayfa 24 / 26
138.
TÜRKMEX ÇİNKO OKSİT VE ÇİNKO SÜLFAT FABRİKASI A.Ş./ 2015
Izmir Aliaga Facility.
Fabrication and installation of the dryer shell ( Ø 3.0*18.288mt)
139.
OYKA KAĞIT AMBALAJ SANAYİ VE TİCARET A.Ş./ 2015
Caycuma Plant
Fabrication of the Trommel used for peeling of the trunks for making paper( Ø
4.0*18.0mt)
140.
ORMAKSAN HİDROLİK VE MAKİNE SAN VE TİC LTD. ŞTİ / 2015
Equatorial Guinea.
Fabrication of the BSD Equipments for one of the FLS Project. ( Rotary kiln
sections, casing of the raw mill, casing of the seperator e.t.c.)
Weight of the fabrication works : 678 Ton.
141.
ERMADEN ERDEMİR MADENCİLİK SAN. VE TİC. A.Ş./ 2015
Divrigi Facility
Replacement of the part on the shell of the ball mill (Ø4400*7020mm)
Sayfa 25 / 26
NORM MAKINA SAN. INS. TIC. LTD. STI.
MARCH 2015
ONGOING PROJECTS
BATIÇİM BATI ANADOLU ÇİMENTO SAN. A.Ş./ SARTA LTD. ŞTİ./2015
1.
Soke Cement Plant
Fabrication and installation works for the roller press unit
Weight of the fabrication works: 452 Ton.
Weight of the installation works:600 Ton.
2.
BATIÇİM BATI ANADOLU ÇİMENTO SAN. A.Ş./ SARTA LTD. ŞTİ./2015
Soke Cement Plant
Fabrication and installation works of the fly ash silo (2750 m³ )
Weight of the fabrication works :234 Ton.
Weight of the installation works : 250 Ton.
3.
ÜST YAPI MADENCİLİK A.Ş. / 2015
Kav-Cim Kavak Cement Plant
Fabrication and installation works for the local equipments of the raw mill
( Ø5,2*13mt-Polysius)
Fabrication and installation of the electrostatic precipitator for the raw mill
and clinker cooler and cooling tower as well.
4.
ÇİMSA ÇİMENTO SAN. TİC. A.Ş. / 2015
Eskisehir Cement Plant
Civil and mechanical works for the dedusting system of the wagon loading
system for the facility number II.
5. VİTKOVİCE GEARWORKS A.Ş. / 2014
Erection of Bridge Scraper Machine – MBSK 600
Sayfa 26 / 26

Benzer belgeler

wellness

wellness sports machines. As a company established by people who professionally dedicated their lives to sports, Esjim improved it’s products in order to develop the efficiency as a result of many researche...

Detaylı

İndir - Laisy

İndir - Laisy strategies, customer satisfaction and brand awareness. In 2002, Köseoğlu DTM began production with spare felted ironing board cover, by improving the production; the firm producing ironing boards, ...

Detaylı

Birikim Mühendislik Endüstriyel Yüklenim Limited Şirketi

Birikim Mühendislik Endüstriyel Yüklenim Limited Şirketi Birikim is a young company based upon personal experience of more than 35 years in the above mentioned sectors. Within the past 13 years, Birikim has been evolved to a company performing complete i...

Detaylı

çimento sanayi referans listesi

çimento sanayi referans listesi Revision of the inlet seal for the rotary kiln. Revision of the electrostatic presipitator for klinker cooler. Fabrication of the expansion joint for cooling tower. ( Ø3020*1260 ) Execution of the ...

Detaylı